IMPACTFEES.ORG

Parkland, Florida Impact Fees

Parkland applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $35,234.00 per unit (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Parkland impact fees by project type

Parkland: Single-Family Impact Fees

A new single-family home in Parkland pays $35,234.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $26,425.00.

The largest line items are School Impact Fee (Broward County) ($8,809.00).

Sewer (WW-Reuse) Connection / Capacity Fee (North Springs Improvement District), Water Connection / Capacity Fee (North Springs Improvement District), Public Safety Facilities Impact Fee (City of Parkland), Library Facilities Impact Fee (City of Parkland), General Government Facilities Impact Fee (City of Parkland), and Park Facilities Impact Fee (City of Parkland) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$558.00
  • Water Connection / Capacity Fee (North Springs Improvement District)
    North Springs Improvement District
    Parkland has no city utility - three providers by address (NSID largest; also City of Coconut Creek 954-973-6732 and private Parkland Utilities Inc. 888-233-9105). Water connection fee $558 (NSID Rate Res. 2024-15). Coconut Creek/Parkland Utilities connection fees not retrieved; parcel-dependent, hence Unconfirmed. NSID 954-752-0400.
    $558.00Requires confirmation
Sewer$11,391.00
  • Sewer (WW-Reuse) Connection / Capacity Fee (North Springs Improvement District)
    North Springs Improvement District
    Wastewater (reuse-based) connection fee $11,391 (NSID Rate Res. 2024-15). Parkland has no city utility - NSID largest of three providers by parcel; also Coconut Creek 954-973-6732, Parkland Utilities Inc. 888-233-9105. NSID wastewater is reuse-based, hence the high figure. Parcel-dependent, hence Unconfirmed. NSID 954-752-0400.
    $11,391.00Requires confirmation
City$14,476.00
  • Park Facilities Impact Fee (City of Parkland)
    City of Parkland
    City Impact Fee Schedule, Ord. 2020-007. Park Facilities $9,873 (SFR detached). Three more categories are separate City records: Public Safety $1,905, General Government $1,715, Library $983 (SFR total $14,476). The impact fee PDF (Ord. 2020-007) is UNDATED and the linked user-fee schedule is still FY2024-25, while an FY2026 schedule (eff. 10/1/2025) and a separate 'Fee Schedule Effective July 1 2026 (HB 803)' both exist; treat these amounts as posted-but-possibly-superseded; confirm with Building Dept 954-753-5447. (Interim Fire Fee $290/DU annual is a fire assessment, not an impact fee.)
    $9,873.00Requires confirmation
  • Public Safety Facilities Impact Fee (City of Parkland)
    City of Parkland
    City Impact Fee Schedule, Ord. 2020-007. Public Safety Facilities $1,905 (SFR detached). Park Facilities $9,873 is the default City record. Impact fee PDF undated and possibly superseded (FY2026 & July-2026 HB 803 schedules exist) - confirm Building Dept 954-753-5447.
    $1,905.00Requires confirmation
  • General Government Facilities Impact Fee (City of Parkland)
    City of Parkland
    City Impact Fee Schedule, Ord. 2020-007. General Government Facilities $1,715 (SFR detached). Park Facilities $9,873 is the default. PDF undated/possibly superseded - confirm Building 954-753-5447.
    $1,715.00Requires confirmation
  • Library Facilities Impact Fee (City of Parkland)
    City of Parkland
    City Impact Fee Schedule, Ord. 2020-007. Library Facilities $983 (SFR detached). Park Facilities $9,873 is the default. SFR 4-category total $14,476. PDF undated/possibly superseded - confirm Building 954-753-5447.
    $983.00Requires confirmation
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $8,809.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
Total (Parkland): $35,234.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Parkland: Multifamily Impact Fees

A new multifamily unit in Parkland pays $20,794.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $19,319.00.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00).

Library Facilities Impact Fee (City of Parkland, MF), Public Safety Facilities Impact Fee (City of Parkland, MF), General Government Facilities Impact Fee (City of Parkland, MF), Park Facilities Impact Fee (City of Parkland, MF), Water Connection / Capacity Fee (North Springs Improvement District, MF), and Sewer (WW-Reuse) Connection / Capacity Fee (North Springs Improvement District, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$446.00
  • Water Connection / Capacity Fee (North Springs Improvement District, MF)
    North Springs Improvement District
    MF water connection fee $446/unit (NSID Rate Res. 2024-15). Parkland has no city utility - NSID largest of three providers by parcel; also Coconut Creek 954-973-6732, Parkland Utilities Inc. 888-233-9105. Parcel-dependent, hence Unconfirmed. NSID 954-752-0400.
    $446.00Requires confirmation
Sewer$9,113.00
City$9,760.00
  • Park Facilities Impact Fee (City of Parkland, MF)
    City of Parkland
    City Impact Fee Schedule, Ord. 2020-007. Park Facilities $6,657/MF unit. Three more categories are separate MF City records: Public Safety $1,284, General Government $1,156, Library $663 (MF total $9,760). PDF undated; FY2026 & July-2026 (HB 803) schedules also exist - possibly superseded; confirm Building Dept 954-753-5447.
    $6,657.00Requires confirmation
  • Public Safety Facilities Impact Fee (City of Parkland, MF)
    City of Parkland
    City Impact Fee Schedule, Ord. 2020-007. Public Safety Facilities $1,284/MF unit. Park Facilities $6,657 is the default MF City record. PDF undated/possibly superseded (FY2026 & July-2026 HB 803 schedules exist) - confirm Building 954-753-5447.
    $1,284.00Requires confirmation
  • General Government Facilities Impact Fee (City of Parkland, MF)
    City of Parkland
    City Impact Fee Schedule, Ord. 2020-007. General Government Facilities $1,156/MF unit. Park Facilities $6,657 is the default. PDF undated/possibly superseded - confirm Building 954-753-5447.
    $1,156.00Requires confirmation
  • Library Facilities Impact Fee (City of Parkland, MF)
    City of Parkland
    City Impact Fee Schedule, Ord. 2020-007. Library Facilities $663/MF unit. Park Facilities $6,657 is the default. MF 4-category total $9,760. PDF undated/possibly superseded - confirm Building 954-753-5447.
    $663.00Requires confirmation
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $1,475.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
Total (Parkland): $20,794.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Parkland: Commercial Impact Fees

