IMPACTFEES.ORG

Plantation, Florida Impact Fees

Plantation applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $14,459.00 per unit (rates sourced July 12, 2026). The full breakdown is below.

Plantation impact fees by project type

Plantation: Single-Family Impact Fees

A new single-family home in Plantation pays $14,459.00 per unit in impact fees (rates sourced July 12, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $5,650.00.

The largest line items are School Impact Fee (SFR, 3BR) ($8,809.00).

Water & Wastewater Capacity Charge (combined, City of Plantation, SFR) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Wastewater Capacity Charge (City of Plantation — incl. in combined) and City Impact Fee (City of Plantation, SFR) and Road / Transportation Concurrency Fee (Broward County, SFR) and Park/Recreational Impact Fee (Broward County, SFR) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Official fee schedule

View the full fee schedule
Water$5,650.00
  • Water & Wastewater Capacity Charge (combined, City of Plantation, SFR)
    City of Plantation Utilities
    Plantation charges a COMBINED water+wastewater capacity charge of $5,650 per ERC (1 ERC = SFR), adopted by City Council Oct 22 2025 (raised from $4,291); city calls it an impact fee. Water/sewer split not separately published — full combined amount recorded on this Water record; Sewer record set to $0 to avoid double-count. Source = council-meeting summary (lead). ⚠️ VERIFY split + adopted ordinance: Plantation Utilities.
    $5,650.00Requires confirmation
Sewer$0.00
  • Wastewater Capacity Charge (City of Plantation — incl. in combined)
    City of Plantation Utilities
    Plantation charges a COMBINED $5,650/ERC water+wastewater capacity charge (see Water record). Separate sewer amount not published. $0 here to avoid double-count. ⚠️ VERIFY split: Plantation Utilities.
    Contact jurisdiction/utility to verifyRequires confirmation
City$0.00
  • City Impact Fee (City of Plantation, SFR)
    City may levy municipal impact fees (parks/police/fire); not confirmed against adopted schedule. $0 placeholder. ⚠️ VERIFY City of Plantation 954-797-2227.
    Contact jurisdiction/utility to verifyRequires confirmation
County$8,809.00
  • $8,809.00
  • Road / Transportation Concurrency Fee (Broward County, SFR)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Park/Recreational Impact Fee (Broward County, SFR)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Plantation): $14,459.00
Sources last checked July 12, 2026Official fee schedule
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Plantation: Multifamily Impact Fees

A new multifamily unit in Plantation pays $1,475.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.

The largest line items are School Impact Fee (MF, Mid-Rise, 2+ BR) ($1,475.00).

Park/Recreational Impact Fee (Broward County, MF) and Road / Transportation Concurrency Fee (Broward County, MF) and City Impact Fee (City of Plantation, MF) and Water & Wastewater Capacity Charge (City of Plantation, MF) and Wastewater Capacity Charge (City of Plantation, MF — incl. in combined) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

Official fee schedule

View the full fee schedule
Water$0.00
  • Water & Wastewater Capacity Charge (City of Plantation, MF)
    Broward County
    Own utility, not Broward WWS (prior $1,124.13 wrong). SFR = COMBINED $5,650/ERC water+wastewater (City Council Oct 22 2025, raised from $4,291). MF per-unit ERC factor not published. ⚠️ VERIFY Plantation Utilities.
    Contact jurisdiction/utility to verifyRequires confirmation
Sewer$0.00
City$0.00
  • City Impact Fee (City of Plantation, MF)
    City may levy municipal impact fees (parks/police/fire); not confirmed. $0 placeholder. ⚠️ VERIFY 954-797-2227.
    Contact jurisdiction/utility to verifyRequires confirmation
County$1,475.00
  • $1,475.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County Park/Recreational Impact Fee applies only if platting required. $0 placeholder. ⚠️ VERIFY 954-357-6666.
    Contact jurisdiction/utility to verifyRequires confirmation
  • Road / Transportation Concurrency Fee (Broward County, MF)
    Broward County Road Impact OR Transportation Concurrency Fee, computed at plan review via TRIPS calculator — not a flat rate. $0 placeholder. ⚠️ VERIFY 954-357-6666 opt 2.
    Contact jurisdiction/utility to verifyRequires confirmation
Total (Plantation): $1,475.00
Sources last checked July 12, 2026Official fee schedule
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Plantation: Commercial Impact Fees

Commercial development in Plantation pays $3.18 per square foot in impact fees, plus $5,650.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $164,750.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Charge (City of Plantation) ($2,895.00 one-time), Wastewater Capacity Charge (City of Plantation) ($2,755.00 one-time) and City Impact Fees (City of Plantation, Commercial) ($2.21/sq ft).

