Parkland impact fees by project type
Parkland: Single-Family Impact Fees
A new single-family home in Parkland pays $8,809.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.
The largest line items are School Impact Fee (SFR, 3 or fewer BR) ($8,809.00).
Sewer Connection / Capacity Fee (North Springs Improvement District) and Water Connection / Capacity Fee (North Springs Improvement District) and Park/Recreational Impact Fee (Broward County) and City Impact Fees (City of Parkland) and Road Impact / Transportation Concurrency Fee (Broward County) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection / Capacity Fee (North Springs Improvement District)Contact jurisdiction/utility to verifyRequires confirmationNorth Springs Improvement District (NSID)Parkland water + wastewater provided by North Springs Improvement District (NSID), an independent special district serving Parkland + parts of Coral Springs. Connection/capacity fees set by NSID resolution, not published online. $0 placeholder. ⚠️ VERIFY: NSID (954) 753-0380.
- Sewer Connection / Capacity Fee (North Springs Improvement District)Contact jurisdiction/utility to verifyRequires confirmationNorth Springs Improvement District (NSID)Wastewater collection via NSID. Connection/capacity fees by NSID resolution, not published online. $0 placeholder. ⚠️ VERIFY: NSID (954) 753-0380.
- City Impact Fees (City of Parkland)Contact jurisdiction/utility to verifyRequires confirmationCity of ParklandNo standalone municipal development impact fee confirmed. $0 placeholder. ⚠️ VERIFY: Parkland (954) 753-5040.
- School Impact Fee (SFR, 3 or fewer BR)$8,809.00School Board of Broward CountyBroward County School Impact Fee: SF 3-or-fewer BR = $8,809 (4+ BR = $11,070). Eff. Jan 1, 2022 per Ord. 2020-36. Countywide.
- Park/Recreational Impact Fee (Broward County)Contact jurisdiction/utility to verifyRequires confirmationBroward CountyCounty park impact fee applies only if platting required. $0 placeholder. ⚠️ VERIFY: 954-357-6666.
- Road Impact / Transportation Concurrency Fee (Broward County)Contact jurisdiction/utility to verifyRequires confirmationBroward CountyRoad impact or transportation concurrency fee, site-district dependent. $0 placeholder. ⚠️ VERIFY: 954-357-6666 opt 2.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Parkland: Multifamily Impact Fees
A new multifamily unit in Parkland pays $1,475.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.
The largest line items are School Impact Fee (MF, Mid-Rise, 2+ BR) ($1,475.00).
Park/Recreational Impact Fee (Broward County, MF) and City Impact Fees (City of Parkland, MF) and Road Impact / Transportation Concurrency Fee (Broward County, MF) and Water Connection / Capacity Fee (North Springs Improvement District, MF) and Sewer Connection / Capacity Fee (North Springs Improvement District, MF) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection / Capacity Fee (North Springs Improvement District, MF)Contact jurisdiction/utility to verifyRequires confirmationNorth Springs Improvement District (NSID)Parkland water via NSID. Connection/capacity fees by NSID resolution, not published online. $0 placeholder. ⚠️ VERIFY MF sizing: NSID (954) 753-0380.
- Sewer Connection / Capacity Fee (North Springs Improvement District, MF)Contact jurisdiction/utility to verifyRequires confirmationNorth Springs Improvement District (NSID)Wastewater via NSID. Connection/capacity fees by resolution, not published. $0 placeholder. ⚠️ VERIFY: NSID (954) 753-0380.
- City Impact Fees (City of Parkland, MF)Contact jurisdiction/utility to verifyRequires confirmationCity of ParklandNo standalone municipal development impact fee confirmed. $0 placeholder. ⚠️ VERIFY: Parkland (954) 753-5040.
- School Impact Fee (MF, Mid-Rise, 2+ BR)$1,475.00School Board of Broward CountyBroward County School Impact Fee, Mid-Rise 2+BR = $1,475. Eff. Jan 1, 2022 per Ord. 2020-36. Default MF tier.
