Hillsboro Beach impact fees by project type
Hillsboro Beach: Single-Family Impact Fees
A new single-family home in Hillsboro Beach pays at least $10,819.00 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Broward County.
The largest line items are School Impact Fee (Broward County) ($8,809.00) and Wastewater Capital Recovery Charge (Broward County WWS) ($2,010.00).
Water Connection / Capacity Charge (Town of Hillsboro Beach) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection / Capacity Charge (Town of Hillsboro Beach)Requires confirmationTown of Hillsboro Beach Water DepartmentUNCONFIRMED. Water provider = Town of Hillsboro Beach Water Department (own system). Municode Ch. 10 (Water) contains only consumption rates (Sec. 10-1, CPI-escalated). Sec. 10-5: 'Other miscellaneous charges shall be as established by resolution of the Town Commission' (Ord. 169, 5-4-1992) - no such resolution is posted. Checked: Municode Ch. 10 and the Town's posted water rates page. No figure imputed. Contact: Water Dept 954-941-8937 (utility billing 954-603-0030 ext. 40522).
- Wastewater Capital Recovery Charge (Broward County WWS)$2,010.00Broward County Water & Wastewater ServicesSewer provider = Broward County WWS. The Town's own Water Dept page links the 'Hillsboro Mile BCWWS Sewer Improvement Project'; Town code Ch. 7.5 (Sewers) is regulatory only - no rates, no connection charges. BCWWS Capital Recovery Charge at 1.000 ERU = $2,010. CONFIRMED.
- City Impact Fees (Town of Hillsboro Beach)$0.00Town of Hillsboro BeachCONFIRMED $0 - the Town levies NO impact fees. Checked the full Town Code chapter list (Chs. 1-12: no impact-fee chapter, no Appendix fee schedule), Ch. 12 Land Development Code (zero occurrences of 'impact'), Ch. 4 Buildings Sec. 4-67 permit fee schedule, and the Town's posted Building Fee Schedule PDF (https://www.townofhillsborobeach.com/DocumentCenter/View/4688/HB-FEE-SCHEDULE-2022) - zero 'impact'. Documented absence, not an unverified blank.
- School Impact Fee (Broward County)$8,809.00Single Family, 3 or fewer BRBroward County / School Board of Broward CountyBroward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
- Road Impact / Transportation Concurrency Fee (Broward County)$0.00Road / Transportation ConcurrencyBroward CountySUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
- Park/Recreational Impact Fee (Broward County)$0.00Broward CountySUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillsboro Beach: Multifamily Impact Fees
A new multifamily unit in Hillsboro Beach pays at least $2,896.07 per unit in impact fees (rates sourced July 14, 2026). All of it is levied by Broward County.
The largest line items are School Impact Fee (Broward County, MF) ($1,475.00) and Wastewater Capital Recovery Charge (Broward County WWS, MF) — 0.707 ERU × $2,010/ERU ($1,421.07).
Water Connection / Capacity Charge (Town of Hillsboro Beach, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection / Capacity Charge (Town of Hillsboro Beach, MF)Requires confirmationTown of Hillsboro Beach Water DepartmentUNCONFIRMED. Water provider = Town of Hillsboro Beach Water Department (own system). Municode Ch. 10 (Water) contains only consumption rates (Sec. 10-1, CPI-escalated). Sec. 10-5: 'Other miscellaneous charges shall be as established by resolution of the Town Commission' (Ord. 169, 5-4-1992) - no such resolution is posted. Checked Municode Ch. 10 and the Town's posted water rates page. No per-unit MF basis published; no figure imputed and SFR amount NOT copied. Contact: Water Dept 954-941-8937 (utility billing 954-603-0030 ext. 40522).
