Margate impact fees by project type
Margate: Single-Family Impact Fees
A new single-family home in Margate pays $8,809.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.
The largest line items are School Impact Fee (SFR, 3 or fewer BR) ($8,809.00).
Road Impact / Transportation Concurrency Fee (Broward County) and Water Impact Fee (City of Margate) and City Impact Fees (City of Margate) and Sewer Impact Fee (City of Margate) and Park/Recreational Impact Fee (Broward County) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (City of Margate)Contact jurisdiction/utility to verifyRequires confirmationCity of MargateMargate operates own water/sewer. Water impact fee calculated by Engineering at permitting; not published as flat schedule. $0 placeholder. ⚠️ VERIFY: Margate Environmental & Engineering Services (954) 972-0828.
- Sewer Impact Fee (City of Margate)Contact jurisdiction/utility to verifyRequires confirmationCity of MargateSewer impact fee calculated by Engineering at permitting; not published as flat schedule. $0 placeholder. ⚠️ VERIFY: (954) 972-0828.
- City Impact Fees (City of Margate)Contact jurisdiction/utility to verifyRequires confirmationCity of MargateNo municipal (non-utility) development impact fee found; Development Services charges are application/processing fees. ⚠️ Confirm none: (954) 972-6454.
- School Impact Fee (SFR, 3 or fewer BR)$8,809.00School Board of Broward CountyBroward County School Impact Fee: SF 3-or-fewer BR = $8,809 (4+ BR = $11,070). Eff. Jan 1, 2022 per Ord. 2020-36. Countywide.
- Road Impact / Transportation Concurrency Fee (Broward County)Contact jurisdiction/utility to verifyRequires confirmationBroward CountyRoad impact or transportation concurrency fee, site-district dependent. $0 placeholder. ⚠️ VERIFY: 954-357-6666 opt 2.
- Park/Recreational Impact Fee (Broward County)Contact jurisdiction/utility to verifyRequires confirmationBroward CountyCounty park impact fee applies only if platting required. $0 placeholder. ⚠️ VERIFY: 954-357-6666.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Margate: Multifamily Impact Fees
A new multifamily unit in Margate pays $1,475.00 per unit in impact fees (rates sourced July 12, 2026). All of it is levied by Broward County.
The largest line items are School Impact Fee (MF, Mid-Rise, 2+ BR) ($1,475.00).
Road Impact / Transportation Concurrency Fee (Broward County, MF) and City Impact Fees (City of Margate, MF) and Water Impact Fee (City of Margate, MF) and Sewer Impact Fee (City of Margate, MF) and Park/Recreational Impact Fee (Broward County, MF) are set by the utility and not published online. Contact the utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (City of Margate, MF)Contact jurisdiction/utility to verifyRequires confirmationCity of MargateMargate own water; impact fee calculated by Engineering at permitting, not published. $0 placeholder. ⚠️ VERIFY: (954) 972-0828.
- Sewer Impact Fee (City of Margate, MF)Contact jurisdiction/utility to verifyRequires confirmationCity of MargateSewer impact fee calculated by Engineering at permitting, not published. $0 placeholder. ⚠️ VERIFY: (954) 972-0828.
- City Impact Fees (City of Margate, MF)Contact jurisdiction/utility to verifyRequires confirmationCity of MargateNo municipal (non-utility) impact fee found. ⚠️ Confirm none: (954) 972-6454.
- School Impact Fee (MF, Mid-Rise, 2+ BR)$1,475.00School Board of Broward CountyMid-Rise 2+BR = $1,475. Default MF tier.
- Road Impact / Transportation Concurrency Fee (Broward County, MF)Contact jurisdiction/utility to verifyRequires confirmationBroward CountySite-district dependent. $0 placeholder. ⚠️ VERIFY: 954-357-6666 opt 2.
- Park/Recreational Impact Fee (Broward County, MF)Contact jurisdiction/utility to verifyRequires confirmationBroward CountyApplies only if platting required. $0 placeholder. ⚠️ VERIFY: 954-357-6666.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Margate: Commercial Impact Fees
Commercial development in Margate pays $1.82 per square foot in impact fees, plus $5,345.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $96,159.50. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection Charge (City of Margate) — 1.0 ERC ($3,350.00 one-time), Water Connection Charge (City of Margate) — 1.0 ERC ($1,995.00 one-time) and Police Impact Fee (City of Margate, Commercial) ($0.99/sq ft).
