Pompano Beach, Florida Impact Fees

Pompano Beach applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $12,686.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Pompano Beach Impact Fees by Project Type

Pompano Beach: Single-Family Impact Fees

A new single-family home in Pompano Beach pays $12,686.00 per unit in impact fees (rates sourced October 9, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $3,877.00.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Water Capital Recovery Fee (City of Pompano Beach) ($985.00) and Wastewater Capital Recovery Fee (City of Pompano Beach) ($545.00).

Neighborhood Park Impact Fee (City of Pompano Beach) and Community Park Impact Fee (City of Pompano Beach) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Pompano Beach Impact Fee Schedule
Water$985.00
  • Water Capital Recovery Fee (City of Pompano Beach)
    3/4in meter
    City of Pompano Beach Utilities
    City of Pompano Beach water capital recovery fee: $985 per equivalent residential customer unit (ERC); a 3/4-inch meter, the smallest size, is 1 ERC (Code Section 50.13). Paid before the building permit.
    $985.00
Sewer$545.00
  • Wastewater Capital Recovery Fee (City of Pompano Beach)
    3/4in meter
    City of Pompano Beach Utilities
    City of Pompano Beach wastewater capital recovery fee: $545 per equivalent residential customer unit (ERC); a 3/4-inch meter is 1 ERC (Code Section 51.11). Paid before the building permit.
    $545.00
City$2,347.00
  • Neighborhood Park Impact Fee (City of Pompano Beach)
    Sector 2, 3 BR
    City of Pompano Beach
    Pompano Beach neighborhood park impact fee for a 3-bedroom single-family home in park Sector 2: $1,336, effective February 1, 2024. Sector 2 is the highest of 3 rate districts; see the other sectors. A citywide community park fee is charged in addition.
    $1,336.00Requires confirmation
  • Community Park Impact Fee (City of Pompano Beach)
    3 BR
    City of Pompano Beach
    Pompano Beach citywide community park impact fee of $1,011 for a 3-bedroom single-family home, effective February 1, 2024, charged in addition to the neighborhood park fee for the unit's sector.
    $1,011.00Requires confirmation
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This is the single-family rate for 3 or fewer bedrooms, which covers the typical 3-bedroom house; homes with 4 or more bedrooms pay $11,070.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
Total (Pompano Beach): $12,686.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pompano Beach: Multifamily Impact Fees

A new multifamily unit in Pompano Beach pays at least $2,557.00 per unit in impact fees (rates sourced October 9, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $1,082.00.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00).

Neighborhood Park Impact Fee (City of Pompano Beach, MF) and Community Park Impact Fee (City of Pompano Beach, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Capacity Charge (City of Pompano Beach, MF) and Wastewater Capacity Charge (City of Pompano Beach, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Pompano Beach Impact Fee Schedule
Water$0.00
  • Water Capacity Charge (City of Pompano Beach, MF)
    City of Pompano Beach Utilities
    City of Pompano Beach water capital recovery fee is $985 per ERC, charged per water tap by meter size, not per dwelling unit, so the per-unit cost of a multifamily building depends on its meters.
    Requires confirmation
Sewer$0.00
  • Wastewater Capacity Charge (City of Pompano Beach, MF)
    City of Pompano Beach Utilities
    City of Pompano Beach wastewater capital recovery fee is $545 per ERC, charged by meter size or equivalent service requirement, not per dwelling unit, so the per-unit cost of a multifamily building depends on the project.
    Requires confirmation
City$1,082.00
  • Neighborhood Park Impact Fee (City of Pompano Beach, MF)
    Sector 2, High-rise
    City of Pompano Beach
    Pompano Beach neighborhood park impact fee for a high-rise apartment unit (4 floors or more) in park Sector 2: $617, effective February 1, 2024. Sector 2 is the highest of 3 rate districts; see the other sectors. A citywide community park fee is charged in addition.
    $617.00Requires confirmation
  • Community Park Impact Fee (City of Pompano Beach, MF)
    High-rise
    City of Pompano Beach
    Pompano Beach citywide community park impact fee of $465 for a high-rise apartment unit (4 floors or more), effective February 1, 2024, charged in addition to the neighborhood park fee for the unit's sector.
    $465.00Requires confirmation
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This tier (mid-rise, 2 or more bedrooms) covers the typical 2-bedroom unit in a 4-story building. Multifamily rates depend on building type and bedrooms: garden apartment (2 to 3 stories) 1 or fewer bedrooms $480, 2 bedrooms $4,918, 3 or more $5,901; mid-rise (4 to 8 stories) 1 or fewer bedrooms $375, 2 or more $1,475; high-rise (9 or more stories) $461 for all units.
    $1,475.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
Total (Pompano Beach): $2,557.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pompano Beach: Commercial Impact Fees