- Wastewater Capital Recovery Charge (Broward County WWS, MF) — 0.707 ERU × $2,010/ERU$1,421.07Condominium / Apartment / Duplex / Triplex (R03, 0.707 ERU)Broward County Water & Wastewater ServicesSewer provider = Broward County WWS (the Town's Water Dept page links the 'Hillsboro Mile BCWWS Sewer Improvement Project'; Town code Ch. 7.5 Sewers is regulatory only - no rates or connection charges). Basis: BCWWS 'Equivalent Residential Unit Factors' schedule (dated 4/4/2017), code R03 'Condominium/Apartment/Duplex/Triplex = 0.707 ERU each' - https://www.broward.org/WaterServices/Engineering/Documents/WWSEquivalentResidentialUnitFactors.pdf. The dollar product is DERIVED (posted ERU factor 0.707 x posted per-ERU charge $2,010); Broward publishes the factor and the rate but not the product. CONFIRMED.
- City Impact Fees (Town of Hillsboro Beach, MF)$0.00Town of Hillsboro BeachCONFIRMED $0 - the Town levies NO impact fees. Checked the full Town Code chapter list (Chs. 1-12: no impact-fee chapter, no Appendix fee schedule), Ch. 12 Land Development Code (zero occurrences of 'impact'), Ch. 4 Buildings Sec. 4-67 permit fee schedule, and the Town's posted Building Fee Schedule PDF (https://www.townofhillsborobeach.com/DocumentCenter/View/4688/HB-FEE-SCHEDULE-2022) - zero 'impact'. Documented absence, not an unverified blank.
- School Impact Fee (Broward County, MF)$1,475.00Mid-Rise, 2 or more BRBroward County / School Board of Broward CountyBroward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
- Park/Recreational Impact Fee (Broward County, MF)$0.00Broward CountySUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
- Road Impact / Transportation Concurrency Fee (Broward County, MF)$0.00Road / Transportation ConcurrencyBroward CountySUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillsboro Beach: Commercial Impact Fees
Commercial development in Hillsboro Beach pays no per-square-foot impact fees, but owes $2,010.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $2,010.00. The calculator below adjusts to your exact square footage.
Wastewater Capital Recovery Charge (Broward County WWS, serving Hillsboro Beach) — 1 ERU minimum is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection / Capacity Fee (Town of Hillsboro Beach) is set by the utility and not published online. City Impact Fees (Town of Hillsboro Beach, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection / Capacity Fee (Town of Hillsboro Beach)Requires confirmationTown of Hillsboro Beach Water Department$0 PLACEHOLDER — no published connection/capacity fee. PROVIDER CONFIRMED: the Town operates its OWN water plant (Water Department, plant at 925 Sample Rd, Pompano Beach) — not Broward County WWS. Code Ch. 10 publishes monthly consumption/billing rates only (domestic base $25.66 single / $16.04 multi; tiered usage rates; CPI-indexed since Oct 2025). §10-5: 'Other miscellaneous charges shall be as established by resolution of the Town Commission' (Ord. 169, 5-4-1992) — no resolution fee schedule is posted, and no meter-size capacity/impact fee table exists in the Code. Sources checked: Municode Ch. 10 in full + full chapter list; townofhillsborobeach.com Water Department pages; web search. VERIFY nonresidential water connection/capacity fee: Water Dept (954) 941-8937; Billing (954) 603-0030 ext. 40522; Town Hall (954) 427-4011.
- Wastewater Capital Recovery Charge (Broward County WWS, serving Hillsboro Beach) — 1 ERU minimum$2,010.00 one-timeRequires confirmationBroward County Water & Wastewater ServicesPROVIDER: sewer service is provided by Broward County Water & Wastewater Services (BCWWS) — confirmed by the Town's own 'Hillsboro Mile BCWWS Sewer Improvement Project' page. BCWWS Capital Recovery Charge, wastewater: $2,010 per ERU, expressly 'all classes, all meter sizes' — so nonresidential pays the same per-ERU charge as residential; there is no separate nonres meter table (this is the shared-ERU-table pattern, not residential-rate contamination). 1 wastewater ERU = 147 gpd average / 209 gpd plant capacity; nonres fee = (project gpd ÷ 147) × $2,010. Entered as the published 1.0-ERU minimum, Subtype blank. UNCONFIRMED: whether Hillsboro Beach is a BCWWS retail customer (charge applies directly) or a wholesale/large-user account where the Town levies its own connection charge instead. VERIFY: BCWWS (954) 831-3250; Town Hall (954) 427-4011.
