IMPACTFEES.ORG

Margate, Florida Impact Fees

Margate applies its own fee schedule: municipal fees plus the Broward County-levied fees that apply inside city limits. Combined, a new single-family home pays $14,941.82 per unit (rates sourced July 14, 2026). The full breakdown is below.

Margate impact fees by project type

Margate: Single-Family Impact Fees

A new single-family home in Margate pays $14,941.82 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $8,809.00 and municipal or utility fees for $6,132.82.

The largest line items are School Impact Fee (Broward County) ($8,809.00), Sewer Impact Fee (City of Margate) ($3,350.00) and Water Impact Fee (City of Margate) ($1,995.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,995.00
  • Water Impact Fee (City of Margate)
    City of Margate
    City of Margate owns water treatment. Water impact fee $1,995.00 per ERC (5/8"x3/4" meter, 1.0 ERC). Res. 23-107, adopted/eff. 12/6/2023. Separate water/sewer (not combined). Res. 23-107 has an escalator table (+9% 10/1/24, +9% 10/1/25, +4% 10/1/26, +4% 10/1/27, CPI after) but it is captioned as applying to MONTHLY service/consumption charges only; connection tables carry a single un-escalated column. Confirm connection charges remain unindexed: Environmental & Engineering Services 954-972-0828.
    $1,995.00
Sewer$3,350.00
  • Sewer Impact Fee (City of Margate)
    City of Margate
    City of Margate wastewater. Sewer impact fee $3,350.00 (1.0 ERC). Res. 23-107, adopted/eff. 12/6/2023. Separate water/sewer. Escalator table in Res. 23-107 is captioned for MONTHLY service charges only; connection tables un-escalated. Confirm: 954-972-0828.
    $3,350.00
City$787.82
  • Fire & EMS Impact Fee (City of Margate)
    City of Margate
    Fire & EMS impact fee $415.44 per residential unit, Sec. 9-26(f), Ord. 2010-13. Flat per DU. Police ($372.38, Sec. 9-25) is the default City record.
    $415.44
  • Police Impact Fee (City of Margate)
    City of Margate
    Police impact fee $372.38 per residential unit, Sec. 9-25(f), Ord. 2010-13. Flat per dwelling unit. Fire & EMS impact fee ($415.44, Sec. 9-26) is a separate City record. No parks, transportation, or general-capital fee; checked full Municode chapter list, 'impact fee' search, permit fee schedule (eff. 7/1/2026), and the city Permitting page which enumerates exactly 'water, sewer, stormwater, police, and fire impact fees.'
    $372.38
County$8,809.00
  • School Impact Fee (Broward County)
    Single Family, 3 or fewer BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Single Family 3-or-fewer BR = $8,809 (this record, the default/most common); 4-or-more BR = $11,070 (separate tier record). Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $8,809.00
  • Road Impact / Transportation Concurrency Fee (Broward County)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Margate): $14,941.82
Sources last checked July 14, 2026Official fee schedules:City of Margate Broward County / School Board of Broward County Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Margate: Multifamily Impact Fees

A new multifamily unit in Margate pays $5,545.14 per unit in impact fees (rates sourced July 14, 2026). Of that, Broward County-levied fees account for $1,475.00 and municipal or utility fees for $4,070.14.