- Park/Recreational Impact Fee (Broward County, MF)Contact jurisdiction/utility to verifyRequires confirmationBroward CountyCounty park impact fee applies only if platting required. $0 placeholder. ⚠️ VERIFY: 954-357-6666.
- Road Impact / Transportation Concurrency Fee (Broward County, MF)Contact jurisdiction/utility to verifyRequires confirmationBroward CountyRoad impact or transportation concurrency fee, site-district dependent. $0 placeholder. ⚠️ VERIFY: 954-357-6666 opt 2.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Parkland: Commercial Impact Fees
Commercial development in Parkland pays $1.00 per square foot in impact fees, plus $13,503.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $63,688.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($12,872.00 one-time), Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($631.00 one-time) and Public Safety Facilities Impact Fee (City of Parkland, Commercial) ($0.53/sq ft).
View the full fee schedule
- Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum$631.00 one-timeNorth Springs Improvement District (NSID)Parkland's water and wastewater provider is the North Springs Improvement District (NSID), an independent special district (it also serves parts of Coral Springs). NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) = Water $631.00 / Wastewater-Reuse $12,872.00. Residential comparison: Single-Family per dwelling unit $558 water / $11,391 wastewater; Medium/High Density $446 / $9,113. Amount entered = the published 1.0-ERC commercial minimum. NONRES BASIS IS FIXTURE UNITS, NOT METER SIZE: per NSID's own footnote, 'An Equivalent Residential Connection (ERC) for commercial customers was defined as 25 fixture units, but will be defined as 22 fixture units. Minimum of one (1) ERC per unit. Any fraction of an ERC will be considered one (1) ERC.' Total fee = ceil(fixture units / 22) × $631. No meter-size capacity table exists. Separate from meter fees and deposits (5/8" $400, 1" $600 — those are meter purchase/install, not capacity). NSID also charges a Water & Wastewater plan review/inspection fee of 2.5% of construction cost (permit fee, not entered). Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
- Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum$12,872.00 one-timeNorth Springs Improvement District (NSID)NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) Wastewater/Reuse = $12,872.00 (water counterpart is only $631.00 — the disparity is as published; NSID's wastewater/reuse expansion carries the capital load). Residential comparison: Single-Family $11,391 per dwelling unit; Medium/High Density $9,113. Amount entered = the published 1.0-ERC commercial minimum. Commercial ERC = 22 fixture units (formerly 25); minimum 1 ERC per unit; any fraction of an ERC counts as a full ERC. Total fee = ceil(fixture units / 22) × $12,872. No meter-size table. Irrigation connection is a separate $166 per connection. Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
- Public Safety Facilities Impact Fee (City of Parkland, Commercial)$0.53/sq ftCity of ParklandCity of Parkland FY2025-2026 User Fee and Charge for Services Schedule (effective June 4, 2026), 'City Impact Fees Other' table + 'Public Safety Facilities Impact Fee Schedule', pp.20-21; rates dated October 1, 2025. Adopted under Ordinance 2020-007. Schedule row: Non Residential → Commercial = $0.5282 per square foot. Residential comparison rows: SFD $2,112.99 / MF $1,503.01 per housing unit. Rates are indexed annually.
- General Government Facilities Impact Fee (City of Parkland, Commercial)$0.48/sq ftCity of ParklandFY2025-2026 Fee Schedule (eff. 6/4/2026), General Government Facilities Impact Fee Schedule p.21; rates dated 10/1/2025; Ordinance 2020-007. Schedule row: Non Residential → Commercial = $0.4755 per square foot. Residential comparison: SFD $1,902.75 / MF $1,282.58 per housing unit.
