Impact fees in Miami-Dade County depend on where you build. This page details the rates for unincorporated Miami-Dade County: $20,659.76 per single-family unit as of . Unincorporated communities such as Kendall, Westchester and Fontainebleau pay these county rates rather than a city schedule. Inside city limits, each city applies its own schedule and fees may be completely different. Pick your city below.

Miami-Dade County Impact Fees by Project Type

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County: Single-Family Impact Fees

A new single-family home in unincorporated Miami-Dade County pays $20,659.76 per unit in impact fees (rates sourced October 21, 2026). Of that, Miami-Dade County-levied fees account for $18,664.31 and municipal or utility fees for $1,995.45.

The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($10,625.00), Parks & Recreation Impact Fee (Miami-Dade County) ($4,902.89) and Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Miami-Dade County Impact Fee Schedule
Water$291.90
  • Water Connection Charge (Miami-Dade WASD)
    Under 3,001 sq ft (210 gpd)
    Miami-Dade Water & Sewer Dept
    Water service here is provided by the Miami-Dade Water and Sewer Department (WASD). Its connection charge is $1.39 per average daily gallon (unchanged in the schedule effective October 1, 2026), applied to the County Code flow table for the home's total floor area including garage and covered patios: 210 gallons per day under 3,001 sq ft (shown), 310 for 3,001 to 5,000 sq ft, 510 over 5,000 sq ft. Meter installation is billed separately.
    $291.90
Sewer$1,176.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Under 3,001 sq ft (210 gpd)
    Miami-Dade Water & Sewer Dept
    Sewer service here is provided by the Miami-Dade Water and Sewer Department (WASD). Its wastewater connection charge is $5.60 per average daily gallon (unchanged in the schedule effective October 1, 2026), applied to the County Code flow table for the home's total floor area: 210 gallons per day under 3,001 sq ft (shown), 310 for 3,001 to 5,000 sq ft, 510 over 5,000 sq ft. Homes on septic systems do not pay it.
    $1,176.00
City$0.00
  • Municipal Impact Fees (n/a — Unincorporated)
    Miami-Dade County
    Unincorporated Miami-Dade has no municipal government, so no city impact fees apply. All development impact fees in these areas (road, school, fire, park, and police) are collected by Miami-Dade County and appear as county fees.
    $0.00
County$19,191.86
  • Road (Mobility) Impact Fee (Miami-Dade County)
    Miami-Dade County
    Miami-Dade County mobility (road, transit and bicycle/pedestrian) impact fee, charged countywide including inside cities. The rate depends on the parcel's Context Zone; the unincorporated area spans all four zones and the amount shown is the highest of 4 rate districts (Zone 4) for a detached single-family home, a ceiling: Zone 1 $9,633, Zone 2 $9,275, Zone 3 $10,179, Zone 4 $10,625. A 2% administrative charge is added on top. Rates effective December 31, 2023 through December 30, 2027.
    $10,625.00
  • Parks & Recreation Impact Fee (Miami-Dade County)
    District 1 (North) - highest of 3
    Miami-Dade County
    One-time Miami-Dade County park impact fee (unincorporated area). Rate depends on the park benefit district: North $4,902.89, Middle $3,459.68, South $3,084.21 per single-family home. Highest (North) shown as a ceiling; effective through 12/30/2027.
    $4,902.89
  • Educational Facilities (School) Impact Fee (Miami-Dade County)
    Miami-Dade County Public Schools
    This educational-facilities (school) impact fee is charged countywide by Miami-Dade County, including within municipalities. It is calculated as $612 per unit plus $0.918 per gross square foot (capped at 3,800 sq ft); the amount shown is for a 2,000 sq ft single-family house. The current schedule runs through the end of 2027.
    $2,448.00
  • Police Impact Fee (Miami-Dade County)
    Miami-Dade County
    The county collects this police-facilities impact fee on behalf of this jurisdiction; the amount shown is the current flat per-unit rate, effective through the end of 2027.
    $688.42
  • Fire-Rescue Impact Fee (Miami-Dade County)
    Miami-Dade Fire Rescue
    This fire-rescue impact fee is collected by Miami-Dade County in areas served by Miami-Dade Fire Rescue, which includes this jurisdiction; the amount shown is the current per-unit rate. It does not apply in the municipalities that operate their own fire departments (Miami, Miami Beach, Hialeah, Coral Gables, and Key Biscayne). The current schedule runs through the end of 2027.
    $527.55
Total (unincorporated Miami-Dade County): $20,659.76

