Lauderhill, Florida Impact Fees

Lauderhill applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $13,023.23 per unit (rates sourced ). The full breakdown is below.

Lauderhill Impact Fees by Project Type

Lauderhill: Single-Family Impact Fees

A new single-family home in Lauderhill pays $13,023.23 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $4,214.23.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Water Connection Fee (City of Lauderhill) ($1,629.00) and Sewer Connection Fee (City of Lauderhill) ($1,190.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Lauderhill Impact Fee Schedule
Water$1,629.00
  • Water Connection Fee (City of Lauderhill)
    City of Lauderhill Utilities
    City of Lauderhill water connection fee: $1,629 for a single residence, paid before the water meter is installed (Code Section 21-47).
    $1,629.00
Sewer$1,190.00
  • Sewer Connection Fee (City of Lauderhill)
    City of Lauderhill Utilities
    City of Lauderhill sewer connection fee: $1,190 for a single residence, paid before the water meter is installed (Code Section 21-47).
    $1,190.00
City$1,395.23
  • Parks & Recreation Impact Fee (City of Lauderhill)
    City of Lauderhill
    City of Lauderhill parks and recreation impact fee: $804.56 per new dwelling unit, the same for single-family and multifamily and for every bedroom count. Set at 50% of the 2025 impact fee study (Ordinance 25O-04-111) and paid in full at building permit.
    $804.56
  • Fire Rescue Impact Fee (City of Lauderhill)
    City of Lauderhill
    City of Lauderhill fire rescue impact fee: $307.93 per new dwelling unit, the same for single-family and multifamily and for every bedroom count. Set at 50% of the 2025 impact fee study (Ordinance 25O-04-111) and paid in full at building permit.
    $307.93
  • Law Enforcement Impact Fee (City of Lauderhill)
    City of Lauderhill
    City of Lauderhill law enforcement impact fee: $282.74 per new dwelling unit, the same for single-family and multifamily and for every bedroom count. Set at 50% of the 2025 impact fee study (Ordinance 25O-04-111) and paid in full at building permit.
    $282.74
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This is the single-family rate for 3 or fewer bedrooms, which covers the typical 3-bedroom house; homes with 4 or more bedrooms pay $11,070.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
Total (Lauderhill): $13,023.23

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lauderhill: Multifamily Impact Fees

A new multifamily unit in Lauderhill pays $5,189.23 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $3,714.23.

The largest line items are School Impact Fee (Broward County, MF) ($1,475.00), Water Connection Fee (City of Lauderhill, MF) ($1,345.00) and Sewer Connection Fee (City of Lauderhill, MF) ($974.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Lauderhill Impact Fee Schedule
Water$1,345.00
  • Water Connection Fee (City of Lauderhill, MF)
    City of Lauderhill Utilities
    City of Lauderhill water connection fee: $1,345 per unit for buildings of 2 or more units, paid before meter installation (Code Section 21-47).
    $1,345.00
Sewer$974.00
City$1,395.23
  • Parks & Recreation Impact Fee (City of Lauderhill, MF)
    City of Lauderhill
    City of Lauderhill parks and recreation impact fee: $804.56 per new dwelling unit, the same for single-family and multifamily and for every bedroom count. Set at 50% of the 2025 impact fee study (Ordinance 25O-04-111) and paid in full at building permit.
    $804.56
  • Fire Rescue Impact Fee (City of Lauderhill, MF)
    City of Lauderhill
    City of Lauderhill fire rescue impact fee: $307.93 per new dwelling unit, the same for single-family and multifamily and for every bedroom count. Set at 50% of the 2025 impact fee study (Ordinance 25O-04-111) and paid in full at building permit.
    $307.93
  • Law Enforcement Impact Fee (City of Lauderhill, MF)
    City of Lauderhill
    City of Lauderhill law enforcement impact fee: $282.74 per new dwelling unit, the same for single-family and multifamily and for every bedroom count. Set at 50% of the 2025 impact fee study (Ordinance 25O-04-111) and paid in full at building permit.
    $282.74
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County school impact fee, charged on every new residential unit countywide, including inside cities. Rates effective January 1, 2022 (Ord. 2020-36) with no annual index. Since November 2025 it is paid directly to the School Board of Broward County, no later than building permit issuance. This tier (mid-rise, 2 or more bedrooms) covers the typical 2-bedroom unit in a 4-story building. Multifamily rates depend on building type and bedrooms: garden apartment (2 to 3 stories) 1 or fewer bedrooms $480, 2 bedrooms $4,918, 3 or more $5,901; mid-rise (4 to 8 stories) 1 or fewer bedrooms $375, 2 or more $1,475; high-rise (9 or more stories) $461 for all units.
    $1,475.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    Broward County regional park and local park impact fees are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    Broward County road impact fees and transportation concurrency assessments are suspended: none are collected on or after October 1, 2024 (Ord. 2024-34) unless the County Commission accepts a new impact fee study meeting state law. No study has been accepted as of the county code current through June 2026, so nothing is payable.
    $0.00
Total (Lauderhill): $5,189.23

