Pompano Beach, Florida Impact Fees

Pompano Beach applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $8,809.00 per unit (rates sourced July 12, 2026). The full breakdown is below.

Pompano Beach impact fees by project type

Pompano Beach: Single-Family Impact Fees

A new single-family home in Pompano Beach pays $8,809.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (SFR, 3BR) ($8,809.00).

Road / Transportation Concurrency Fee (Broward County, SFR) and Water Capacity Charge (City of Pompano Beach) and Park/Recreational Impact Fee (Broward County, SFR) and City Impact Fee (City of Pompano Beach, SFR) and Wastewater Capacity Charge (City of Pompano Beach) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Charge (City of Pompano Beach)
    City of Pompano Beach Utilities
    Own utility, not Broward WWS (prior $1,590 copy-paste wrong). Capacity/connection fees (Code Ch.50) set by schedule; amount not published online. $0 placeholder. ⚠️ VERIFY Pompano Utilities 954-786-4637.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
  • Wastewater Capacity Charge (City of Pompano Beach)
    City of Pompano Beach Utilities
    Own utility, not Broward WWS (prior $2,010 copy-paste wrong). Sewer capacity fee not published online. $0 placeholder. ⚠️ VERIFY 954-786-4637.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fee (City of Pompano Beach, SFR)
    City may levy municipal impact fees (parks/police/fire); not confirmed against adopted schedule. $0 placeholder. ⚠️ VERIFY City of Pompano Beach 954-786-4600.
    Contact jurisdiction/utility to verifyRequires confirmation
County$8,809.00
  • $8,809.00
  • Road / Transportation Concurrency Fee (Broward County, SFR)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Park/Recreational Impact Fee (Broward County, SFR)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Pompano Beach): $8,809.00
Sources last checked July 12, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Pompano Beach: Multifamily Impact Fees

A new multifamily unit in Pompano Beach pays $1,475.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (MF, Mid-Rise, 2+ BR) ($1,475.00).

Water Capacity Charge (City of Pompano Beach, MF) and Road / Transportation Concurrency Fee (Broward County, MF) and City Impact Fee (City of Pompano Beach, MF) and Park/Recreational Impact Fee (Broward County, MF) and Wastewater Capacity Charge (City of Pompano Beach, MF) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water Capacity Charge (City of Pompano Beach, MF)
    Broward County
    Own utility, not Broward WWS (prior $1,124.13 wrong). Capacity/connection fees Code Ch.50; MF per-unit not published online. ⚠️ VERIFY Pompano Utilities 954-786-4637.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
City$0.00
  • City Impact Fee (City of Pompano Beach, MF)
    City may levy municipal impact fees (parks/police/fire); not confirmed. $0 placeholder. ⚠️ VERIFY 954-786-4600.
    Contact jurisdiction/utility to verifyRequires confirmation
County$1,475.00
  • $1,475.00
  • Road / Transportation Concurrency Fee (Broward County, MF)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Pompano Beach): $1,475.00
Sources last checked July 12, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Pompano Beach: Commercial Impact Fees

Commercial development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $2,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Pompano Beach) — 1" meter ($1,675.00 one-time) and Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter ($928.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Official fee schedule

View the full fee schedule
Water$1,675.00 one-time
  • Water Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §50.13 Water Capital Recovery Fee: base '$985 per Equivalent Residential Customer Unit (ERC) for each water tap purchased'; meter-size ERC ratios per AWWA M1. Charged PRIOR TO ISSUANCE OF A BUILDING PERMIT. Same schedule applies to residential and nonresidential (meter-size driven; no separate nonres table). Last amended Ord. 2022-45, passed 4-26-22. §50.03(D)(6): 'All rates, deposits, and charges specified in this chapter will be increased by 25% for water service outside of the incorporated limits.' Separate water TAPPING fee (§50.04(A), eff. 1-1-24: 3/4" $1,040; 1" $1,270; 1.5" $1,850; 2" $2,570; 3"+ at cost) is a physical-tap charge, not a capacity fee — not entered. Contact: Utilities 954-786-4637.
    $1,675.00 one-time
Sewer$928.00 one-time
  • Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §51.11 Wastewater Capital Recovery Fee: base '$545 per equivalent Residential Customer Unit (ERC) for each wastewater tap purchased'; same meter-size/ERC method as the water fee (AWWA M1 ratios). Most recent amendment Ord. 2009-12, passed 11-25-08. §51.03: sewer lateral construction/connection cost is borne by the developer at actual cost (no fixed fee) — not entered. Contact: Utilities 954-786-4637.
    $928.00 one-time
City$0.00
  • City Impact Fees (City of Pompano Beach, Commercial)
    City of Pompano Beach
    CONFIRMED $0 — Pompano Beach's only impact fee is the PARK IMPACT FEE, which is RESIDENTIAL-ONLY. Both adopted schedules (Park Impact Fees eff. 2-1-2021 and eff. 2-1-2024) are structured solely by Dwelling Type / Bedrooms / Fee per Unit (Single Family, Garden Apts, Town Houses, High Rise Apts, Duplex/Triplex/Fourplex, Mobile Homes) across Neighborhood Park Sectors 1-3 + citywide Community Parks — there is NO Commercial, Office, Industrial or any nonresidential row. No transportation/mobility fee and no other citywide impact fee exists. Also checked: Development Services Fee Schedule adopted 11-12-2024 (application/review fees only); Building Dept Fee Schedule (permit/plan review only); code chapter lists Title V (Ch. 50-54) and Title XV Land Usage (Ch. 150-160) — Ch. 154 has Concurrency §§154.70-.75 but no impact-fee article. Water/sewer capital recovery fees are separate (Code §§50.13, 51.11 — see W/S table). Contact: Planning & Zoning 954-786-4600.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Pompano Beach): $2,603.00 one-time (≈ $2,603.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Pompano Beach: Industrial Impact Fees

