Plantation, Florida Impact Fees

Plantation applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $11,398.00 per unit (rates sourced July 14, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Plantation impact fees by project type

Plantation: Single-Family Impact Fees

A new single-family home in Plantation pays at least $11,398.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $2,589.00.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Parks Impact Fee (City of Plantation) ($706.00) and Fire Impact Fee (City of Plantation) ($686.00).

Wastewater Capacity Charge (City of Plantation) and Water Capacity Charge (City of Plantation) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Capacity Charge (City of Plantation)
    City of Plantation Utilities
    Amount NOT published - Code Ch. 26 Art. VI Secs. 26-157-26-163 set water & wastewater capacity charges by reference to the 'Utility Rate Index' (council resolution), which Municode's editor's note says is not codified and is available only at the city clerk's office; not on plantation.org. Sec. 26-157(3): the charge is SPLIT into separate water and wastewater components. Sec. 26-157(4)b: MF charged per residential unit at full ERU rate. Prior DB value ($5,650/ERC combined) had no primary source - removed. Plantation Utilities 954-797-2290 or City Clerk 954-797-2237.
    Requires confirmation
Sewer$0.00
  • Wastewater Capacity Charge (City of Plantation)
    City of Plantation Utilities
    Amount NOT published - Ch. 26 Art. VI Secs. 26-157-26-163; capacity charge set by 'Utility Rate Index' (council resolution), not codified, city clerk's office only. Sec. 26-157(3) confirms water/wastewater are separate components. Prior combined $5,650 (booked on Water) removed as unsourced. Plantation owns water plant + WWTP. Plantation Utilities 954-797-2290.
    Requires confirmation
City$2,589.00
  • Parks Impact Fee (City of Plantation)
    City of Plantation
    Plantation impact-fee program, Code Ch. 19 Art. IV Secs. 19-80-19-86, Ord. 2024-010 Sec. 1(Exh. A), adopted 8/21/2024. Parks $706 (SFR). Four more categories are separate City records: Library $78, Fire $686, Police $658, General Government $461 (SFR total $2,589). Sec. 19-86(b): inflation-adjusted annually by ENR CCI, determined each September, eff. following Nov 1 - an adjustment eff. 11/1/2025 may already supersede these; confirm. Plus an admin collection charge capped at actual cost.
    $706.00
  • Fire Impact Fee (City of Plantation)
    City of Plantation
    Plantation impact-fee program, Ord. 2024-010 (adopted 8/21/2024). Fire $686 (SFR). Parks $706 is the default. Annual ENR CCI adjustment eff. each Nov 1 - confirm 11/1/2025 figure.
    $686.00
  • Police Impact Fee (City of Plantation)
    City of Plantation
    Plantation impact-fee program, Ord. 2024-010 (adopted 8/21/2024). Police $658 (SFR). Parks $706 is the default. Annual ENR CCI adjustment eff. each Nov 1 - confirm 11/1/2025 figure.
    $658.00
  • General Government Impact Fee (City of Plantation)
    City of Plantation
    Plantation impact-fee program, Ord. 2024-010 (adopted 8/21/2024). General Government $461 (SFR). Parks $706 is the default. SFR 5-category total $2,589. Annual ENR CCI adjustment eff. each Nov 1 - confirm.
    $461.00
  • Library Impact Fee (City of Plantation)
    City of Plantation
    Plantation impact-fee program, Code Ch. 19 Art. IV, Ord. 2024-010 (adopted 8/21/2024). Library $78 (SFR). Parks $706 is the default City record. Sec. 19-86(b): annual ENR CCI adjustment eff. each Nov 1 - eff. 11/1/2025 may supersede; confirm.
    $78.00
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Plantation): $11,398.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Plantation: Multifamily Impact Fees

A new multifamily unit in Plantation pays at least $3,308.00 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $1,833.00.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00), Parks Impact Fee (City of Plantation, MF) ($501.00) and Fire Impact Fee (City of Plantation, MF) ($485.00).