Transportation Impact Fee (City of Plantation, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Official fee schedule

View the full fee schedule
Water$2,895.00 one-time
  • Water Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,895.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution at the 10-22-2025 meeting, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC (water $2,895 + sewer $2,755); prior rates were $2,349 water / $1,942 sewer. NO METER-SIZE TABLE — capacity charges are flat per ERC (meter-size tables in Plantation apply only to MONTHLY BASE RATES). Enabling code §26-157: capacity charges for 'all other users, including but not limited to commercial users, industrial, multiple-family residential users' are 'collected prior to the issuance of a building permit'; §26-157(4)(c): where the state or county health department attributes a higher water usage to a commercial account, that higher use is used to calculate the capacity charge. Applies to new construction, redevelopment, change of use, and interior buildout; change of use calculated case-by-case using the Broward County formula. Basis document: GovRates 'Water and Wastewater Capacity Charge Report 2025'. Code: https://library.municode.com/fl/plantation/codes/code_of_ordinances?nodeId=PTIICOOR_CH26UT_ARTVIUTSU . Contact: Utilities 954-797-2290.
    $2,895.00 one-time
Sewer$2,755.00 one-time
  • Wastewater Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,755.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution 10-22-2025, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC. Prior wastewater rate $1,942/ERC. NO METER-SIZE TABLE — flat per ERC. Enabling code §26-157 (Ord. No. 2624, §1, 9-14-2022 governs rate-setting by resolution): nonres capacity charges collected prior to issuance of a building permit; nonres ERCs derived from health-department / Broward County design-flow criteria. Applies to new construction, redevelopment, change of use, interior buildout. Basis: GovRates Capacity Charge Report 2025. Note: Plantation's resolution states that per F.S. §163.31801(12) the Florida Impact Fee Act does not apply to water and sewer capacity charges. Contact: Utilities 954-797-2290.
    $2,755.00 one-time
City$3.18/sq ft
  • City Impact Fees (City of Plantation, Commercial)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees). Rate = the CURRENT FEES column, in effect through 2026-09-21. Schedule row: Retail/Commercial, unit = 1,000 sq ft. Components: General Government $566 + Police $806 + Fire $841 = $2,213 per 1,000 sq ft. Parks and Library = $0 for nonresidential. Basis = GROSS FLOOR AREA (Code Sec. 19-85(a)). These are the ENR-CCI-adjusted amounts that Code Sec. 19-86(b) requires annually (effective each Nov 15); the City applies them administratively without recodifying, which is why Municode Sec. 19-85 still shows the 2013 Ord. 2485 base rates ($1,908/$894/$456). CORRECTED 2026-07-12 audit - this record previously held the stale 2013 base rate. NEXT STEP-UP 2026-09-22: Ord. No. 2026-005 (adopted 6-24-2026) repeals and replaces Ch. 19 Art. IV and adopts the DTA Public Finance Development Impact Fee Justification Study (6-12-2026), phased in over 4 years under Sec. 163.31801, F.S. Retail/Commercial: $2,439 eff. 9-22-2026 (GG $637 + Police $856 + Fire $946), then $2,665 (2027), $2,892 (2028), $3,118 (2029). RE-READ THE SCHEDULE AFTER 2026-09-22. A separate Transportation impact fee also appears in the Current Fees table - separate record. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org.
    $2.21/sq ft
  • Transportation Impact Fee (City of Plantation, Commercial)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees), CURRENT FEES column. Schedule row: Retail/Commercial, Transportation = $969 per 1,000 sq ft. Other rows: Office $404; Industrial $198; Warehouse $83; Public/Institutional $134. UNCONFIRMED: the Transportation impact fee appears in the City's published Current Fees table but is NOT among the categories in codified Code Sec. 19-85 (Parks, Library, Fire, Police, General Government only), and the Current Fees table shows no phase-in columns for it. CONFIRM (a) that Transportation is actually assessed on new nonresidential development today, and (b) whether Ord. No. 2026-005 (adopted 6-24-2026, eff. 9-22-2026, which repeals and replaces Ch. 19 Art. IV) carries it forward - Ord. 2026-005's category list does include Transportation. RE-READ AFTER 2026-09-22. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org. ENTERED 2026-07-12 audit.
    $0.97/sq ftRequires confirmation
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Plantation): $3.18/sq ft + $5,650.00 one-time (≈ $164,750.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Plantation: Industrial Impact Fees

Industrial development in Plantation pays $0.73 per square foot in impact fees, plus $5,650.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 50,000 sq ft building, that comes to about $42,000.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Charge (City of Plantation) ($2,895.00 one-time), Wastewater Capacity Charge (City of Plantation) ($2,755.00 one-time) and City Impact Fees (City of Plantation, Industrial) ($0.53/sq ft).

