Pompano Beach, Florida Impact Fees

Pompano Beach applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $10,339.00 per unit (rates sourced July 14, 2026). The full breakdown is below.

Pompano Beach impact fees by project type

Pompano Beach: Single-Family Impact Fees

A new single-family home in Pompano Beach pays $10,339.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $1,530.00.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Water Capital Recovery Fee (City of Pompano Beach) ($985.00) and Wastewater Capital Recovery Fee (City of Pompano Beach) ($545.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$985.00
  • Water Capital Recovery Fee (City of Pompano Beach)
    City of Pompano Beach Utilities
    Water Capital Recovery Fee, base $985/ERC, 5/8"-3/4" = 1.0 ERC. Code Sec. 50.13(B); Ord. 88-21, most recently amended Ord. 2022-45 (passed 4-26-22). Meter table: 3/4" $985 / 1" $1,675 / 1.5" $3,252 / 2" $5,224 / 3" $9,857. City owns water treatment + distribution. Utilities 954-786-4637.
    $985.00
Sewer$545.00
  • Wastewater Capital Recovery Fee (City of Pompano Beach)
    City of Pompano Beach Utilities
    Wastewater Capital Recovery Fee, base $545/ERC, 3/4" = 1.0 ERC. Code Sec. 51.11(B); Ord. 88-21, most recently Ord. 2009-12 (passed 11-25-08). Water/sewer separate, not combined. Sewer collection owned by city; treatment at Broward County North Regional WWTP. WW CRF unamended since Nov 2008 while water updated Apr 2022 - still the posted codified schedule (2026 S-122 supplement). Utilities 954-786-4637.
    $545.00
City$0.00
  • City Impact Fees (City of Pompano Beach)
    City of Pompano Beach
    No city impact fee (confirmed none). Checked (a) full Title XV Land Usage chapter list (150-160) - no impact-fee chapter; (b) Zoning Code Appendix C Fee Schedule - P&Z application fees only (Ord. 2025-10); (c) Ch. 160 Public Art Sec. 160.07(A) applies to 'city construction projects' only, so no private-development public-art fee. 954-786-4600.
    $0.00
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Pompano Beach): $10,339.00

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pompano Beach: Multifamily Impact Fees

A new multifamily unit in Pompano Beach pays at least $1,475.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00).

Water Capacity Charge (City of Pompano Beach, MF) and Wastewater Capacity Charge (City of Pompano Beach, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Capacity Charge (City of Pompano Beach, MF)
    City of Pompano Beach Utilities
    No per-unit multifamily capacity rate - Sec. 50.13 is strictly meter-size/ERC-ratio. Water CRF meter table: 3/4" $985 / 1" $1,675 / 1.5" $3,252 / 2" $5,224 / 3" $9,857. Do not impute per-unit. Utilities 954-786-4637.
    Requires confirmation
Sewer$0.00
City$0.00
  • City Impact Fee (City of Pompano Beach, MF)
    City of Pompano Beach
    No city impact fee (confirmed none). Checked (a) full Title XV Land Usage chapter list (150-160) - no impact-fee chapter; (b) Zoning Code Appendix C Fee Schedule - P&Z application fees only (Ord. 2025-10); (c) Ch. 160 Public Art Sec. 160.07(A) applies to 'city construction projects' only. 954-786-4600.
    $0.00
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $1,475.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Pompano Beach): $1,475.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pompano Beach: Commercial Impact Fees

Commercial development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $2,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Pompano Beach) — 1" meter ($1,675.00 one-time) and Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter ($928.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$1,675.00 one-time
  • Water Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §50.13 Water Capital Recovery Fee: base '$985 per Equivalent Residential Customer Unit (ERC) for each water tap purchased'; meter-size ERC ratios per AWWA M1. Charged PRIOR TO ISSUANCE OF A BUILDING PERMIT. Same schedule applies to residential and nonresidential (meter-size driven; no separate nonres table). Last amended Ord. 2022-45, passed 4-26-22. §50.03(D)(6): 'All rates, deposits, and charges specified in this chapter will be increased by 25% for water service outside of the incorporated limits.' Separate water TAPPING fee (§50.04(A), eff. 1-1-24: 3/4" $1,040; 1" $1,270; 1.5" $1,850; 2" $2,570; 3"+ at cost) is a physical-tap charge, not a capacity fee — not entered. Contact: Utilities 954-786-4637.
    $1,675.00 one-time
Sewer$928.00 one-time
  • Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §51.11 Wastewater Capital Recovery Fee: base '$545 per equivalent Residential Customer Unit (ERC) for each wastewater tap purchased'; same meter-size/ERC method as the water fee (AWWA M1 ratios). Most recent amendment Ord. 2009-12, passed 11-25-08. §51.03: sewer lateral construction/connection cost is borne by the developer at actual cost (no fixed fee) — not entered. Contact: Utilities 954-786-4637.
    $928.00 one-time
City$0.00
  • City Impact Fees (City of Pompano Beach, Commercial)
    City of Pompano Beach
    CONFIRMED $0 — Pompano Beach's only impact fee is the PARK IMPACT FEE, which is RESIDENTIAL-ONLY. Both adopted schedules (Park Impact Fees eff. 2-1-2021 and eff. 2-1-2024) are structured solely by Dwelling Type / Bedrooms / Fee per Unit (Single Family, Garden Apts, Town Houses, High Rise Apts, Duplex/Triplex/Fourplex, Mobile Homes) across Neighborhood Park Sectors 1-3 + citywide Community Parks — there is NO Commercial, Office, Industrial or any nonresidential row. No transportation/mobility fee and no other citywide impact fee exists. Also checked: Development Services Fee Schedule adopted 11-12-2024 (application/review fees only); Building Dept Fee Schedule (permit/plan review only); code chapter lists Title V (Ch. 50-54) and Title XV Land Usage (Ch. 150-160) — Ch. 154 has Concurrency §§154.70-.75 but no impact-fee article. Water/sewer capital recovery fees are separate (Code §§50.13, 51.11 — see W/S table). Contact: Planning & Zoning 954-786-4600.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Pompano Beach): $2,603.00 one-time (≈ $2,603.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Pompano Beach Utilities City of Pompano Beach Broward County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pompano Beach: Industrial Impact Fees