View the full fee schedule
- Water Connection Charge (City of Margate) — 1.0 ERC$1,995.00 one-timeCity of Margate Dept. of Environmental & Engineering ServicesResolution 23-107, adopted 12/6/2023, 'Schedule of Fees and Charges for Water and Wastewater Services' — WATER CONNECTION CHARGE SCHEDULE (Table 1). No meter-size table for nonres: Table 1 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($1,995.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC, to nearest 0.01 ERC; flow from Table 3 'Commercial, Industrial and Public Facilities Flow Estimates' — e.g. General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Supermarkets/grocery 0.15 gpd/sq ft of total roof area; Warehouses without water closets 0.15 gpd/sq ft; Light industrial (no industrial wastes) 15 gpd/employee. Listed commercial uses carry a 1.0-ERC minimum. ERC redetermined post-occupancy from actual metered max monthly flow. Combined water+wastewater at 1.0 ERC = $5,345.00. Verified against Code Ch. 39, Art. VII (Municode, Supp. 34).
- Wastewater Connection Charge (City of Margate) — 1.0 ERC$3,350.00 one-timeCity of Margate Dept. of Environmental & Engineering ServicesResolution 23-107, adopted 12/6/2023 — WASTEWATER CONNECTION CHARGE SCHEDULE (Table 2). Table 2 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($3,350.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC; flow from Table 3 (General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Warehouses w/o water closets 0.15 gpd/sq ft; Light industrial 15 gpd/employee). 1.0-ERC minimum for listed commercial uses. Combined water+wastewater at 1.0 ERC = $5,345.00.
- Police Impact Fee (City of Margate, Commercial)$0.99/sq ftCity of MargateCode Ch. 9 (Buildings), Art. III - Fees, Sec. 9-25 (Police impact fee), subsec. (f)(1). Schedule row: 'Nonresidential, per 1,000 feet or any fraction thereof' = $993.53. SINGLE NONRES RATE - no category split in the schedule (Commercial = Office = Industrial). Adopted Ord. No. 2010-13, Sec. 1, 10-20-2010. Municode codified through Ord. No. 2025-3 (5-21-2025); no amendment to Sec. 9-25 since 2010. No CPI/ENR escalator - Sec. 9-25(f)(3)-(4) lets the city manager adjust only on clear, competent, specific evidence. 3% administrative retainage; payable to the Building Dept before building permit issuance; refunds at Sec. 9-25(j). Residential comparison: $372.38 each. Margate also levies a Fire and EMS impact fee (Sec. 9-26) - separate record; combined nonres total = $1,816.29 per 1,000 sq ft. Water/sewer (Res. 23-107) and stormwater are separate and additive. CORRECTED 2026-07-12 audit: the prior $0 placeholder was wrong - the fees sit in Code Ch. 9 Art. III, not Ch. 39/40 (LDC), which is why the research pass missed them. Contact: Engineering Division, 954-972-6454.
- Fire and EMS Impact Fee (City of Margate, Commercial)$0.82/sq ftCity of MargateCode Ch. 9 (Buildings), Art. III - Fees, Sec. 9-26 (Fire and EMS impact fee), subsec. (f)(1). Schedule row: 'Nonresidential per 1,000 feet, or any fraction thereof' = $822.76. SINGLE NONRES RATE - no category split in the schedule (Commercial = Office = Industrial). Adopted Ord. No. 2010-14, Sec. 1, 10-20-2010; no amendment since (Municode codified through Ord. No. 2025-3, 5-21-2025). No CPI/ENR escalator. 3% administrative retainage; payable to the Building Dept before building permit issuance; refunds at Sec. 9-26(j). Residential comparison: $415.44 each. Combined Margate nonres city impact fees = $993.53 (Police, Sec. 9-25) + $822.76 (Fire and EMS, Sec. 9-26) = $1,816.29 per 1,000 sq ft. Water/sewer (Res. 23-107) and stormwater are separate and additive. ENTERED 2026-07-12 audit - the research pass had left a $0 placeholder because it searched Ch. 39/40 (LDC) rather than Code Ch. 9 Art. III. Contact: Engineering Division, 954-972-6454.
- County Impact / Transportation Concurrency Fees (Broward County, Commercial)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).