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County: Multifamily Impact Fees

A new multifamily unit in unincorporated Miami-Dade County pays $11,682.66 per unit in impact fees (rates sourced October 21, 2026). Of that, Miami-Dade County-levied fees account for $10,211.46 and municipal or utility fees for $1,471.20.

The largest line items are Road (Mobility) Impact Fee (Miami-Dade County, MF Mid/High-Rise) ($5,115.00), Parks & Recreation Impact Fee (Miami-Dade County, MF) ($2,878.04) and Educational Facilities (School) Impact Fee (Miami-Dade County, MF) ($1,530.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Miami-Dade County Impact Fee Schedule
Water$187.65
  • Water Connection Charge (Miami-Dade WASD, MF)
    Miami-Dade Water & Sewer Dept
    Water service here is provided by the Miami-Dade Water and Sewer Department (WASD). Its connection charge is $1.39 per average daily gallon (unchanged in the schedule effective October 1, 2026), applied to the County Code flow of 135 gallons per day per apartment unit. Meter installation is billed separately.
    $187.65
Sewer$756.00
  • Sewer Connection Charge (Miami-Dade WASD, MF)
    Miami-Dade Water & Sewer Dept
    Sewer service here is provided by the Miami-Dade Water and Sewer Department (WASD). Its wastewater connection charge is $5.60 per average daily gallon (unchanged in the schedule effective October 1, 2026), applied to the County Code flow of 135 gallons per day per apartment unit.
    $756.00
City$0.00
  • Municipal Impact Fees (n/a — Unincorporated, MF)
    Miami-Dade County
    Unincorporated Miami-Dade has no municipal government, so no city impact fees apply. All development impact fees in these areas (road, school, fire, park, and police) are collected by Miami-Dade County and appear as county fees.
    $0.00
County$10,739.01
  • Road (Mobility) Impact Fee (Miami-Dade County, MF Mid/High-Rise)
    Mid/High-Rise (3+ stories)
    Miami-Dade County
    Miami-Dade County mobility impact fee for mid- and high-rise multifamily units, charged countywide including inside cities. The rate depends on the parcel's Context Zone; the unincorporated area spans all four zones and the amount shown is the highest of 4 rate districts (Zone 4), a ceiling: Zone 1 $4,638, Zone 2 $4,465, Zone 3 $4,901, Zone 4 $5,115 per unit. A 2% administrative charge is added on top. Rates effective December 31, 2023 through December 30, 2027.
    $5,115.00
  • Parks & Recreation Impact Fee (Miami-Dade County, MF)
    District 1 (North) - highest of 3
    Miami-Dade County
    One-time Miami-Dade County park impact fee (unincorporated area). Rate depends on park benefit district: North $2,878.04, Middle $2,169.00, South $1,910.87 per multifamily unit. Highest (North) shown as a ceiling; effective through 12/30/2027.
    $2,878.04
  • Educational Facilities (School) Impact Fee (Miami-Dade County, MF)
    Miami-Dade County Public Schools
    Miami-Dade County educational facilities (school) impact fee, charged countywide including all municipalities. $612 per unit plus $0.918 per sq ft; shown here for a 1,000 sq ft unit ($1,530). Current schedule effective 12/31/2024 through 12/30/2027.
    $1,530.00
  • Police Impact Fee (Miami-Dade County, MF)
    Miami-Dade County
    The county collects this police-facilities impact fee on behalf of this jurisdiction; the amount shown is the current flat per-unit rate, effective through the end of 2027.
    $688.42
  • Fire-Rescue Impact Fee (Miami-Dade County, MF)
    Miami-Dade Fire Rescue
    This fire-rescue impact fee is collected by Miami-Dade County in areas served by Miami-Dade Fire Rescue, which includes this jurisdiction; the amount shown is the current per-unit rate. It does not apply in the municipalities that operate their own fire departments (Miami, Miami Beach, Hialeah, Coral Gables, and Key Biscayne). The current schedule runs through the end of 2027.
    $527.55
Total (unincorporated Miami-Dade County): $11,682.66