The largest line items are Sewer Impact Fee (City of Margate, MF) - 0.66 ERC x $3,350/ERC ($2,211.00), School Impact Fee (Broward County, MF) ($1,475.00) and Water Impact Fee (City of Margate, MF) - 0.537 ERC x $1,995/ERC ($1,071.32).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,071.32
  • Water Impact Fee (City of Margate, MF) - 0.537 ERC x $1,995/ERC
    City of Margate
    MF water impact fee $1,071.32/unit = 0.537 ERC x $1,995/ERC. Explicit 'Multifamily residence - one meter serving more than one unit (apartments and condominiums)' line, Res. 23-107 (adopted/eff. 12/6/2023). Separate water/sewer. Connection tables un-escalated (escalator captioned for monthly charges). 954-972-0828.
    $1,071.32
Sewer$2,211.00
City$787.82
  • Fire & EMS Impact Fee (City of Margate, MF)
    City of Margate
    Fire & EMS impact fee $415.44 per residential unit (each MF unit), Sec. 9-26(f), Ord. 2010-13. Flat per DU. Police ($372.38, Sec. 9-25) is the default City record.
    $415.44
  • Police Impact Fee (City of Margate, MF)
    City of Margate
    Police impact fee $372.38 per residential unit (each MF unit), Sec. 9-25(f), Ord. 2010-13. Fire & EMS ($415.44, Sec. 9-26) is a separate City record. No parks/transportation/general-capital fee (see SFR note).
    $372.38
County$1,475.00
  • School Impact Fee (Broward County, MF)
    Mid-Rise, 2 or more BR
    Broward County / School Board of Broward County
    Broward County School Impact Fee, Code Sec. 5-182.9(b)(2)c), Ord. 2020-36 (enacted 10/20/2020); schedule effective 1/1/2022 and UNCHANGED since — no CPI/annual index clause. Countywide: assessed on all residential development in Broward County (all 31 municipalities + unincorporated) unless waived/exempted. Adopted MF tiers: Garden Apartment (low-rise, 1–3 stories) 1-or-fewer BR $480 / 2 BR $4,918 / 3-or-more BR $5,901; Mid-Rise (4+ stories) 1-or-fewer BR $375 / 2-or-more BR $1,475; High-Rise all BR $461. The canonical MF unit (2BR/2BA, 1,000 sq ft, 4-story building) falls in Broward's Mid-Rise class, so Mid-Rise 2-or-more BR $1,475 is the DEFAULT record. Verified against the adopted schedule 7/14/2026. NOTE: this is the ONLY Broward county impact fee still being collected — Road, Transportation Concurrency and Park fees were all suspended by Ord. 2024-34 eff. 10/1/2024.
    $1,475.00
  • Road Impact / Transportation Concurrency Fee (Broward County, MF)
    Road / Transportation Concurrency
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Road Impact Fees and Transportation Concurrency Assessments effective 10/1/2024 (done to comply with State law); see Broward County LDC Sec. 5-184(b)(2). Confirmed $0 currently payable. Prior regime (Road Fee Schedule eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/RoadFees.pdf) was a cost-PER-TRIP table across 46 zones (residential $41.67/trip Zone 14 to $1,679.88/trip Zone 1) x ITE trip generation — it was never a flat per-unit rate. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf (Urban Planning Division, 10/1/2024). WATCH: suspension could lapse/be repealed — recheck each cycle. Staff: 954-357-6666 opt. 2.
    $0.00
  • Park/Recreational Impact Fee (Broward County, MF)
    Broward County
    SUSPENDED. Broward County Ord. 2024-34 suspended collection of Regional Park Impact Fees and BMSD Local Park Impact Fees effective 10/1/2024. Confirmed $0 currently payable. CORRECTION to the prior note in this record: a flat published per-unit schedule DID exist under Ord. 92-1 (eff. 10/1/2020, https://www.broward.org/Planning/FormsPublications/Documents/ParkFees.pdf) — e.g. SFR 3BR $514.12 + 1% admin = $519.31; Garden/Mid-/High-Rise apt 2+BR $367.23 + 1% = $370.94 — assessed on plats, plat amendments and BMSD site plans/permits. Source: https://www.broward.org/Planning/FormsPublications/Documents/FAQS-for-Customers.pdf. WATCH: suspension could lapse — recheck each cycle.
    $0.00
Total (Margate): $5,545.14
Sources last checked July 14, 2026Official fee schedules:City of Margate Broward County / School Board of Broward County Broward County

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Margate: Commercial Impact Fees

Commercial development in Margate pays $1.82 per square foot in impact fees, plus $5,345.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $96,159.50. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection Charge (City of Margate) — 1.0 ERC ($3,350.00 one-time), Water Connection Charge (City of Margate) — 1.0 ERC ($1,995.00 one-time) and Police Impact Fee (City of Margate, Commercial) ($0.99/sq ft).