Margate: Industrial Impact Fees
Industrial development in Margate pays $1.82 per square foot in impact fees, plus $5,345.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 50,000 sq ft building, that comes to about $96,159.50. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection Charge (City of Margate) — 1.0 ERC ($3,350.00 one-time), Water Connection Charge (City of Margate) — 1.0 ERC ($1,995.00 one-time) and Police Impact Fee (City of Margate, Industrial) ($0.99/sq ft).
View the full fee schedule
- Water Connection Charge (City of Margate) — 1.0 ERC$1,995.00 one-timeCity of Margate Dept. of Environmental & Engineering ServicesResolution 23-107, adopted 12/6/2023, 'Schedule of Fees and Charges for Water and Wastewater Services' — WATER CONNECTION CHARGE SCHEDULE (Table 1). No meter-size table for nonres: Table 1 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($1,995.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC, to nearest 0.01 ERC; flow from Table 3 'Commercial, Industrial and Public Facilities Flow Estimates' — e.g. General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Supermarkets/grocery 0.15 gpd/sq ft of total roof area; Warehouses without water closets 0.15 gpd/sq ft; Light industrial (no industrial wastes) 15 gpd/employee. Listed commercial uses carry a 1.0-ERC minimum. ERC redetermined post-occupancy from actual metered max monthly flow. Combined water+wastewater at 1.0 ERC = $5,345.00. Verified against Code Ch. 39, Art. VII (Municode, Supp. 34).
- Wastewater Connection Charge (City of Margate) — 1.0 ERC$3,350.00 one-timeCity of Margate Dept. of Environmental & Engineering ServicesResolution 23-107, adopted 12/6/2023 — WASTEWATER CONNECTION CHARGE SCHEDULE (Table 2). Table 2 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($3,350.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC; flow from Table 3 (General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Warehouses w/o water closets 0.15 gpd/sq ft; Light industrial 15 gpd/employee). 1.0-ERC minimum for listed commercial uses. Combined water+wastewater at 1.0 ERC = $5,345.00.
- Police Impact Fee (City of Margate, Industrial)$0.99/sq ftCity of MargateCode Ch. 9 (Buildings), Art. III - Fees, Sec. 9-25 (Police impact fee), subsec. (f)(1). Schedule row: 'Nonresidential, per 1,000 feet or any fraction thereof' = $993.53. SINGLE NONRES RATE - no category split in the schedule; industrial pays the same nonresidential rate. Adopted Ord. No. 2010-13, Sec. 1, 10-20-2010; no amendment since (codified through Ord. No. 2025-3, 5-21-2025). No CPI/ENR escalator. 3% administrative retainage; payable before building permit issuance. Residential comparison: $372.38 each. Fire and EMS impact fee (Sec. 9-26) is a separate record; combined nonres total = $1,816.29 per 1,000 sq ft. CORRECTED 2026-07-12 audit: prior $0 placeholder was wrong - fees are in Code Ch. 9 Art. III, not the LDC. Contact: Engineering Division, 954-972-6454.
- Fire and EMS Impact Fee (City of Margate, Industrial)$0.82/sq ftCity of MargateCode Ch. 9 (Buildings), Art. III - Fees, Sec. 9-26 (Fire and EMS impact fee), subsec. (f)(1). Schedule row: 'Nonresidential per 1,000 feet, or any fraction thereof' = $822.76. SINGLE NONRES RATE - no category split; industrial pays the same nonresidential rate. Adopted Ord. No. 2010-14, Sec. 1, 10-20-2010; no amendment since. No CPI/ENR escalator. 3% administrative retainage; payable before building permit issuance. Residential comparison: $415.44 each. Combined Margate nonres city impact fees = $993.53 (Police) + $822.76 (Fire and EMS) = $1,816.29 per 1,000 sq ft. ENTERED 2026-07-12 audit - the research pass had left a $0 placeholder because it searched Ch. 39/40 (LDC) rather than Code Ch. 9 Art. III. Contact: Engineering Division, 954-972-6454.
- County Impact / Transportation Concurrency Fees (Broward County, Industrial)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).
Margate: Office Impact Fees
Office development in Margate pays $1.82 per square foot in impact fees, plus $5,345.00 in one-time water and sewer connection fees (rates sourced July 12, 2026).