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$712,895.00this pageIncludes unconfirmed fees
Aventura$897,672.50Includes unconfirmed feesBal Harbour$661,812.00Includes unconfirmed feesBay Harbor Islands$606,603.58Includes unconfirmed feesBiscayne Park$697,730.00Includes unconfirmed feesCoral Gables$810,580.00Cutler Bay$697,760.00Includes unconfirmed feesDoral$669,960.00El Portal$661,260.00Includes unconfirmed feesFlorida City$953,330.00Includes unconfirmed feesGolden Beach$797,760.00Includes unconfirmed feesHialeah$679,664.00Hialeah Gardens$661,260.00Includes unconfirmed feesHomestead$714,747.73Includes unconfirmed feesIndian Creek$605,060.00Includes unconfirmed feesKey Biscayne$576,850.00Medley$706,510.00Includes unconfirmed feesMiami$837,636.00Includes unconfirmed feesMiami Beach$1,277,324.00Miami Gardens$816,260.00Includes unconfirmed feesMiami Lakes$1,538,168.50Includes unconfirmed feesMiami Shores$605,060.00Includes unconfirmed feesMiami Springs$605,060.00Includes unconfirmed feesNorth Bay Village$641,782.03Includes unconfirmed feesNorth Miami$1,027,183.00Includes unconfirmed feesNorth Miami Beach$808,323.00Includes unconfirmed feesOpa-locka$676,348.00Includes unconfirmed feesPalmetto Bay$972,195.00Includes unconfirmed feesPinecrest$732,760.00Includes unconfirmed feesSouth Miami$661,260.00Includes unconfirmed feesSunny Isles Beach$952,960.00Includes unconfirmed feesSurfside$605,821.00Includes unconfirmed feesSweetwater$877,110.00Includes unconfirmed feesVirginia Gardens$661,260.00Includes unconfirmed feesWest Miami$778,189.00Includes unconfirmed fees

Unincorporated Miami-Dade County: Commercial Impact Fees

Commercial development in unincorporated Miami-Dade County pays $14.26 per square foot in impact fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $712,895.00. The calculator below adjusts to your exact square footage.