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lauderhill: Commercial Impact Fees

Commercial development in Lauderhill pays $0.10 per square foot in impact fees, plus $2,819.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $7,589.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC ($1,629.00 one-time), Sewer Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC ($1,190.00 one-time) and Fire Rescue Impact Fee (City of Lauderhill, Commercial) ($0.05/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Lauderhill Impact Fee Schedule
Water$1,629.00 one-time
  • Water Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC
    City of Lauderhill service area
    City of Lauderhill (Dept. of Environmental & Engineering Services)
    Lauderhill's water connection (impact) fee for commercial development is $1,629 per ERC (Ord. 24O-09-146, effective October 1, 2024); the ERC count is set by the City Engineer during land development review. Industrial water connection fees are negotiated by contract rather than published.
    $1,629.00 one-time
Sewer$1,190.00 one-time
  • Sewer Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC
    City of Lauderhill service area
    City of Lauderhill (Dept. of Environmental & Engineering Services)
    Lauderhill's sewer connection (impact) fee for commercial development is $1,190 per ERC (Ord. 24O-09-146, effective October 1, 2024); the ERC count is set by the City Engineer during land development review. Industrial sewer connection fees are negotiated by contract rather than published.
    $1,190.00 one-time
City$0.10/sq ft
  • Fire Rescue Impact Fee (City of Lauderhill, Commercial)
    City of Lauderhill
    Lauderhill's fire rescue impact fee (Ord. 25O-04-111, adopted April 28, 2025) is $49.74 per 1,000 square feet for all nonresidential development, part of a $95.41 per 1,000 sq ft nonresidential impact fee total. Fees are set at 50% of the underlying technical analysis and collected at building permit issuance.
    $0.05/sq ft
  • Law Enforcement Impact Fee (City of Lauderhill, Commercial)
    City of Lauderhill
    Lauderhill's law enforcement impact fee (Ord. 25O-04-111, adopted April 28, 2025) is $45.67 per 1,000 square feet for all nonresidential development, part of a $95.41 per 1,000 sq ft nonresidential impact fee total. Fees are set at 50% of the underlying technical analysis and collected at building permit issuance.
    $0.05/sq ft
  • Parks and Recreation Impact Fee (City of Lauderhill, Commercial)
    City of Lauderhill
    Lauderhill's parks and recreation impact fee (Ord. 25O-04-111) applies to residential development only; the nonresidential rate is $0. Lauderhill's nonresidential impact fees are limited to fire rescue ($49.74) and law enforcement ($45.67), totaling $95.41 per 1,000 sq ft.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Lauderhill): $0.10/sq ft + $2,819.00 one-time (≈ $7,589.50 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lauderhill: Industrial Impact Fees

Industrial development in Lauderhill pays $0.10 per square foot in impact fees, plus $2,819.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $7,589.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC ($1,629.00 one-time), Sewer Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC ($1,190.00 one-time) and Fire Rescue Impact Fee (City of Lauderhill, Industrial) ($0.05/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Lauderhill Impact Fee Schedule
Water$1,629.00 one-time
  • Water Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC
    City of Lauderhill service area
    City of Lauderhill (Dept. of Environmental & Engineering Services)
    Lauderhill's water connection (impact) fee for commercial development is $1,629 per ERC (Ord. 24O-09-146, effective October 1, 2024); the ERC count is set by the City Engineer during land development review. Industrial water connection fees are negotiated by contract rather than published.
    $1,629.00 one-time
Sewer$1,190.00 one-time
  • Sewer Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC
    City of Lauderhill service area
    City of Lauderhill (Dept. of Environmental & Engineering Services)
    Lauderhill's sewer connection (impact) fee for commercial development is $1,190 per ERC (Ord. 24O-09-146, effective October 1, 2024); the ERC count is set by the City Engineer during land development review. Industrial sewer connection fees are negotiated by contract rather than published.
    $1,190.00 one-time
City$0.10/sq ft
  • Fire Rescue Impact Fee (City of Lauderhill, Industrial)
    City of Lauderhill
    Lauderhill's fire rescue impact fee (Ord. 25O-04-111, adopted April 28, 2025) is $49.74 per 1,000 square feet for all nonresidential development, part of a $95.41 per 1,000 sq ft nonresidential impact fee total. Fees are set at 50% of the underlying technical analysis and collected at building permit issuance.
    $0.05/sq ft
  • Law Enforcement Impact Fee (City of Lauderhill, Industrial)
    City of Lauderhill
    Lauderhill's law enforcement impact fee (Ord. 25O-04-111, adopted April 28, 2025) is $45.67 per 1,000 square feet for all nonresidential development, part of a $95.41 per 1,000 sq ft nonresidential impact fee total. Fees are set at 50% of the underlying technical analysis and collected at building permit issuance.
    $0.05/sq ft
  • Parks and Recreation Impact Fee (City of Lauderhill, Industrial)
    City of Lauderhill
    Lauderhill's parks and recreation impact fee (Ord. 25O-04-111) applies to residential development only; the nonresidential rate is $0. Lauderhill's nonresidential impact fees are limited to fire rescue ($49.74) and law enforcement ($45.67), totaling $95.41 per 1,000 sq ft.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Lauderhill): $0.10/sq ft + $2,819.00 one-time (≈ $7,589.50 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lauderhill: Office Impact Fees