Water Capacity Charge (City of Plantation, MF) and Wastewater Capacity Charge (City of Plantation, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Capacity Charge (City of Plantation, MF)
    City of Plantation Utilities
    Amount NOT published - Ch. 26 Art. VI Secs. 26-157-26-163; capacity charges set by 'Utility Rate Index' (council resolution), not codified, city clerk's office only. Sec. 26-157(4)b: MF charged per residential unit at full ERU rate. Sec. 26-157(3): water/wastewater are separate components. Prior $5,650 combined removed as unsourced. Plantation Utilities 954-797-2290 / City Clerk 954-797-2237.
    Requires confirmation
Sewer$0.00
  • Wastewater Capacity Charge (City of Plantation, MF)
    City of Plantation Utilities
    Amount NOT published - Ch. 26 Art. VI; capacity charge set by 'Utility Rate Index' (council resolution), city clerk only. Sec. 26-157(3): separate water/wastewater. MF per residential unit at full ERU rate. Prior combined $5,650 removed. Plantation Utilities 954-797-2290.
    Requires confirmation
City$1,833.00
  • Parks Impact Fee (City of Plantation, MF)
    City of Plantation
    Plantation impact-fee program, Code Ch. 19 Art. IV Secs. 19-80-19-86, Ord. 2024-010 (adopted 8/21/2024). Parks $501/DU. Four more MF categories are separate City records: Library $56, Fire $485, Police $465, General Government $326 (MF total $1,833). Sec. 19-86(b): annual ENR CCI adjustment eff. each Nov 1 - eff. 11/1/2025 may supersede; confirm. Plus admin collection charge.
    $501.00
  • Fire Impact Fee (City of Plantation, MF)
    City of Plantation
    Plantation impact-fee program, Ord. 2024-010 (adopted 8/21/2024). Fire $485/DU. Parks $501 is the default. Annual ENR CCI adjustment eff. each Nov 1 - confirm 11/1/2025 figure.
    $485.00
  • Police Impact Fee (City of Plantation, MF)
    City of Plantation
    Plantation impact-fee program, Ord. 2024-010 (adopted 8/21/2024). Police $465/DU. Parks $501 is the default. Annual ENR CCI adjustment eff. each Nov 1 - confirm 11/1/2025 figure.
    $465.00
  • General Government Impact Fee (City of Plantation, MF)
    City of Plantation
    Plantation impact-fee program, Ord. 2024-010 (adopted 8/21/2024). General Government $326/DU. Parks $501 is the default. MF 5-category total $1,833. Annual ENR CCI adjustment eff. each Nov 1 - confirm.
    $326.00
  • Library Impact Fee (City of Plantation, MF)
    City of Plantation
    Plantation impact-fee program, Ord. 2024-010 (adopted 8/21/2024). Library $56/DU. Parks $501 is the default MF City record. Sec. 19-86(b): annual ENR CCI adjustment eff. each Nov 1 - eff. 11/1/2025 may supersede; confirm.
    $56.00
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $1,475.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
Total (Plantation): $3,308.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Plantation: Commercial Impact Fees

Commercial development in Plantation pays $3.18 per square foot in impact fees, plus $5,650.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $164,750.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Charge (City of Plantation) ($2,895.00 one-time), Wastewater Capacity Charge (City of Plantation) ($2,755.00 one-time) and City Impact Fees (City of Plantation, Commercial) ($2.21/sq ft).