- Park Facilities Impact Fee (City of Parkland, Commercial)$0.00City of ParklandCONFIRMED $0 for nonresidential. FY2025-2026 Fee Schedule p.21, Park Facilities Impact Fee Schedule (Ord. 2020-007): the schedule publishes a Residential / Per Housing Unit table ONLY (SFD $10,951.63; Multi-Family $7,384.90) — there is NO Non Residential table, unlike the Public Safety and General Government schedules which do have one. Library Facilities Impact Fee is likewise residential-only ($1,090.30 SFD / $735.32 MF) — also $0 for nonres. The Non Ad-Valorem Interim Fire Fee is a recurring annual assessment (residential only), not an impact fee, and is excluded.
- County Impact / Transportation Concurrency Fees (Broward County, Commercial)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).
Parkland: Industrial Impact Fees
Industrial development in Parkland pays $0.41 per square foot in impact fees, plus $13,503.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $34,108.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($12,872.00 one-time), Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($631.00 one-time) and Public Safety Facilities Impact Fee (City of Parkland, Industrial) ($0.21/sq ft).
View the full fee schedule
- Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum$631.00 one-timeNorth Springs Improvement District (NSID)Parkland's water and wastewater provider is the North Springs Improvement District (NSID), an independent special district (it also serves parts of Coral Springs). NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) = Water $631.00 / Wastewater-Reuse $12,872.00. Residential comparison: Single-Family per dwelling unit $558 water / $11,391 wastewater; Medium/High Density $446 / $9,113. Amount entered = the published 1.0-ERC commercial minimum. NONRES BASIS IS FIXTURE UNITS, NOT METER SIZE: per NSID's own footnote, 'An Equivalent Residential Connection (ERC) for commercial customers was defined as 25 fixture units, but will be defined as 22 fixture units. Minimum of one (1) ERC per unit. Any fraction of an ERC will be considered one (1) ERC.' Total fee = ceil(fixture units / 22) × $631. No meter-size capacity table exists. Separate from meter fees and deposits (5/8" $400, 1" $600 — those are meter purchase/install, not capacity). NSID also charges a Water & Wastewater plan review/inspection fee of 2.5% of construction cost (permit fee, not entered). Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
- Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum$12,872.00 one-timeNorth Springs Improvement District (NSID)NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) Wastewater/Reuse = $12,872.00 (water counterpart is only $631.00 — the disparity is as published; NSID's wastewater/reuse expansion carries the capital load). Residential comparison: Single-Family $11,391 per dwelling unit; Medium/High Density $9,113. Amount entered = the published 1.0-ERC commercial minimum. Commercial ERC = 22 fixture units (formerly 25); minimum 1 ERC per unit; any fraction of an ERC counts as a full ERC. Total fee = ceil(fixture units / 22) × $12,872. No meter-size table. Irrigation connection is a separate $166 per connection. Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
- Public Safety Facilities Impact Fee (City of Parkland, Industrial)$0.21/sq ftCity of ParklandFY2025-2026 Fee Schedule (eff. 6/4/2026), Public Safety Facilities Impact Fee Schedule p.21; rates dated 10/1/2025; Ordinance 2020-007. Schedule row: Non Residential → Industrial = $0.2113 per square foot.
- General Government Facilities Impact Fee (City of Parkland, Industrial)$0.20/sq ftCity of ParklandFY2025-2026 Fee Schedule (eff. 6/4/2026), General Government Facilities Impact Fee Schedule p.21; rates dated 10/1/2025; Ordinance 2020-007. Schedule row: Non Residential → Industrial = $0.2008 per square foot.
- Park Facilities Impact Fee (City of Parkland, Industrial)$0.00City of ParklandCONFIRMED $0 for nonresidential. FY2025-2026 Fee Schedule p.21: Park Facilities and Library Facilities impact fee schedules (Ord. 2020-007) publish Residential / Per Housing Unit rows only — no Non Residential table exists for either.
- County Impact / Transportation Concurrency Fees (Broward County, Industrial)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).