Commercial development in Parkland pays $1.00 per square foot in impact fees, plus $13,503.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $63,688.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($12,872.00 one-time), Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($631.00 one-time) and Public Safety Facilities Impact Fee (City of Parkland, Commercial) ($0.53/sq ft).

View the full fee schedule
Water$631.00 one-time
  • Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum
    North Springs Improvement District (NSID)
    Parkland's water and wastewater provider is the North Springs Improvement District (NSID), an independent special district (it also serves parts of Coral Springs). NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) = Water $631.00 / Wastewater-Reuse $12,872.00. Residential comparison: Single-Family per dwelling unit $558 water / $11,391 wastewater; Medium/High Density $446 / $9,113. Amount entered = the published 1.0-ERC commercial minimum. NONRES BASIS IS FIXTURE UNITS, NOT METER SIZE: per NSID's own footnote, 'An Equivalent Residential Connection (ERC) for commercial customers was defined as 25 fixture units, but will be defined as 22 fixture units. Minimum of one (1) ERC per unit. Any fraction of an ERC will be considered one (1) ERC.' Total fee = ceil(fixture units / 22) × $631. No meter-size capacity table exists. Separate from meter fees and deposits (5/8" $400, 1" $600 — those are meter purchase/install, not capacity). NSID also charges a Water & Wastewater plan review/inspection fee of 2.5% of construction cost (permit fee, not entered). Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
    $631.00 one-time
Sewer$12,872.00 one-time
  • Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum
    North Springs Improvement District (NSID)
    NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) Wastewater/Reuse = $12,872.00 (water counterpart is only $631.00 — the disparity is as published; NSID's wastewater/reuse expansion carries the capital load). Residential comparison: Single-Family $11,391 per dwelling unit; Medium/High Density $9,113. Amount entered = the published 1.0-ERC commercial minimum. Commercial ERC = 22 fixture units (formerly 25); minimum 1 ERC per unit; any fraction of an ERC counts as a full ERC. Total fee = ceil(fixture units / 22) × $12,872. No meter-size table. Irrigation connection is a separate $166 per connection. Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
    $12,872.00 one-time
City$1.00/sq ft
  • Public Safety Facilities Impact Fee (City of Parkland, Commercial)
    City of Parkland
    City of Parkland FY2025-2026 User Fee and Charge for Services Schedule (effective June 4, 2026), 'City Impact Fees Other' table + 'Public Safety Facilities Impact Fee Schedule', pp.20-21; rates dated October 1, 2025. Adopted under Ordinance 2020-007. Schedule row: Non Residential → Commercial = $0.5282 per square foot. Residential comparison rows: SFD $2,112.99 / MF $1,503.01 per housing unit. Rates are indexed annually.
    $0.53/sq ft
  • General Government Facilities Impact Fee (City of Parkland, Commercial)
    City of Parkland
    FY2025-2026 Fee Schedule (eff. 6/4/2026), General Government Facilities Impact Fee Schedule p.21; rates dated 10/1/2025; Ordinance 2020-007. Schedule row: Non Residential → Commercial = $0.4755 per square foot. Residential comparison: SFD $1,902.75 / MF $1,282.58 per housing unit.
    $0.48/sq ft
  • Park Facilities Impact Fee (City of Parkland, Commercial)
    City of Parkland
    CONFIRMED $0 for nonresidential. FY2025-2026 Fee Schedule p.21, Park Facilities Impact Fee Schedule (Ord. 2020-007): the schedule publishes a Residential / Per Housing Unit table ONLY (SFD $10,951.63; Multi-Family $7,384.90) — there is NO Non Residential table, unlike the Public Safety and General Government schedules which do have one. Library Facilities Impact Fee is likewise residential-only ($1,090.30 SFD / $735.32 MF) — also $0 for nonres. The Non Ad-Valorem Interim Fire Fee is a recurring annual assessment (residential only), not an impact fee, and is excluded.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Parkland): $1.00/sq ft + $13,503.00 one-time (≈ $63,688.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:North Springs Improvement District (NSID) City of Parkland Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Parkland: Industrial Impact Fees

Industrial development in Parkland pays $0.41 per square foot in impact fees, plus $13,503.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $34,108.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($12,872.00 one-time), Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($631.00 one-time) and Public Safety Facilities Impact Fee (City of Parkland, Industrial) ($0.21/sq ft).