Transportation Impact Fee (City of Plantation, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Official fee schedule

View the full fee schedule
Water$2,895.00 one-time
  • Water Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,895.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution at the 10-22-2025 meeting, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC (water $2,895 + sewer $2,755); prior rates were $2,349 water / $1,942 sewer. NO METER-SIZE TABLE — capacity charges are flat per ERC (meter-size tables in Plantation apply only to MONTHLY BASE RATES). Enabling code §26-157: capacity charges for 'all other users, including but not limited to commercial users, industrial, multiple-family residential users' are 'collected prior to the issuance of a building permit'; §26-157(4)(c): where the state or county health department attributes a higher water usage to a commercial account, that higher use is used to calculate the capacity charge. Applies to new construction, redevelopment, change of use, and interior buildout; change of use calculated case-by-case using the Broward County formula. Basis document: GovRates 'Water and Wastewater Capacity Charge Report 2025'. Code: https://library.municode.com/fl/plantation/codes/code_of_ordinances?nodeId=PTIICOOR_CH26UT_ARTVIUTSU . Contact: Utilities 954-797-2290.
    $2,895.00 one-time
Sewer$2,755.00 one-time
  • Wastewater Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,755.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution 10-22-2025, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC. Prior wastewater rate $1,942/ERC. NO METER-SIZE TABLE — flat per ERC. Enabling code §26-157 (Ord. No. 2624, §1, 9-14-2022 governs rate-setting by resolution): nonres capacity charges collected prior to issuance of a building permit; nonres ERCs derived from health-department / Broward County design-flow criteria. Applies to new construction, redevelopment, change of use, interior buildout. Basis: GovRates Capacity Charge Report 2025. Note: Plantation's resolution states that per F.S. §163.31801(12) the Florida Impact Fee Act does not apply to water and sewer capacity charges. Contact: Utilities 954-797-2290.
    $2,755.00 one-time
City$0.73/sq ft
  • City Impact Fees (City of Plantation, Industrial)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees). Rate = the CURRENT FEES column, in effect through 2026-09-21. Schedule row: Industrial (general industrial row is the default per project rules), unit = 1,000 sq ft. Components: General Government $136 + Police $192 + Fire $201 = $529 per 1,000 sq ft. Parks and Library = $0 for nonresidential. Separate Warehouse row = $237 per 1,000 sq ft - not used. Basis = GROSS FLOOR AREA (Code Sec. 19-85(a)). ENR-CCI-adjusted per Code Sec. 19-86(b), applied administratively without recodifying - Municode Sec. 19-85 still shows the 2013 Ord. 2485 base ($456). CORRECTED 2026-07-12 audit - this record previously held the stale 2013 base rate. NEXT STEP-UP 2026-09-22: Ord. No. 2026-005 (adopted 6-24-2026) phases in a new schedule over 4 years; Industrial = $596 eff. 9-22-2026 (GG $153 + Police $217 + Fire $226), then $662 (2027), $728 (2028), $793 (2029). RE-READ AFTER 2026-09-22. Separate Transportation impact fee - separate record. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org.
    $0.53/sq ft
  • Transportation Impact Fee (City of Plantation, Industrial)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees), CURRENT FEES column. Schedule row: Industrial, Transportation = $198 per 1,000 sq ft (separate Warehouse row = $83 - not used; general industrial row is the default per project rules). UNCONFIRMED: the Transportation impact fee appears in the City's published Current Fees table but is NOT among the categories in codified Code Sec. 19-85, and the table shows no phase-in columns for it. CONFIRM that Transportation is assessed on new nonresidential development and whether Ord. No. 2026-005 (eff. 9-22-2026) carries it forward. RE-READ AFTER 2026-09-22. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org. ENTERED 2026-07-12 audit.
    $0.20/sq ftRequires confirmation
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Plantation): $0.73/sq ft + $5,650.00 one-time (≈ $42,000.00 at 50,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Plantation: Office Impact Fees

Office development in Plantation pays $1.44 per square foot in impact fees, plus $5,650.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).

For a 25,000 sq ft building, that comes to about $41,675.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Charge (City of Plantation) ($2,895.00 one-time), Wastewater Capacity Charge (City of Plantation) ($2,755.00 one-time) and City Impact Fees (City of Plantation, Office) ($1.04/sq ft).