Commercial development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (rates sourced October 9, 2026).

For a 50,000 sq ft building, that comes to about $2,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Pompano Beach) — 1" meter ($1,675.00 one-time) and Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter ($928.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Pompano Beach Impact Fee Schedule
Water$1,675.00 one-time
  • Water Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    Pompano Beach's water capital recovery fee is $985 per ERC (Code §50.13); a 1-inch meter equals 1.7 ERC, for $1,675. The charge is meter-size based, applies to residential and nonresidential alike, and is due before building permit issuance.
    $1,675.00 one-time
Sewer$928.00 one-time
City$0.00
  • City Impact Fees (City of Pompano Beach, Commercial)
    City of Pompano Beach
    Pompano Beach's only impact fee is its Park Impact Fee, which applies to residential development only; there is no nonresidential city impact fee. Water and sewer capital recovery fees are separate.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Pompano Beach): $2,603.00 one-time (≈ $2,603.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Pompano Beach Utilities City of Pompano Beach Broward County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pompano Beach: Industrial Impact Fees

Industrial development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (rates sourced October 9, 2026).

For a 50,000 sq ft building, that comes to about $2,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Pompano Beach) — 1" meter ($1,675.00 one-time) and Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter ($928.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Pompano Beach Impact Fee Schedule
Water$1,675.00 one-time
  • Water Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    Pompano Beach's water capital recovery fee is $985 per ERC (Code §50.13); a 1-inch meter equals 1.7 ERC, for $1,675. The charge is meter-size based, applies to residential and nonresidential alike, and is due before building permit issuance.
    $1,675.00 one-time
Sewer$928.00 one-time
City$0.00
  • City Impact Fees (City of Pompano Beach, Industrial)
    City of Pompano Beach
    Pompano Beach's only impact fee is its Park Impact Fee, which applies to residential development only; there is no nonresidential city impact fee. Water and sewer capital recovery fees are separate.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Pompano Beach): $2,603.00 one-time (≈ $2,603.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Pompano Beach Utilities City of Pompano Beach Broward County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pompano Beach: Office Impact Fees

Office development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (rates sourced October 9, 2026).

For a 25,000 sq ft building, that comes to about $2,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Pompano Beach) — 1" meter ($1,675.00 one-time) and Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter ($928.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Pompano Beach Impact Fee Schedule
Water$1,675.00 one-time
  • Water Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    Pompano Beach's water capital recovery fee is $985 per ERC (Code §50.13); a 1-inch meter equals 1.7 ERC, for $1,675. The charge is meter-size based, applies to residential and nonresidential alike, and is due before building permit issuance.
    $1,675.00 one-time
Sewer$928.00 one-time
City$0.00
  • City Impact Fees (City of Pompano Beach, Office)
    City of Pompano Beach
    Pompano Beach's only impact fee is its Park Impact Fee, which applies to residential development only; there is no nonresidential city impact fee. Water and sewer capital recovery fees are separate.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Pompano Beach): $2,603.00 one-time (≈ $2,603.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Pompano Beach Utilities City of Pompano Beach Broward County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Pompano Beach Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Pompano Beach Impact Fee FAQs

What are the total impact fees for a single-family home in Pompano Beach, Florida?

A new single-family home in Pompano Beach pays $12,686.00 per unit in combined impact fees (rates sourced October 9, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Pompano Beach?

Commercial development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Pompano Beach charge its own impact fees?

Yes. Pompano Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Pompano Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.