- City Impact Fees (Town of Hillsboro Beach, Commercial)Requires confirmationTown of Hillsboro Beach$0 PLACEHOLDER — no municipal impact fee found. The Town's Code of Ordinances has NO impact fee chapter: full chapter list is 1 General Provisions, 2 Administration, 3 Animals, 4 Buildings, 5 Elections, 5½ Fire, 6 Garbage, 6½ Land Use and Development, 7 Offenses, 7½ Sewers, 9 Traffic, 10 Water, 11 Civil Citations, 12 Land Development Code. Ch. 10 (Water) sets consumption rates only; §10-5 says 'other miscellaneous charges shall be as established by resolution of the Town Commission' — no resolution schedule is posted. Tiny (~1,900 pop) barrier-island town, almost entirely residential/condo. Sources checked: Municode (chapter list + Ch. 10 in full); townofhillsborobeach.com (Water Dept pages); web search. VERIFY that no fee schedule resolution exists: Town Hall (954) 427-4011; Water Dept (954) 941-8937.
- County Impact / Transportation Concurrency Fees (Broward County, Commercial)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-11. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillsboro Beach: Industrial Impact Fees
Industrial development in Hillsboro Beach pays no per-square-foot impact fees, but owes $2,010.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $2,010.00. The calculator below adjusts to your exact square footage.
Wastewater Capital Recovery Charge (Broward County WWS, serving Hillsboro Beach) — 1 ERU minimum is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection / Capacity Fee (Town of Hillsboro Beach) is set by the utility and not published online. City Impact Fees (Town of Hillsboro Beach, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection / Capacity Fee (Town of Hillsboro Beach)Requires confirmationTown of Hillsboro Beach Water Department$0 PLACEHOLDER — no published connection/capacity fee. PROVIDER CONFIRMED: the Town operates its OWN water plant (Water Department, plant at 925 Sample Rd, Pompano Beach) — not Broward County WWS. Code Ch. 10 publishes monthly consumption/billing rates only (domestic base $25.66 single / $16.04 multi; tiered usage rates; CPI-indexed since Oct 2025). §10-5: 'Other miscellaneous charges shall be as established by resolution of the Town Commission' (Ord. 169, 5-4-1992) — no resolution fee schedule is posted, and no meter-size capacity/impact fee table exists in the Code. Sources checked: Municode Ch. 10 in full + full chapter list; townofhillsborobeach.com Water Department pages; web search. VERIFY nonresidential water connection/capacity fee: Water Dept (954) 941-8937; Billing (954) 603-0030 ext. 40522; Town Hall (954) 427-4011.
- Wastewater Capital Recovery Charge (Broward County WWS, serving Hillsboro Beach) — 1 ERU minimum$2,010.00 one-timeRequires confirmationBroward County Water & Wastewater ServicesPROVIDER: sewer service is provided by Broward County Water & Wastewater Services (BCWWS) — confirmed by the Town's own 'Hillsboro Mile BCWWS Sewer Improvement Project' page. BCWWS Capital Recovery Charge, wastewater: $2,010 per ERU, expressly 'all classes, all meter sizes' — so nonresidential pays the same per-ERU charge as residential; there is no separate nonres meter table (this is the shared-ERU-table pattern, not residential-rate contamination). 1 wastewater ERU = 147 gpd average / 209 gpd plant capacity; nonres fee = (project gpd ÷ 147) × $2,010. Entered as the published 1.0-ERU minimum, Subtype blank. UNCONFIRMED: whether Hillsboro Beach is a BCWWS retail customer (charge applies directly) or a wholesale/large-user account where the Town levies its own connection charge instead. VERIFY: BCWWS (954) 831-3250; Town Hall (954) 427-4011.