Transportation Impact Fee (City of Plantation, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Official fee schedule

View the full fee schedule
Water$2,895.00 one-time
  • Water Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,895.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution at the 10-22-2025 meeting, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC (water $2,895 + sewer $2,755); prior rates were $2,349 water / $1,942 sewer. NO METER-SIZE TABLE — capacity charges are flat per ERC (meter-size tables in Plantation apply only to MONTHLY BASE RATES). Enabling code §26-157: capacity charges for 'all other users, including but not limited to commercial users, industrial, multiple-family residential users' are 'collected prior to the issuance of a building permit'; §26-157(4)(c): where the state or county health department attributes a higher water usage to a commercial account, that higher use is used to calculate the capacity charge. Applies to new construction, redevelopment, change of use, and interior buildout; change of use calculated case-by-case using the Broward County formula. Basis document: GovRates 'Water and Wastewater Capacity Charge Report 2025'. Code: https://library.municode.com/fl/plantation/codes/code_of_ordinances?nodeId=PTIICOOR_CH26UT_ARTVIUTSU . Contact: Utilities 954-797-2290.
    $2,895.00 one-time
Sewer$2,755.00 one-time
  • Wastewater Capacity Charge (City of Plantation)
    City of Plantation Utilities Department
    $2,755.00 PER ERC. Adopted in the Plantation Utility Rate Index (Composite Exhibit 1), amended by City Council resolution 10-22-2025, 'effective as of October 23, 2025.' Combined water + wastewater = $5,650.00 per ERC. Prior wastewater rate $1,942/ERC. NO METER-SIZE TABLE — flat per ERC. Enabling code §26-157 (Ord. No. 2624, §1, 9-14-2022 governs rate-setting by resolution): nonres capacity charges collected prior to issuance of a building permit; nonres ERCs derived from health-department / Broward County design-flow criteria. Applies to new construction, redevelopment, change of use, interior buildout. Basis: GovRates Capacity Charge Report 2025. Note: Plantation's resolution states that per F.S. §163.31801(12) the Florida Impact Fee Act does not apply to water and sewer capacity charges. Contact: Utilities 954-797-2290.
    $2,755.00 one-time
City$1.44/sq ft
  • City Impact Fees (City of Plantation, Office)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees). Rate = the CURRENT FEES column, in effect through 2026-09-21. Schedule row: Office, unit = 1,000 sq ft. Components: General Government $266 + Police $378 + Fire $393 = $1,037 per 1,000 sq ft. Parks and Library = $0 for nonresidential. Basis = GROSS FLOOR AREA (Code Sec. 19-85(a)). ENR-CCI-adjusted per Code Sec. 19-86(b) (effective each Nov 15), applied administratively without recodifying - Municode Sec. 19-85 still shows the 2013 Ord. 2485 base ($894). CORRECTED 2026-07-12 audit - this record previously held the stale 2013 base rate. NEXT STEP-UP 2026-09-22: Ord. No. 2026-005 (adopted 6-24-2026) phases in a new schedule over 4 years; Office = $1,166 eff. 9-22-2026 (GG $299 + Police $425 + Fire $442), then $1,295 (2027), $1,425 (2028), $1,555 (2029). RE-READ AFTER 2026-09-22. Separate Transportation impact fee - separate record. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org.
    $1.04/sq ft
  • Transportation Impact Fee (City of Plantation, Office)
    City of Plantation
    Source: City of Plantation adopted 'Impact Fee Schedule and Phase-In Schedule' (plantation.org > Planning & Zoning > Applications & Fees > Impact Fees), CURRENT FEES column. Schedule row: Office, Transportation = $404 per 1,000 sq ft. UNCONFIRMED: the Transportation impact fee appears in the City's published Current Fees table but is NOT among the categories in codified Code Sec. 19-85, and the table shows no phase-in columns for it. CONFIRM that Transportation is assessed on new nonresidential development and whether Ord. No. 2026-005 (eff. 9-22-2026) carries it forward. RE-READ AFTER 2026-09-22. Contact: Planning, Zoning & Economic Development, 954-797-2225, HelpMeZoning@plantation.org. ENTERED 2026-07-12 audit.
    $0.40/sq ftRequires confirmation
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted. Re-verified 2026-07-12: county Urban Planning fee page still lists all three as suspended; no study accepted. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Plantation): $1.44/sq ft + $5,650.00 one-time (≈ $41,675.00 at 25,000 sq ft)
Sources last checked July 12, 2026Official fee schedule
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).

Estimate your project in Plantation

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Plantation, Florida?

A new single-family home in Plantation pays $14,459.00 per unit in combined impact fees (rates sourced July 12, 2026).

How much are commercial impact fees in Plantation?

Commercial development in Plantation pays $3.18 per square foot in impact fees, plus $5,650.00 in one-time water and sewer connection fees, about $164,750.00 for a 50,000 sq ft building.

Does Plantation charge its own impact fees?

Yes. Plantation levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Plantation, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.