Transportation Impact Fee (City of Plantation, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$2,895.00 one-time
  • Water Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,895.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution at the 10-22-2025 meeting, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC (water $2,895 + sewer $2,755); prior rates were $2,349 water / $1,942 sewer. NO METER-SIZE TABLE — capacity charges are flat per ERC (meter-size tables in Plantation apply only to MONTHLY BASE RATES). Enabling code §26-157: capacity charges for 'all other users, including but not limited to commercial users, industrial, multiple-family residential users' are 'collected prior to the issuance of a building permit'; §26-157(4)(c): where the state or county health department attributes a higher water usage to a commercial account, that higher use is used to calculate the capacity charge. Applies to new construction, redevelopment, change of use, and interior buildout; change of use calculated case-by-case using the Broward County formula. Basis document: GovRates 'Water and Wastewater Capacity Charge Report 2025'. Code: https://library.municode.com/fl/plantation/codes/code_of_ordinances?nodeId=PTIICOOR_CH26UT_ARTVIUTSU . Contact: Utilities 954-797-2290.
    $2,895.00 one-time
Sewer$2,755.00 one-time
  • Wastewater Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,755.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution 10-22-2025, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC. Prior wastewater rate $1,942/ERC. NO METER-SIZE TABLE — flat per ERC. Enabling code §26-157 (Ord. No. 2624, §1, 9-14-2022 governs rate-setting by resolution): nonres capacity charges collected prior to issuance of a building permit; nonres ERCs derived from health-department / Broward County design-flow criteria. Applies to new construction, redevelopment, change of use, interior buildout. Basis: GovRates Capacity Charge Report 2025. Note: Plantation's resolution states that per F.S. §163.31801(12) the Florida Impact Fee Act does not apply to water and sewer capacity charges. Contact: Utilities 954-797-2290.
    $2,755.00 one-time
City$3.18/sq ft
  • City Impact Fees (City of Plantation, Commercial)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees). Rate = the CURRENT FEES column, in effect through 2026-09-21. Schedule row: Retail/Commercial, unit = 1,000 sq ft. Components: General Government $566 + Police $806 + Fire $841 = $2,213 per 1,000 sq ft. Parks and Library = $0 for nonresidential. Basis = GROSS FLOOR AREA (Code Sec. 19-85(a)). These are the ENR-CCI-adjusted amounts that Code Sec. 19-86(b) requires annually (effective each Nov 15); the City applies them administratively without recodifying, which is why Municode Sec. 19-85 still shows the 2013 Ord. 2485 base rates ($1,908/$894/$456). CORRECTED 2026-07-12 audit - this record previously held the stale 2013 base rate. NEXT STEP-UP 2026-09-22: Ord. No. 2026-005 (adopted 6-24-2026) repeals and replaces Ch. 19 Art. IV and adopts the DTA Public Finance Development Impact Fee Justification Study (6-12-2026), phased in over 4 years under Sec. 163.31801, F.S. Retail/Commercial: $2,439 eff. 9-22-2026 (GG $637 + Police $856 + Fire $946), then $2,665 (2027), $2,892 (2028), $3,118 (2029). RE-READ THE SCHEDULE AFTER 2026-09-22. A separate Transportation impact fee also appears in the Current Fees table - separate record. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org.
    $2.21/sq ft
  • Transportation Impact Fee (City of Plantation, Commercial)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees), CURRENT FEES column. Schedule row: Retail/Commercial, Transportation = $969 per 1,000 sq ft. Other rows: Office $404; Industrial $198; Warehouse $83; Public/Institutional $134. UNCONFIRMED: the Transportation impact fee appears in the City's published Current Fees table but is NOT among the categories in codified Code Sec. 19-85 (Parks, Library, Fire, Police, General Government only), and the Current Fees table shows no phase-in columns for it. CONFIRM (a) that Transportation is actually assessed on new nonresidential development today, and (b) whether Ord. No. 2026-005 (adopted 6-24-2026, eff. 9-22-2026, which repeals and replaces Ch. 19 Art. IV) carries it forward - Ord. 2026-005's category list does include Transportation. RE-READ AFTER 2026-09-22. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org. ENTERED 2026-07-12 audit.
    $0.97/sq ftRequires confirmation
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Plantation): $3.18/sq ft + $5,650.00 one-time (≈ $164,750.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Plantation Utilities Department City of Plantation Broward County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Plantation: Industrial Impact Fees

Industrial development in Plantation pays $0.73 per square foot in impact fees, plus $5,650.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $42,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Charge (City of Plantation) ($2,895.00 one-time), Wastewater Capacity Charge (City of Plantation) ($2,755.00 one-time) and City Impact Fees (City of Plantation, Industrial) ($0.53/sq ft).