View the full fee schedule
Water$1,995.00 one-time
  • Water Connection Charge (City of Margate) — 1.0 ERC
    City of Margate Dept. of Environmental & Engineering Services
    Resolution 23-107, adopted 12/6/2023, 'Schedule of Fees and Charges for Water and Wastewater Services' — WATER CONNECTION CHARGE SCHEDULE (Table 1). No meter-size table for nonres: Table 1 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($1,995.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC, to nearest 0.01 ERC; flow from Table 3 'Commercial, Industrial and Public Facilities Flow Estimates' — e.g. General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Supermarkets/grocery 0.15 gpd/sq ft of total roof area; Warehouses without water closets 0.15 gpd/sq ft; Light industrial (no industrial wastes) 15 gpd/employee. Listed commercial uses carry a 1.0-ERC minimum. ERC redetermined post-occupancy from actual metered max monthly flow. Combined water+wastewater at 1.0 ERC = $5,345.00. Verified against Code Ch. 39, Art. VII (Municode, Supp. 34).
    $1,995.00 one-time
Sewer$3,350.00 one-time
  • Wastewater Connection Charge (City of Margate) — 1.0 ERC
    City of Margate Dept. of Environmental & Engineering Services
    Resolution 23-107, adopted 12/6/2023 — WASTEWATER CONNECTION CHARGE SCHEDULE (Table 2). Table 2 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($3,350.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC; flow from Table 3 (General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Warehouses w/o water closets 0.15 gpd/sq ft; Light industrial 15 gpd/employee). 1.0-ERC minimum for listed commercial uses. Combined water+wastewater at 1.0 ERC = $5,345.00.
    $3,350.00 one-time
City$1.82/sq ft
  • Police Impact Fee (City of Margate, Commercial)
    City of Margate
    Code Ch. 9 (Buildings), Art. III - Fees, Sec. 9-25 (Police impact fee), subsec. (f)(1). Schedule row: 'Nonresidential, per 1,000 feet or any fraction thereof' = $993.53. SINGLE NONRES RATE - no category split in the schedule (Commercial = Office = Industrial). Adopted Ord. No. 2010-13, Sec. 1, 10-20-2010. Municode codified through Ord. No. 2025-3 (5-21-2025); no amendment to Sec. 9-25 since 2010. No CPI/ENR escalator - Sec. 9-25(f)(3)-(4) lets the city manager adjust only on clear, competent, specific evidence. 3% administrative retainage; payable to the Building Dept before building permit issuance; refunds at Sec. 9-25(j). Residential comparison: $372.38 each. Margate also levies a Fire and EMS impact fee (Sec. 9-26) - separate record; combined nonres total = $1,816.29 per 1,000 sq ft. Water/sewer (Res. 23-107) and stormwater are separate and additive. CORRECTED 2026-07-12 audit: the prior $0 placeholder was wrong - the fees sit in Code Ch. 9 Art. III, not Ch. 39/40 (LDC), which is why the research pass missed them. Contact: Engineering Division, 954-972-6454.
    $0.99/sq ft
  • Fire and EMS Impact Fee (City of Margate, Commercial)
    City of Margate
    Code Ch. 9 (Buildings), Art. III - Fees, Sec. 9-26 (Fire and EMS impact fee), subsec. (f)(1). Schedule row: 'Nonresidential per 1,000 feet, or any fraction thereof' = $822.76. SINGLE NONRES RATE - no category split in the schedule (Commercial = Office = Industrial). Adopted Ord. No. 2010-14, Sec. 1, 10-20-2010; no amendment since (Municode codified through Ord. No. 2025-3, 5-21-2025). No CPI/ENR escalator. 3% administrative retainage; payable to the Building Dept before building permit issuance; refunds at Sec. 9-26(j). Residential comparison: $415.44 each. Combined Margate nonres city impact fees = $993.53 (Police, Sec. 9-25) + $822.76 (Fire and EMS, Sec. 9-26) = $1,816.29 per 1,000 sq ft. Water/sewer (Res. 23-107) and stormwater are separate and additive. ENTERED 2026-07-12 audit - the research pass had left a $0 placeholder because it searched Ch. 39/40 (LDC) rather than Code Ch. 9 Art. III. Contact: Engineering Division, 954-972-6454.
    $0.82/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Commercial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Margate): $1.82/sq ft + $5,345.00 one-time (≈ $96,159.50 at 50,000 sq ft)

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Margate: Industrial Impact Fees

Industrial development in Margate pays $1.82 per square foot in impact fees, plus $5,345.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to about $96,159.50. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection Charge (City of Margate) — 1.0 ERC ($3,350.00 one-time), Water Connection Charge (City of Margate) — 1.0 ERC ($1,995.00 one-time) and Police Impact Fee (City of Margate, Industrial) ($0.99/sq ft).