View the full fee schedule
Water$631.00 one-time
  • Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum
    North Springs Improvement District (NSID)
    Parkland's water and wastewater provider is the North Springs Improvement District (NSID), an independent special district (it also serves parts of Coral Springs). NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) = Water $631.00 / Wastewater-Reuse $12,872.00. Residential comparison: Single-Family per dwelling unit $558 water / $11,391 wastewater; Medium/High Density $446 / $9,113. Amount entered = the published 1.0-ERC commercial minimum. NONRES BASIS IS FIXTURE UNITS, NOT METER SIZE: per NSID's own footnote, 'An Equivalent Residential Connection (ERC) for commercial customers was defined as 25 fixture units, but will be defined as 22 fixture units. Minimum of one (1) ERC per unit. Any fraction of an ERC will be considered one (1) ERC.' Total fee = ceil(fixture units / 22) × $631. No meter-size capacity table exists. Separate from meter fees and deposits (5/8" $400, 1" $600 — those are meter purchase/install, not capacity). NSID also charges a Water & Wastewater plan review/inspection fee of 2.5% of construction cost (permit fee, not entered). Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
    $631.00 one-time
Sewer$12,872.00 one-time
  • Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum
    North Springs Improvement District (NSID)
    NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) Wastewater/Reuse = $12,872.00 (water counterpart is only $631.00 — the disparity is as published; NSID's wastewater/reuse expansion carries the capital load). Residential comparison: Single-Family $11,391 per dwelling unit; Medium/High Density $9,113. Amount entered = the published 1.0-ERC commercial minimum. Commercial ERC = 22 fixture units (formerly 25); minimum 1 ERC per unit; any fraction of an ERC counts as a full ERC. Total fee = ceil(fixture units / 22) × $12,872. No meter-size table. Irrigation connection is a separate $166 per connection. Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
    $12,872.00 one-time
City$0.41/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Parkland): $0.41/sq ft + $13,503.00 one-time (≈ $34,108.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:North Springs Improvement District (NSID) City of Parkland Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Parkland: Office Impact Fees

Office development in Parkland pays $1.23 per square foot in impact fees, plus $13,503.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $44,143.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($12,872.00 one-time), Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($631.00 one-time) and Public Safety Facilities Impact Fee (City of Parkland, Office) ($0.64/sq ft).

View the full fee schedule
Water$631.00 one-time
  • Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum
    North Springs Improvement District (NSID)
    Parkland's water and wastewater provider is the North Springs Improvement District (NSID), an independent special district (it also serves parts of Coral Springs). NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) = Water $631.00 / Wastewater-Reuse $12,872.00. Residential comparison: Single-Family per dwelling unit $558 water / $11,391 wastewater; Medium/High Density $446 / $9,113. Amount entered = the published 1.0-ERC commercial minimum. NONRES BASIS IS FIXTURE UNITS, NOT METER SIZE: per NSID's own footnote, 'An Equivalent Residential Connection (ERC) for commercial customers was defined as 25 fixture units, but will be defined as 22 fixture units. Minimum of one (1) ERC per unit. Any fraction of an ERC will be considered one (1) ERC.' Total fee = ceil(fixture units / 22) × $631. No meter-size capacity table exists. Separate from meter fees and deposits (5/8" $400, 1" $600 — those are meter purchase/install, not capacity). NSID also charges a Water & Wastewater plan review/inspection fee of 2.5% of construction cost (permit fee, not entered). Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
    $631.00 one-time
Sewer$12,872.00 one-time
  • Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum
    North Springs Improvement District (NSID)
    NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) Wastewater/Reuse = $12,872.00 (water counterpart is only $631.00 — the disparity is as published; NSID's wastewater/reuse expansion carries the capital load). Residential comparison: Single-Family $11,391 per dwelling unit; Medium/High Density $9,113. Amount entered = the published 1.0-ERC commercial minimum. Commercial ERC = 22 fixture units (formerly 25); minimum 1 ERC per unit; any fraction of an ERC counts as a full ERC. Total fee = ceil(fixture units / 22) × $12,872. No meter-size table. Irrigation connection is a separate $166 per connection. Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
    $12,872.00 one-time
City$1.23/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Parkland): $1.23/sq ft + $13,503.00 one-time (≈ $44,143.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:North Springs Improvement District (NSID) City of Parkland Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Parkland

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Parkland, Florida?

A new single-family home in Parkland pays $35,234.00 per unit in combined impact fees (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Parkland?

Commercial development in Parkland pays $1.00 per square foot in impact fees, plus $13,503.00 in one-time water and sewer connection fees, about $63,688.00 for a 50,000 sq ft building.

Does Parkland charge its own impact fees?

Yes. Parkland levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Parkland, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000