Transportation Impact Fee (City of Plantation, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$2,895.00 one-time
  • Water Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,895.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution at the 10-22-2025 meeting, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC (water $2,895 + sewer $2,755); prior rates were $2,349 water / $1,942 sewer. NO METER-SIZE TABLE — capacity charges are flat per ERC (meter-size tables in Plantation apply only to MONTHLY BASE RATES). Enabling code §26-157: capacity charges for 'all other users, including but not limited to commercial users, industrial, multiple-family residential users' are 'collected prior to the issuance of a building permit'; §26-157(4)(c): where the state or county health department attributes a higher water usage to a commercial account, that higher use is used to calculate the capacity charge. Applies to new construction, redevelopment, change of use, and interior buildout; change of use calculated case-by-case using the Broward County formula. Basis document: GovRates 'Water and Wastewater Capacity Charge Report 2025'. Code: https://library.municode.com/fl/plantation/codes/code_of_ordinances?nodeId=PTIICOOR_CH26UT_ARTVIUTSU . Contact: Utilities 954-797-2290.
    $2,895.00 one-time
Sewer$2,755.00 one-time
  • Wastewater Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,755.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution 10-22-2025, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC. Prior wastewater rate $1,942/ERC. NO METER-SIZE TABLE — flat per ERC. Enabling code §26-157 (Ord. No. 2624, §1, 9-14-2022 governs rate-setting by resolution): nonres capacity charges collected prior to issuance of a building permit; nonres ERCs derived from health-department / Broward County design-flow criteria. Applies to new construction, redevelopment, change of use, interior buildout. Basis: GovRates Capacity Charge Report 2025. Note: Plantation's resolution states that per F.S. §163.31801(12) the Florida Impact Fee Act does not apply to water and sewer capacity charges. Contact: Utilities 954-797-2290.
    $2,755.00 one-time
City$0.73/sq ft
  • City Impact Fees (City of Plantation, Industrial)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees). Rate = the CURRENT FEES column, in effect through 2026-09-21. Schedule row: Industrial (general industrial row is the default per project rules), unit = 1,000 sq ft. Components: General Government $136 + Police $192 + Fire $201 = $529 per 1,000 sq ft. Parks and Library = $0 for nonresidential. Separate Warehouse row = $237 per 1,000 sq ft - not used. Basis = GROSS FLOOR AREA (Code Sec. 19-85(a)). ENR-CCI-adjusted per Code Sec. 19-86(b), applied administratively without recodifying - Municode Sec. 19-85 still shows the 2013 Ord. 2485 base ($456). CORRECTED 2026-07-12 audit - this record previously held the stale 2013 base rate. NEXT STEP-UP 2026-09-22: Ord. No. 2026-005 (adopted 6-24-2026) phases in a new schedule over 4 years; Industrial = $596 eff. 9-22-2026 (GG $153 + Police $217 + Fire $226), then $662 (2027), $728 (2028), $793 (2029). RE-READ AFTER 2026-09-22. Separate Transportation impact fee - separate record. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org.
    $0.53/sq ft
  • Transportation Impact Fee (City of Plantation, Industrial)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees), CURRENT FEES column. Schedule row: Industrial, Transportation = $198 per 1,000 sq ft (separate Warehouse row = $83 - not used; general industrial row is the default per project rules). UNCONFIRMED: the Transportation impact fee appears in the City's published Current Fees table but is NOT among the categories in codified Code Sec. 19-85, and the table shows no phase-in columns for it. CONFIRM that Transportation is assessed on new nonresidential development and whether Ord. No. 2026-005 (eff. 9-22-2026) carries it forward. RE-READ AFTER 2026-09-22. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org. ENTERED 2026-07-12 audit.
    $0.20/sq ftRequires confirmation
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Plantation): $0.73/sq ft + $5,650.00 one-time (≈ $42,000.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Plantation Utilities Department City of Plantation Broward County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Plantation: Office Impact Fees

Office development in Plantation pays $1.44 per square foot in impact fees, plus $5,650.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $41,675.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Charge (City of Plantation) ($2,895.00 one-time), Wastewater Capacity Charge (City of Plantation) ($2,755.00 one-time) and City Impact Fees (City of Plantation, Office) ($1.04/sq ft).