View the full fee schedule
Water$1,995.00 one-time
  • Water Connection Charge (City of Margate) — 1.0 ERC
    City of Margate Dept. of Environmental & Engineering Services
    Resolution 23-107, adopted 12/6/2023, 'Schedule of Fees and Charges for Water and Wastewater Services' — WATER CONNECTION CHARGE SCHEDULE (Table 1). No meter-size table for nonres: Table 1 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($1,995.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC, to nearest 0.01 ERC; flow from Table 3 'Commercial, Industrial and Public Facilities Flow Estimates' — e.g. General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Supermarkets/grocery 0.15 gpd/sq ft of total roof area; Warehouses without water closets 0.15 gpd/sq ft; Light industrial (no industrial wastes) 15 gpd/employee. Listed commercial uses carry a 1.0-ERC minimum. ERC redetermined post-occupancy from actual metered max monthly flow. Combined water+wastewater at 1.0 ERC = $5,345.00. Verified against Code Ch. 39, Art. VII (Municode, Supp. 34).
    $1,995.00 one-time
Sewer$3,350.00 one-time
  • Wastewater Connection Charge (City of Margate) — 1.0 ERC
    City of Margate Dept. of Environmental & Engineering Services
    Resolution 23-107, adopted 12/6/2023 — WASTEWATER CONNECTION CHARGE SCHEDULE (Table 2). Table 2 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($3,350.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC; flow from Table 3 (General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Warehouses w/o water closets 0.15 gpd/sq ft; Light industrial 15 gpd/employee). 1.0-ERC minimum for listed commercial uses. Combined water+wastewater at 1.0 ERC = $5,345.00.
    $3,350.00 one-time
City$1.82/sq ft
  • Police Impact Fee (City of Margate, Industrial)
    City of Margate
    Code Ch. 9 (Buildings), Art. III - Fees, Sec. 9-25 (Police impact fee), subsec. (f)(1). Schedule row: 'Nonresidential, per 1,000 feet or any fraction thereof' = $993.53. SINGLE NONRES RATE - no category split in the schedule; industrial pays the same nonresidential rate. Adopted Ord. No. 2010-13, Sec. 1, 10-20-2010; no amendment since (codified through Ord. No. 2025-3, 5-21-2025). No CPI/ENR escalator. 3% administrative retainage; payable before building permit issuance. Residential comparison: $372.38 each. Fire and EMS impact fee (Sec. 9-26) is a separate record; combined nonres total = $1,816.29 per 1,000 sq ft. CORRECTED 2026-07-12 audit: prior $0 placeholder was wrong - fees are in Code Ch. 9 Art. III, not the LDC. Contact: Engineering Division, 954-972-6454.
    $0.99/sq ft
  • Fire and EMS Impact Fee (City of Margate, Industrial)
    City of Margate
    Code Ch. 9 (Buildings), Art. III - Fees, Sec. 9-26 (Fire and EMS impact fee), subsec. (f)(1). Schedule row: 'Nonresidential per 1,000 feet, or any fraction thereof' = $822.76. SINGLE NONRES RATE - no category split; industrial pays the same nonresidential rate. Adopted Ord. No. 2010-14, Sec. 1, 10-20-2010; no amendment since. No CPI/ENR escalator. 3% administrative retainage; payable before building permit issuance. Residential comparison: $415.44 each. Combined Margate nonres city impact fees = $993.53 (Police) + $822.76 (Fire and EMS) = $1,816.29 per 1,000 sq ft. ENTERED 2026-07-12 audit - the research pass had left a $0 placeholder because it searched Ch. 39/40 (LDC) rather than Code Ch. 9 Art. III. Contact: Engineering Division, 954-972-6454.
    $0.82/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Industrial)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Margate): $1.82/sq ft + $5,345.00 one-time (≈ $96,159.50 at 50,000 sq ft)

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Margate: Office Impact Fees

Office development in Margate pays $1.82 per square foot in impact fees, plus $5,345.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to about $50,752.25. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection Charge (City of Margate) — 1.0 ERC ($3,350.00 one-time), Water Connection Charge (City of Margate) — 1.0 ERC ($1,995.00 one-time) and Police Impact Fee (City of Margate, Office) ($0.99/sq ft).