For a 25,000 sq ft building, that comes to about $50,752.25. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection Charge (City of Margate) — 1.0 ERC ($3,350.00 one-time), Water Connection Charge (City of Margate) — 1.0 ERC ($1,995.00 one-time) and Police Impact Fee (City of Margate, Office) ($0.99/sq ft).
View the full fee schedule
- Water Connection Charge (City of Margate) — 1.0 ERC$1,995.00 one-timeCity of Margate Dept. of Environmental & Engineering ServicesResolution 23-107, adopted 12/6/2023, 'Schedule of Fees and Charges for Water and Wastewater Services' — WATER CONNECTION CHARGE SCHEDULE (Table 1). No meter-size table for nonres: Table 1 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($1,995.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC, to nearest 0.01 ERC; flow from Table 3 'Commercial, Industrial and Public Facilities Flow Estimates' — e.g. General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Supermarkets/grocery 0.15 gpd/sq ft of total roof area; Warehouses without water closets 0.15 gpd/sq ft; Light industrial (no industrial wastes) 15 gpd/employee. Listed commercial uses carry a 1.0-ERC minimum. ERC redetermined post-occupancy from actual metered max monthly flow. Combined water+wastewater at 1.0 ERC = $5,345.00. Verified against Code Ch. 39, Art. VII (Municode, Supp. 34).
- Wastewater Connection Charge (City of Margate) — 1.0 ERC$3,350.00 one-timeCity of Margate Dept. of Environmental & Engineering ServicesResolution 23-107, adopted 12/6/2023 — WASTEWATER CONNECTION CHARGE SCHEDULE (Table 2). Table 2 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($3,350.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC; flow from Table 3 (General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Warehouses w/o water closets 0.15 gpd/sq ft; Light industrial 15 gpd/employee). 1.0-ERC minimum for listed commercial uses. Combined water+wastewater at 1.0 ERC = $5,345.00.
- Police Impact Fee (City of Margate, Office)$0.99/sq ftCity of MargateCode Ch. 9 (Buildings), Art. III - Fees, Sec. 9-25 (Police impact fee), subsec. (f)(1). Schedule row: 'Nonresidential, per 1,000 feet or any fraction thereof' = $993.53. SINGLE NONRES RATE - no category split in the schedule; office pays the same nonresidential rate. Adopted Ord. No. 2010-13, Sec. 1, 10-20-2010; no amendment since (codified through Ord. No. 2025-3, 5-21-2025). No CPI/ENR escalator. 3% administrative retainage; payable before building permit issuance. Residential comparison: $372.38 each. Fire and EMS impact fee (Sec. 9-26) is a separate record; combined nonres total = $1,816.29 per 1,000 sq ft. CORRECTED 2026-07-12 audit: prior $0 placeholder was wrong - fees are in Code Ch. 9 Art. III, not the LDC. Contact: Engineering Division, 954-972-6454.
- Fire and EMS Impact Fee (City of Margate, Office)$0.82/sq ftCity of MargateCode Ch. 9 (Buildings), Art. III - Fees, Sec. 9-26 (Fire and EMS impact fee), subsec. (f)(1). Schedule row: 'Nonresidential per 1,000 feet, or any fraction thereof' = $822.76. SINGLE NONRES RATE - no category split; office pays the same nonresidential rate. Adopted Ord. No. 2010-14, Sec. 1, 10-20-2010; no amendment since. No CPI/ENR escalator. 3% administrative retainage; payable before building permit issuance. Residential comparison: $415.44 each. Combined Margate nonres city impact fees = $993.53 (Police) + $822.76 (Fire and EMS) = $1,816.29 per 1,000 sq ft. ENTERED 2026-07-12 audit - the research pass had left a $0 placeholder because it searched Ch. 39/40 (LDC) rather than Code Ch. 9 Art. III. Contact: Engineering Division, 954-972-6454.
- County Impact / Transportation Concurrency Fees (Broward County, Office)$0.00Broward CountyCONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
Where in Broward County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter).
Estimate your project in Margate
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Margate, Florida?
A new single-family home in Margate pays $8,809.00 per unit in combined impact fees (rates sourced July 12, 2026).
How much are commercial impact fees in Margate?
Commercial development in Margate pays $1.82 per square foot in impact fees, plus $5,345.00 in one-time water and sewer connection fees, about $96,159.50 for a 50,000 sq ft building.
Does Margate charge its own impact fees?
Yes. Margate levies its own municipal impact fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Margate, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Broward County impact fees page.