The largest line items are Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft) and Police Services Impact Fee (Miami-Dade County, Commercial) ($0.48/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Charge (Miami-Dade WASD) and Sewer Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Miami-Dade County Impact Fee Schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Water service in most of the unincorporated area is provided by the Miami-Dade Water and Sewer Department (WASD); some parcels are served by a city utility. WASD charges nonresidential water connection charges at $1.39 per average daily gallon of estimated demand, with the gallonage set by land use under County Code Section 24-43.1; there is no meter-size ladder. Rate on the WASD schedule effective October 1, 2026, unchanged from the prior year. WASD also charges a water meter installation fee ($230 for a 1 in. meter) and, where it installs the service line, a service installation fee.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Sewer service in most of the unincorporated area is provided by the Miami-Dade Water and Sewer Department (WASD); some parcels are on septic systems or a city utility. WASD charges nonresidential sewer connection charges at $5.60 per average daily gallon of estimated demand ($2.80 with an approved graywater disposal system), with the gallonage set by land use under County Code Section 24-43.1; there is no meter-size ladder. Rate on the WASD schedule effective October 1, 2026, unchanged from the prior year.
    Contact jurisdiction/utility to verify
City$0.00
County$14.26/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), charged per gross square foot for a shopping plaza of 40,000 to 150,000 sq ft without a supermarket, on the rate schedule in effect December 31, 2023 through December 30, 2027. The rate depends on the parcel's Context Zone: Zone 1 $11.982, Zone 2 $11.537, Zone 3 $12.661 and Zone 4 $13.216 per sq ft. The unincorporated area contains all four zones. A 2% administrative fee is added to the mobility fee. Other retail uses carry their own rates on the county schedule.
    $13.22/sq ftRequires confirmation
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Miami-Dade County fire and emergency medical services impact fee, $0.5642 per square foot for retail and commercial uses, on the rate schedule in effect December 31, 2024 through December 30, 2027. It applies in the unincorporated area and in the cities served by the Miami-Dade Fire Rescue district.
    $0.56/sq ft
  • Police Services Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Miami-Dade County police services impact fee, $0.4777 per square foot for every nonresidential use, on the rate schedule in effect December 31, 2024 through December 30, 2027. It applies to development in unincorporated Miami-Dade County.
    $0.48/sq ft
Total (unincorporated Miami-Dade County): $14.26/sq ft (≈ $712,895.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Miami-Dade Water and Sewer Department Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$381,965.00this pageIncludes unconfirmed fees
Aventura$546,631.50Includes unconfirmed feesBal Harbour$347,232.00Includes unconfirmed feesBay Harbor Islands$324,973.58Includes unconfirmed feesBiscayne Park$383,150.00Includes unconfirmed feesCoral Gables$326,630.00Cutler Bay$366,680.00Includes unconfirmed feesDoral$355,380.00El Portal$346,680.00Includes unconfirmed feesFlorida City$467,140.00Includes unconfirmed feesGolden Beach$483,180.00Includes unconfirmed feesHialeah$317,661.50Hialeah Gardens$346,680.00Includes unconfirmed feesHomestead$383,817.73Includes unconfirmed feesIndian Creek$323,430.00Includes unconfirmed feesKey Biscayne$238,000.00Medley$358,330.00Includes unconfirmed feesMiami$283,276.00Includes unconfirmed feesMiami Beach$358,974.00Miami Gardens$501,680.00Includes unconfirmed feesMiami Lakes$392,555.00Includes unconfirmed feesMiami Shores$323,430.00Includes unconfirmed feesMiami Springs$323,430.00Includes unconfirmed feesNorth Bay Village$333,702.03Includes unconfirmed feesNorth Miami$514,653.00Includes unconfirmed feesNorth Miami Beach$485,583.00Includes unconfirmed feesOpa-locka$361,768.00Includes unconfirmed feesPalmetto Bay$490,315.00Includes unconfirmed feesPinecrest$372,180.00Includes unconfirmed feesSouth Miami$346,680.00Includes unconfirmed feesSunny Isles Beach$483,180.00Includes unconfirmed feesSurfside$324,191.00Includes unconfirmed feesSweetwater$408,580.00Includes unconfirmed feesVirginia Gardens$346,680.00Includes unconfirmed feesWest Miami$463,609.00Includes unconfirmed fees

Unincorporated Miami-Dade County: Industrial Impact Fees

Industrial development in unincorporated Miami-Dade County pays $7.64 per square foot in impact fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $381,965.00. The calculator below adjusts to your exact square footage.