- City Impact Fees (Town of Hillsboro Beach, Industrial)Requires confirmationTown of Hillsboro Beach$0 PLACEHOLDER — no municipal impact fee found. Town Code has no impact fee chapter. Note: Hillsboro Beach has no industrial zoning districts (barrier-island residential town), so industrial development is not contemplated. Sources checked: Municode chapter list + Ch. 10; town website; web search. VERIFY: Town Hall (954) 427-4011.
- County Impact / Transportation Concurrency Fees (Broward County, Industrial)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-11. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hillsboro Beach: Office Impact Fees
Office development in Hillsboro Beach pays no per-square-foot impact fees, but owes $2,010.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $2,010.00. The calculator below adjusts to your exact square footage.
Wastewater Capital Recovery Charge (Broward County WWS, serving Hillsboro Beach) — 1 ERU minimum is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water Connection / Capacity Fee (Town of Hillsboro Beach) is set by the utility and not published online. City Impact Fees (Town of Hillsboro Beach, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection / Capacity Fee (Town of Hillsboro Beach)Requires confirmationTown of Hillsboro Beach Water Department$0 PLACEHOLDER — no published connection/capacity fee. PROVIDER CONFIRMED: the Town operates its OWN water plant (Water Department, plant at 925 Sample Rd, Pompano Beach) — not Broward County WWS. Code Ch. 10 publishes monthly consumption/billing rates only (domestic base $25.66 single / $16.04 multi; tiered usage rates; CPI-indexed since Oct 2025). §10-5: 'Other miscellaneous charges shall be as established by resolution of the Town Commission' (Ord. 169, 5-4-1992) — no resolution fee schedule is posted, and no meter-size capacity/impact fee table exists in the Code. Sources checked: Municode Ch. 10 in full + full chapter list; townofhillsborobeach.com Water Department pages; web search. VERIFY nonresidential water connection/capacity fee: Water Dept (954) 941-8937; Billing (954) 603-0030 ext. 40522; Town Hall (954) 427-4011.
- Wastewater Capital Recovery Charge (Broward County WWS, serving Hillsboro Beach) — 1 ERU minimum$2,010.00 one-timeRequires confirmationBroward County Water & Wastewater ServicesPROVIDER: sewer service is provided by Broward County Water & Wastewater Services (BCWWS) — confirmed by the Town's own 'Hillsboro Mile BCWWS Sewer Improvement Project' page. BCWWS Capital Recovery Charge, wastewater: $2,010 per ERU, expressly 'all classes, all meter sizes' — so nonresidential pays the same per-ERU charge as residential; there is no separate nonres meter table (this is the shared-ERU-table pattern, not residential-rate contamination). 1 wastewater ERU = 147 gpd average / 209 gpd plant capacity; nonres fee = (project gpd ÷ 147) × $2,010. Entered as the published 1.0-ERU minimum, Subtype blank. UNCONFIRMED: whether Hillsboro Beach is a BCWWS retail customer (charge applies directly) or a wholesale/large-user account where the Town levies its own connection charge instead. VERIFY: BCWWS (954) 831-3250; Town Hall (954) 427-4011.
- City Impact Fees (Town of Hillsboro Beach, Office)Requires confirmationTown of Hillsboro Beach$0 PLACEHOLDER — no municipal impact fee found. Town Code has no impact fee chapter (chapters 1–12; Ch. 10 Water sets consumption rates only, §10-5 defers misc charges to Commission resolution, none posted). Sources checked: Municode chapter list + Ch. 10; town website; web search. VERIFY: Town Hall (954) 427-4011.
- County Impact / Transportation Concurrency Fees (Broward County, Office)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-11. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Hillsboro Beach
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Hillsboro Beach, Florida?
A new single-family home in Hillsboro Beach pays at least $10,819.00 per unit in combined impact fees (rates sourced July 14, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Hillsboro Beach?
Commercial development in Hillsboro Beach pays no per-square-foot impact fees, but owes $2,010.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Hillsboro Beach charge its own impact fees?
Yes. Hillsboro Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Hillsboro Beach, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Broward County impact fees page.