Industrial development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $2,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Pompano Beach) — 1" meter ($1,675.00 one-time) and Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter ($928.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$1,675.00 one-time
  • Water Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §50.13 Water Capital Recovery Fee: base '$985 per Equivalent Residential Customer Unit (ERC) for each water tap purchased'; meter-size ERC ratios per AWWA M1. Charged PRIOR TO ISSUANCE OF A BUILDING PERMIT. Same schedule applies to residential and nonresidential (meter-size driven; no separate nonres table). Last amended Ord. 2022-45, passed 4-26-22. §50.03(D)(6): 'All rates, deposits, and charges specified in this chapter will be increased by 25% for water service outside of the incorporated limits.' Separate water TAPPING fee (§50.04(A), eff. 1-1-24: 3/4" $1,040; 1" $1,270; 1.5" $1,850; 2" $2,570; 3"+ at cost) is a physical-tap charge, not a capacity fee — not entered. Contact: Utilities 954-786-4637.
    $1,675.00 one-time
Sewer$928.00 one-time
  • Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §51.11 Wastewater Capital Recovery Fee: base '$545 per equivalent Residential Customer Unit (ERC) for each wastewater tap purchased'; same meter-size/ERC method as the water fee (AWWA M1 ratios). Most recent amendment Ord. 2009-12, passed 11-25-08. §51.03: sewer lateral construction/connection cost is borne by the developer at actual cost (no fixed fee) — not entered. Contact: Utilities 954-786-4637.
    $928.00 one-time
City$0.00
  • City Impact Fees (City of Pompano Beach, Industrial)
    City of Pompano Beach
    CONFIRMED $0 — the city's only impact fee (Park Impact Fee, schedules eff. 2-1-2021 and 2-1-2024) is RESIDENTIAL-ONLY: rows are dwelling type by bedroom count, no nonresidential row. No transportation/mobility or other citywide impact fee. Development Services Fee Schedule (11-12-2024) and Building Fee Schedule contain only application/review/permit fees. W/S capital recovery fees separate (§§50.13, 51.11 — see W/S table). Contact: Planning & Zoning 954-786-4600.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Pompano Beach): $2,603.00 one-time (≈ $2,603.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Pompano Beach Utilities City of Pompano Beach Broward County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pompano Beach: Office Impact Fees

Office development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $2,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Pompano Beach) — 1" meter ($1,675.00 one-time) and Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter ($928.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$1,675.00 one-time
  • Water Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §50.13 Water Capital Recovery Fee: base '$985 per Equivalent Residential Customer Unit (ERC) for each water tap purchased'; meter-size ERC ratios per AWWA M1. Charged PRIOR TO ISSUANCE OF A BUILDING PERMIT. Same schedule applies to residential and nonresidential (meter-size driven; no separate nonres table). Last amended Ord. 2022-45, passed 4-26-22. §50.03(D)(6): 'All rates, deposits, and charges specified in this chapter will be increased by 25% for water service outside of the incorporated limits.' Separate water TAPPING fee (§50.04(A), eff. 1-1-24: 3/4" $1,040; 1" $1,270; 1.5" $1,850; 2" $2,570; 3"+ at cost) is a physical-tap charge, not a capacity fee — not entered. Contact: Utilities 954-786-4637.
    $1,675.00 one-time
Sewer$928.00 one-time
  • Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §51.11 Wastewater Capital Recovery Fee: base '$545 per equivalent Residential Customer Unit (ERC) for each wastewater tap purchased'; same meter-size/ERC method as the water fee (AWWA M1 ratios). Most recent amendment Ord. 2009-12, passed 11-25-08. §51.03: sewer lateral construction/connection cost is borne by the developer at actual cost (no fixed fee) — not entered. Contact: Utilities 954-786-4637.
    $928.00 one-time
City$0.00
  • City Impact Fees (City of Pompano Beach, Office)
    City of Pompano Beach
    CONFIRMED $0 — the city's only impact fee (Park Impact Fee, schedules eff. 2-1-2021 and 2-1-2024) is RESIDENTIAL-ONLY: rows are dwelling type by bedroom count, no nonresidential row. No transportation/mobility or other citywide impact fee. Development Services Fee Schedule (11-12-2024) and Building Fee Schedule contain only application/review/permit fees. W/S capital recovery fees separate (§§50.13, 51.11 — see W/S table). Contact: Planning & Zoning 954-786-4600.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Pompano Beach): $2,603.00 one-time (≈ $2,603.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Pompano Beach Utilities City of Pompano Beach Broward County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Pompano Beach

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Pompano Beach, Florida?

A new single-family home in Pompano Beach pays $10,339.00 per unit in combined impact fees (rates sourced July 14, 2026).

How much are commercial impact fees in Pompano Beach?

Commercial development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Pompano Beach charge its own impact fees?

Yes. Pompano Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Pompano Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.

Missing a jurisdiction? Get in touch.