Parkland: Office Impact Fees
Office development in Parkland pays $1.23 per square foot in impact fees, plus $13,503.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 25,000 sq ft building, that comes to about $44,143.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($12,872.00 one-time), Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum ($631.00 one-time) and Public Safety Facilities Impact Fee (City of Parkland, Office) ($0.64/sq ft).
View the full fee schedule
- Water Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum$631.00 one-timeNorth Springs Improvement District (NSID)Parkland's water and wastewater provider is the North Springs Improvement District (NSID), an independent special district (it also serves parts of Coral Springs). NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) = Water $631.00 / Wastewater-Reuse $12,872.00. Residential comparison: Single-Family per dwelling unit $558 water / $11,391 wastewater; Medium/High Density $446 / $9,113. Amount entered = the published 1.0-ERC commercial minimum. NONRES BASIS IS FIXTURE UNITS, NOT METER SIZE: per NSID's own footnote, 'An Equivalent Residential Connection (ERC) for commercial customers was defined as 25 fixture units, but will be defined as 22 fixture units. Minimum of one (1) ERC per unit. Any fraction of an ERC will be considered one (1) ERC.' Total fee = ceil(fixture units / 22) × $631. No meter-size capacity table exists. Separate from meter fees and deposits (5/8" $400, 1" $600 — those are meter purchase/install, not capacity). NSID also charges a Water & Wastewater plan review/inspection fee of 2.5% of construction cost (permit fee, not entered). Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
- Wastewater / Reuse Connection Fee (North Springs Improvement District) — Commercial, 1 ERC minimum$12,872.00 one-timeNorth Springs Improvement District (NSID)NSID Billing Rates — 'Wastewater/Reuse Connection Fees' table (FY2026): Commercial (Per ERC) Wastewater/Reuse = $12,872.00 (water counterpart is only $631.00 — the disparity is as published; NSID's wastewater/reuse expansion carries the capital load). Residential comparison: Single-Family $11,391 per dwelling unit; Medium/High Density $9,113. Amount entered = the published 1.0-ERC commercial minimum. Commercial ERC = 22 fixture units (formerly 25); minimum 1 ERC per unit; any fraction of an ERC counts as a full ERC. Total fee = ceil(fixture units / 22) × $12,872. No meter-size table. Irrigation connection is a separate $166 per connection. Contact: NSID 954-752-0400 opt.1, nsid@nsidfl.gov.
- Public Safety Facilities Impact Fee (City of Parkland, Office)$0.64/sq ftCity of ParklandFY2025-2026 Fee Schedule (eff. 6/4/2026), Public Safety Facilities Impact Fee Schedule p.21; rates dated 10/1/2025; Ordinance 2020-007. Schedule row: Non Residential → Office = $0.6445 per square foot.
- General Government Facilities Impact Fee (City of Parkland, Office)$0.58/sq ftCity of ParklandFY2025-2026 Fee Schedule (eff. 6/4/2026), General Government Facilities Impact Fee Schedule p.21; rates dated 10/1/2025; Ordinance 2020-007. Schedule row: Non Residential → Office = $0.5811 per square foot.
- Park Facilities Impact Fee (City of Parkland, Office)$0.00City of ParklandCONFIRMED $0 for nonresidential. FY2025-2026 Fee Schedule p.21: Park Facilities and Library Facilities impact fee schedules (Ord. 2020-007) publish Residential / Per Housing Unit rows only — no Non Residential table exists for either.
- County Impact / Transportation Concurrency Fees (Broward County, Office)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).
Estimate your project in Parkland
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Parkland, Florida?
A new single-family home in Parkland pays $8,809.00 per unit in combined impact fees (rates sourced July 12, 2026).
How much are commercial impact fees in Parkland?
Commercial development in Parkland pays $1.00 per square foot in impact fees, plus $13,503.00 in one-time water and sewer connection fees, about $63,688.00 for a 50,000 sq ft building.
Does Parkland charge its own impact fees?
Yes. Parkland levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Parkland, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Broward County impact fees page.