View the full fee schedule
Water$1,995.00 one-time
  • Water Connection Charge (City of Margate) — 1.0 ERC
    City of Margate Dept. of Environmental & Engineering Services
    Resolution 23-107, adopted 12/6/2023, 'Schedule of Fees and Charges for Water and Wastewater Services' — WATER CONNECTION CHARGE SCHEDULE (Table 1). No meter-size table for nonres: Table 1 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($1,995.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC, to nearest 0.01 ERC; flow from Table 3 'Commercial, Industrial and Public Facilities Flow Estimates' — e.g. General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Supermarkets/grocery 0.15 gpd/sq ft of total roof area; Warehouses without water closets 0.15 gpd/sq ft; Light industrial (no industrial wastes) 15 gpd/employee. Listed commercial uses carry a 1.0-ERC minimum. ERC redetermined post-occupancy from actual metered max monthly flow. Combined water+wastewater at 1.0 ERC = $5,345.00. Verified against Code Ch. 39, Art. VII (Municode, Supp. 34).
    $1,995.00 one-time
Sewer$3,350.00 one-time
  • Wastewater Connection Charge (City of Margate) — 1.0 ERC
    City of Margate Dept. of Environmental & Engineering Services
    Resolution 23-107, adopted 12/6/2023 — WASTEWATER CONNECTION CHARGE SCHEDULE (Table 2). Table 2 routes 'Commercial/industrial/public facilities' to Table 3. Amount stored = the published 1.0-ERC charge ($3,350.00 = SFR 5/8"x3/4" meter, ERC value 1.0). NONRES ERC FORMULA (Code Sec. 39-73(b)-(c)): ERC = estimated flow (gpd) ÷ 335 gpd/ERC; flow from Table 3 (General offices 0.24 gpd/sq ft; Department stores 0.22 gpd/sq ft; Warehouses w/o water closets 0.15 gpd/sq ft; Light industrial 15 gpd/employee). 1.0-ERC minimum for listed commercial uses. Combined water+wastewater at 1.0 ERC = $5,345.00.
    $3,350.00 one-time
City$1.82/sq ft
  • Police Impact Fee (City of Margate, Office)
    City of Margate
    Code Ch. 9 (Buildings), Art. III - Fees, Sec. 9-25 (Police impact fee), subsec. (f)(1). Schedule row: 'Nonresidential, per 1,000 feet or any fraction thereof' = $993.53. SINGLE NONRES RATE - no category split in the schedule; office pays the same nonresidential rate. Adopted Ord. No. 2010-13, Sec. 1, 10-20-2010; no amendment since (codified through Ord. No. 2025-3, 5-21-2025). No CPI/ENR escalator. 3% administrative retainage; payable before building permit issuance. Residential comparison: $372.38 each. Fire and EMS impact fee (Sec. 9-26) is a separate record; combined nonres total = $1,816.29 per 1,000 sq ft. CORRECTED 2026-07-12 audit: prior $0 placeholder was wrong - fees are in Code Ch. 9 Art. III, not the LDC. Contact: Engineering Division, 954-972-6454.
    $0.99/sq ft
  • Fire and EMS Impact Fee (City of Margate, Office)
    City of Margate
    Code Ch. 9 (Buildings), Art. III - Fees, Sec. 9-26 (Fire and EMS impact fee), subsec. (f)(1). Schedule row: 'Nonresidential per 1,000 feet, or any fraction thereof' = $822.76. SINGLE NONRES RATE - no category split; office pays the same nonresidential rate. Adopted Ord. No. 2010-14, Sec. 1, 10-20-2010; no amendment since. No CPI/ENR escalator. 3% administrative retainage; payable before building permit issuance. Residential comparison: $415.44 each. Combined Margate nonres city impact fees = $993.53 (Police) + $822.76 (Fire and EMS) = $1,816.29 per 1,000 sq ft. ENTERED 2026-07-12 audit - the research pass had left a $0 placeholder because it searched Ch. 39/40 (LDC) rather than Code Ch. 9 Art. III. Contact: Engineering Division, 954-972-6454.
    $0.82/sq ft
County$0.00
  • County Impact / Transportation Concurrency Fees (Broward County, Office)
    Broward County
    CONFIRMED $0. Broward County Road, Transportation Concurrency, and Recreational impact fees all suspended as of 10/01/2024 per County Code Sec. 5-182 (Ord. No. 2024-34, 9-17-24) until a §163.31801 F.S. impact fee study is accepted; none accepted as of 2026-07-12. School impact fees residential-only. RECHECK EACH CYCLE. Contact: Urban Planning Division, 954-357-6666 ext. 2, PDMDinfo@broward.org.
    $0.00
Total (Margate): $1.82/sq ft + $5,345.00 one-time (≈ $50,752.25 at 25,000 sq ft)

Where in Broward County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in Margate

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Margate, Florida?

A new single-family home in Margate pays $14,941.82 per unit in combined impact fees (rates sourced July 14, 2026).

How much are commercial impact fees in Margate?

Commercial development in Margate pays $1.82 per square foot in impact fees, plus $5,345.00 in one-time water and sewer connection fees, about $96,159.50 for a 50,000 sq ft building.

Does Margate charge its own impact fees?

Yes. Margate levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Margate, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Broward County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000