The largest line items are Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft) and Police Services Impact Fee (Miami-Dade County, Industrial) ($0.48/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Charge (Miami-Dade WASD) and Sewer Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Miami-Dade County Impact Fee Schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Water service in most of the unincorporated area is provided by the Miami-Dade Water and Sewer Department (WASD); some parcels are served by a city utility. WASD charges nonresidential water connection charges at $1.39 per average daily gallon of estimated demand, with the gallonage set by land use under County Code Section 24-43.1; there is no meter-size ladder. Rate on the WASD schedule effective October 1, 2026, unchanged from the prior year. WASD also charges a water meter installation fee ($230 for a 1 in. meter) and, where it installs the service line, a service installation fee.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Sewer service in most of the unincorporated area is provided by the Miami-Dade Water and Sewer Department (WASD); some parcels are on septic systems or a city utility. WASD charges nonresidential sewer connection charges at $5.60 per average daily gallon of estimated demand ($2.80 with an approved graywater disposal system), with the gallonage set by land use under County Code Section 24-43.1; there is no meter-size ladder. Rate on the WASD schedule effective October 1, 2026, unchanged from the prior year.
    Contact jurisdiction/utility to verify
City$0.00
County$7.64/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), charged per square foot for general light industrial use, on the rate schedule in effect December 31, 2023 through December 30, 2027. The rate depends on the parcel's Context Zone: Zone 1 $4.944, Zone 2 $4.760, Zone 3 $5.225 and Zone 4 $5.453 per sq ft. The unincorporated area contains all four zones. A 2% administrative fee is added to the mobility fee. Other industrial uses carry their own rates on the county schedule.
    $5.45/sq ftRequires confirmation
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Miami-Dade County fire and emergency medical services impact fee, $1.7086 per square foot for industrial uses, on the rate schedule in effect December 31, 2024 through December 30, 2027. It applies in the unincorporated area and in the cities served by the Miami-Dade Fire Rescue district.
    $1.71/sq ft
  • Police Services Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Miami-Dade County police services impact fee, $0.4777 per square foot for every nonresidential use, on the rate schedule in effect December 31, 2024 through December 30, 2027. It applies to development in unincorporated Miami-Dade County.
    $0.48/sq ft
Total (unincorporated Miami-Dade County): $7.64/sq ft (≈ $381,965.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Miami-Dade Water and Sewer Department Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$507,970.00this pageIncludes unconfirmed fees
Aventura$580,707.25Includes unconfirmed feesBal Harbour$476,204.50Includes unconfirmed feesBay Harbor Islands$435,871.08Includes unconfirmed feesBiscayne Park$499,622.50Includes unconfirmed feesCoral Gables$569,630.00Cutler Bay$487,652.50Includes unconfirmed feesDoral$480,002.50El Portal$475,652.50Includes unconfirmed feesFlorida City$690,247.50Includes unconfirmed feesGolden Beach$543,902.50Includes unconfirmed feesHialeah$497,945.50Hialeah Gardens$475,652.50Includes unconfirmed feesHomestead$509,765.23Includes unconfirmed feesIndian Creek$434,327.50Includes unconfirmed feesKey Biscayne$423,850.00Medley$487,777.50Includes unconfirmed feesMiami$485,963.75Includes unconfirmed feesMiami Beach$553,324.00Miami Gardens$553,152.50Includes unconfirmed feesMiami Lakes$542,796.50Includes unconfirmed feesMiami Shores$434,327.50Includes unconfirmed feesMiami Springs$434,327.50Includes unconfirmed feesNorth Bay Village$443,224.53Includes unconfirmed feesNorth Miami$661,575.50Includes unconfirmed feesNorth Miami Beach$546,424.50Includes unconfirmed feesOpa-locka$486,590.50Includes unconfirmed feesPalmetto Bay$699,120.00Includes unconfirmed feesPinecrest$501,652.50Includes unconfirmed feesSouth Miami$475,652.50Includes unconfirmed feesSunny Isles Beach$587,077.50Includes unconfirmed feesSurfside$435,088.50Includes unconfirmed feesSweetwater$565,502.50Includes unconfirmed feesVirginia Gardens$475,652.50Includes unconfirmed feesWest Miami$537,581.50Includes unconfirmed fees

Unincorporated Miami-Dade County: Office Impact Fees

Office development in unincorporated Miami-Dade County pays $20.32 per square foot in impact fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to at least $507,970.00. The calculator below adjusts to your exact square footage.