Transportation Impact Fee (City of Plantation, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the full fee schedule
Water$2,895.00 one-time
  • Water Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,895.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution at the 10-22-2025 meeting, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC (water $2,895 + sewer $2,755); prior rates were $2,349 water / $1,942 sewer. NO METER-SIZE TABLE — capacity charges are flat per ERC (meter-size tables in Plantation apply only to MONTHLY BASE RATES). Enabling code §26-157: capacity charges for 'all other users, including but not limited to commercial users, industrial, multiple-family residential users' are 'collected prior to the issuance of a building permit'; §26-157(4)(c): where the state or county health department attributes a higher water usage to a commercial account, that higher use is used to calculate the capacity charge. Applies to new construction, redevelopment, change of use, and interior buildout; change of use calculated case-by-case using the Broward County formula. Basis document: GovRates 'Water and Wastewater Capacity Charge Report 2025'. Code: https://library.municode.com/fl/plantation/codes/code_of_ordinances?nodeId=PTIICOOR_CH26UT_ARTVIUTSU . Contact: Utilities 954-797-2290.
    $2,895.00 one-time
Sewer$2,755.00 one-time
  • Wastewater Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,755.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution 10-22-2025, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC. Prior wastewater rate $1,942/ERC. NO METER-SIZE TABLE — flat per ERC. Enabling code §26-157 (Ord. No. 2624, §1, 9-14-2022 governs rate-setting by resolution): nonres capacity charges collected prior to issuance of a building permit; nonres ERCs derived from health-department / Broward County design-flow criteria. Applies to new construction, redevelopment, change of use, interior buildout. Basis: GovRates Capacity Charge Report 2025. Note: Plantation's resolution states that per F.S. §163.31801(12) the Florida Impact Fee Act does not apply to water and sewer capacity charges. Contact: Utilities 954-797-2290.
    $2,755.00 one-time
City$1.44/sq ft
  • City Impact Fees (City of Plantation, Office)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees). Rate = the CURRENT FEES column, in effect through 2026-09-21. Schedule row: Office, unit = 1,000 sq ft. Components: General Government $266 + Police $378 + Fire $393 = $1,037 per 1,000 sq ft. Parks and Library = $0 for nonresidential. Basis = GROSS FLOOR AREA (Code Sec. 19-85(a)). ENR-CCI-adjusted per Code Sec. 19-86(b) (effective each Nov 15), applied administratively without recodifying - Municode Sec. 19-85 still shows the 2013 Ord. 2485 base ($894). CORRECTED 2026-07-12 audit - this record previously held the stale 2013 base rate. NEXT STEP-UP 2026-09-22: Ord. No. 2026-005 (adopted 6-24-2026) phases in a new schedule over 4 years; Office = $1,166 eff. 9-22-2026 (GG $299 + Police $425 + Fire $442), then $1,295 (2027), $1,425 (2028), $1,555 (2029). RE-READ AFTER 2026-09-22. Separate Transportation impact fee - separate record. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org.
    $1.04/sq ft
  • Transportation Impact Fee (City of Plantation, Office)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees), CURRENT FEES column. Schedule row: Office, Transportation = $404 per 1,000 sq ft. UNCONFIRMED: the Transportation impact fee appears in the City's published Current Fees table but is NOT among the categories in codified Code Sec. 19-85, and the table shows no phase-in columns for it. CONFIRM that Transportation is assessed on new nonresidential development and whether Ord. No. 2026-005 (eff. 9-22-2026) carries it forward. RE-READ AFTER 2026-09-22. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org. ENTERED 2026-07-12 audit.
    $0.40/sq ftRequires confirmation
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Plantation): $1.44/sq ft + $5,650.00 one-time (≈ $41,675.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:City of Plantation Utilities Department City of Plantation Broward County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Plantation

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Plantation, Florida?

A new single-family home in Plantation pays at least $11,398.00 per unit in combined impact fees (rates sourced July 14, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Plantation?

Commercial development in Plantation pays $3.18 per square foot in impact fees, plus $5,650.00 in one-time water and sewer connection fees, about $164,750.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Plantation charge its own impact fees?

Yes. Plantation levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Plantation, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000