Office development in Lauderhill pays $0.10 per square foot in impact fees, plus $2,819.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $5,204.25. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC ($1,629.00 one-time), Sewer Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC ($1,190.00 one-time) and Fire Rescue Impact Fee (City of Lauderhill, Office) ($0.05/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Lauderhill Impact Fee Schedule
Water$1,629.00 one-time
  • Water Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC
    City of Lauderhill service area
    City of Lauderhill (Dept. of Environmental & Engineering Services)
    Lauderhill's water connection (impact) fee for commercial development is $1,629 per ERC (Ord. 24O-09-146, effective October 1, 2024); the ERC count is set by the City Engineer during land development review. Industrial water connection fees are negotiated by contract rather than published.
    $1,629.00 one-time
Sewer$1,190.00 one-time
  • Sewer Connection / Impact Fee (City of Lauderhill) — Commercial, per ERC
    City of Lauderhill service area
    City of Lauderhill (Dept. of Environmental & Engineering Services)
    Lauderhill's sewer connection (impact) fee for commercial development is $1,190 per ERC (Ord. 24O-09-146, effective October 1, 2024); the ERC count is set by the City Engineer during land development review. Industrial sewer connection fees are negotiated by contract rather than published.
    $1,190.00 one-time
City$0.10/sq ft
  • Fire Rescue Impact Fee (City of Lauderhill, Office)
    City of Lauderhill
    Lauderhill's fire rescue impact fee (Ord. 25O-04-111, adopted April 28, 2025) is $49.74 per 1,000 square feet for all nonresidential development, part of a $95.41 per 1,000 sq ft nonresidential impact fee total. Fees are set at 50% of the underlying technical analysis and collected at building permit issuance.
    $0.05/sq ft
  • Law Enforcement Impact Fee (City of Lauderhill, Office)
    City of Lauderhill
    Lauderhill's law enforcement impact fee (Ord. 25O-04-111, adopted April 28, 2025) is $45.67 per 1,000 square feet for all nonresidential development, part of a $95.41 per 1,000 sq ft nonresidential impact fee total. Fees are set at 50% of the underlying technical analysis and collected at building permit issuance.
    $0.05/sq ft
  • Parks and Recreation Impact Fee (City of Lauderhill, Office)
    City of Lauderhill
    Lauderhill's parks and recreation impact fee (Ord. 25O-04-111) applies to residential development only; the nonresidential rate is $0. Lauderhill's nonresidential impact fees are limited to fire rescue ($49.74) and law enforcement ($45.67), totaling $95.41 per 1,000 sq ft.
    $0.00
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    Broward County collects no nonresidential impact fees. Ord. No. 2026-39 (enacted September 22, 2026) eliminated the county road impact fees and transportation concurrency assessments for development applications filed on or after September 25, 2026; collection had already been suspended since October 1, 2024 (Ord. No. 2024-34). The county park and school impact fees apply to dwelling units only.
    $0.00
Total (Lauderhill): $0.10/sq ft + $2,819.00 one-time (≈ $5,204.25 at 25,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Broward County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lauderhill Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Lauderhill Impact Fee FAQs

What are the total impact fees for a single-family home in Lauderhill, Florida?

A new single-family home in Lauderhill pays $13,023.23 per unit in combined impact fees (rates sourced July 14, 2026).

How much are commercial impact fees in Lauderhill?

Commercial development in Lauderhill pays $0.10 per square foot in impact fees, plus $2,819.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $7,589.50 for a 50,000 sq ft building.

Does Lauderhill charge its own impact fees?

Yes. Lauderhill levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lauderhill, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000