The largest line items are Police Services Impact Fee (Miami-Dade County, Office) ($0.48/sq ft) and Fire and Emergency Services Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Charge (Miami-Dade WASD) and Sewer Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Miami-Dade County Impact Fee Schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Water service in most of the unincorporated area is provided by the Miami-Dade Water and Sewer Department (WASD); some parcels are served by a city utility. WASD charges nonresidential water connection charges at $1.39 per average daily gallon of estimated demand, with the gallonage set by land use under County Code Section 24-43.1; there is no meter-size ladder. Rate on the WASD schedule effective October 1, 2026, unchanged from the prior year. WASD also charges a water meter installation fee ($230 for a 1 in. meter) and, where it installs the service line, a service installation fee.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Sewer service in most of the unincorporated area is provided by the Miami-Dade Water and Sewer Department (WASD); some parcels are on septic systems or a city utility. WASD charges nonresidential sewer connection charges at $5.60 per average daily gallon of estimated demand ($2.80 with an approved graywater disposal system), with the gallonage set by land use under County Code Section 24-43.1; there is no meter-size ladder. Rate on the WASD schedule effective October 1, 2026, unchanged from the prior year.
    Contact jurisdiction/utility to verify
City$0.00
County$20.32/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), charged per gross square foot for a general office building of up to 50,000 sq ft, on the rate schedule in effect December 31, 2023 through December 30, 2027. The rate depends on the parcel's Context Zone: Zone 1 $17.610, Zone 2 $16.954, Zone 3 $18.607 and Zone 4 $19.422 per sq ft. The unincorporated area contains all four zones. Larger general office buildings pay lower rates by size bracket. A 2% administrative fee is added to the mobility fee.
    $19.42/sq ftRequires confirmation
  • Police Services Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Miami-Dade County police services impact fee, $0.4777 per square foot for every nonresidential use, on the rate schedule in effect December 31, 2024 through December 30, 2027. It applies to development in unincorporated Miami-Dade County.
    $0.48/sq ft
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Miami-Dade County fire and emergency medical services impact fee, $0.4191 per square foot for office uses, on the rate schedule in effect December 31, 2024 through December 30, 2027. It applies in the unincorporated area and in the cities served by the Miami-Dade Fire Rescue district.
    $0.42/sq ft
Total (unincorporated Miami-Dade County): $20.32/sq ft (≈ $507,970.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Miami-Dade Water and Sewer Department Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Miami-Dade County Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Miami-Dade County Impact Fee FAQs

What are single-family impact fees in Miami-Dade County, Florida?

A new single-family home in unincorporated Miami-Dade County pays $20,659.76 per unit in impact fees (rates sourced October 21, 2026). Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.

How much are multifamily impact fees in Miami-Dade County?

Multifamily development in unincorporated Miami-Dade County pays $11,682.66 per unit in impact fees (rates sourced October 21, 2026). Rates inside city limits depend on the municipality. Pick your city on this page.

How much are commercial impact fees in Miami-Dade County?

Commercial development in unincorporated Miami-Dade County pays $14.26 per square foot in impact fees, at least $712,895.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Do Kendall and Westchester pay Miami-Dade County impact fees?

Yes. Kendall, Westchester, Fontainebleau and The Hammocks are unincorporated, so new construction there pays the unincorporated Miami-Dade County schedule on this page, not a city schedule. Search a specific address in the calculator below to confirm it sits outside every city limit.

Do cities in Miami-Dade County charge their own impact fees?

Yes. Every incorporated city applies its own fee schedule. 32 of 34 cities in Miami-Dade County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000