Industrial development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $2,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Pompano Beach) — 1" meter ($1,675.00 one-time) and Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter ($928.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Official fee schedule

View the full fee schedule
Water$1,675.00 one-time
  • Water Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §50.13 Water Capital Recovery Fee: base '$985 per Equivalent Residential Customer Unit (ERC) for each water tap purchased'; meter-size ERC ratios per AWWA M1. Charged PRIOR TO ISSUANCE OF A BUILDING PERMIT. Same schedule applies to residential and nonresidential (meter-size driven; no separate nonres table). Last amended Ord. 2022-45, passed 4-26-22. §50.03(D)(6): 'All rates, deposits, and charges specified in this chapter will be increased by 25% for water service outside of the incorporated limits.' Separate water TAPPING fee (§50.04(A), eff. 1-1-24: 3/4" $1,040; 1" $1,270; 1.5" $1,850; 2" $2,570; 3"+ at cost) is a physical-tap charge, not a capacity fee — not entered. Contact: Utilities 954-786-4637.
    $1,675.00 one-time
Sewer$928.00 one-time
  • Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §51.11 Wastewater Capital Recovery Fee: base '$545 per equivalent Residential Customer Unit (ERC) for each wastewater tap purchased'; same meter-size/ERC method as the water fee (AWWA M1 ratios). Most recent amendment Ord. 2009-12, passed 11-25-08. §51.03: sewer lateral construction/connection cost is borne by the developer at actual cost (no fixed fee) — not entered. Contact: Utilities 954-786-4637.
    $928.00 one-time
City$0.00
  • City Impact Fees (City of Pompano Beach, Industrial)
    City of Pompano Beach
    CONFIRMED $0 — the city's only impact fee (Park Impact Fee, schedules eff. 2-1-2021 and 2-1-2024) is RESIDENTIAL-ONLY: rows are dwelling type by bedroom count, no nonresidential row. No transportation/mobility or other citywide impact fee. Development Services Fee Schedule (11-12-2024) and Building Fee Schedule contain only application/review/permit fees. W/S capital recovery fees separate (§§50.13, 51.11 — see W/S table). Contact: Planning & Zoning 954-786-4600.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Pompano Beach): $2,603.00 one-time (≈ $2,603.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Pompano Beach: Office Impact Fees

Office development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $2,603.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Pompano Beach) — 1" meter ($1,675.00 one-time) and Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter ($928.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Official fee schedule

View the full fee schedule
Water$1,675.00 one-time
  • Water Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §50.13 Water Capital Recovery Fee: base '$985 per Equivalent Residential Customer Unit (ERC) for each water tap purchased'; meter-size ERC ratios per AWWA M1. Charged PRIOR TO ISSUANCE OF A BUILDING PERMIT. Same schedule applies to residential and nonresidential (meter-size driven; no separate nonres table). Last amended Ord. 2022-45, passed 4-26-22. §50.03(D)(6): 'All rates, deposits, and charges specified in this chapter will be increased by 25% for water service outside of the incorporated limits.' Separate water TAPPING fee (§50.04(A), eff. 1-1-24: 3/4" $1,040; 1" $1,270; 1.5" $1,850; 2" $2,570; 3"+ at cost) is a physical-tap charge, not a capacity fee — not entered. Contact: Utilities 954-786-4637.
    $1,675.00 one-time
Sewer$928.00 one-time
  • Wastewater Capital Recovery Fee (City of Pompano Beach) — 1" meter
    City of Pompano Beach Utilities
    CANONICAL DEFAULT (1" meter = 1.7 ERC). Code §51.11 Wastewater Capital Recovery Fee: base '$545 per equivalent Residential Customer Unit (ERC) for each wastewater tap purchased'; same meter-size/ERC method as the water fee (AWWA M1 ratios). Most recent amendment Ord. 2009-12, passed 11-25-08. §51.03: sewer lateral construction/connection cost is borne by the developer at actual cost (no fixed fee) — not entered. Contact: Utilities 954-786-4637.
    $928.00 one-time
City$0.00
  • City Impact Fees (City of Pompano Beach, Office)
    City of Pompano Beach
    CONFIRMED $0 — the city's only impact fee (Park Impact Fee, schedules eff. 2-1-2021 and 2-1-2024) is RESIDENTIAL-ONLY: rows are dwelling type by bedroom count, no nonresidential row. No transportation/mobility or other citywide impact fee. Development Services Fee Schedule (11-12-2024) and Building Fee Schedule contain only application/review/permit fees. W/S capital recovery fees separate (§§50.13, 51.11 — see W/S table). Contact: Planning & Zoning 954-786-4600.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Pompano Beach): $2,603.00 one-time (≈ $2,603.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Estimate your project in Pompano Beach

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Pompano Beach, Florida?

A new single-family home in Pompano Beach pays $8,809.00 per unit in combined impact fees (rates sourced July 12, 2026).

How much are commercial impact fees in Pompano Beach?

Commercial development in Pompano Beach pays no per-square-foot impact fees, but owes $2,603.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Pompano Beach charge its own impact fees?

Yes. Pompano Beach levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Pompano Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.