North Miami Beach impact fees by project type
North Miami Beach: Single-Family Impact Fees
A new single-family home in North Miami Beach pays at least $15,041.45 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $12,250.55 and municipal or utility fees for $2,790.90.
The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities Impact Fee (Miami-Dade County) ($2,448.00) and Fire & Rescue Impact Fee (Miami-Dade County) ($527.55).
Sewer Impact Fee (NMB Water) and Water Impact Fee (NMB Water) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Parks & Recreation Impact Fee (City of North Miami Beach) and Police Impact Fee (City of North Miami Beach) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Impact Fee (NMB Water)$1,579.20Requires confirmationNMB Water (City of North Miami Beach)NMB Water own utility. Ord. 2025-06 eff 9/8/2025, Sec 19-22: $7.52 per est. gal/day. SFR modeled at 210 gpd = $1,579.20. Note Sec 19-23 fire-flow charge ($1.64+/sf) may add for larger structures. VERIFY NMB gallonage basis: Karim Rossy 305-948-2980 x31001.
- Sewer Impact Fee (NMB Water)$1,211.70Requires confirmationNMB Water (City of North Miami Beach)Ord. 2025-06 eff 9/8/2025, Sec 19-31: $5.77 per avg daily rated gallon. SFR modeled at 210 gpd = $1,211.70. VERIFY gallonage basis: NMB Water 305-948-2980.
- Parks & Recreation Impact Fee (City of North Miami Beach)Requires confirmation$0 placeholder. Park impact fees collected by cities in Miami-Dade. Amount not confirmed. VERIFY: NMB Community Development 305-948-2966.
- Police Impact Fee (City of North Miami Beach)Requires confirmation$0 placeholder. Police impact fees collected by cities in Miami-Dade. Amount not confirmed. VERIFY: NMB 305-948-2966.
- Road (Mobility) Impact Fee (Miami-Dade County)$9,275.00Miami-Dade CountyCounty Road/Mobility fee, countywide. Context Zone 2 rep SFR $9,275. Eff 12/31/2023–12/30/2027.
- Educational Facilities Impact Fee (Miami-Dade County)$2,448.00Miami-Dade County / School BoardCounty School fee, countywide. $612/unit + $0.918/gsf; SFR @2,000 gsf = $2,448. Eff 12/31/2024–12/30/2027.
- Fire & Rescue Impact Fee (Miami-Dade County)$527.55Miami-Dade CountyCounty Fire & Rescue fee $527.55; NMB served by Miami-Dade Fire Rescue. Eff 12/31/2024–12/30/2027.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Miami Beach: Multifamily Impact Fees
A new multifamily unit in North Miami Beach pays at least $7,398.70 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $5,604.55 and municipal or utility fees for $1,794.15.
The largest line items are Road (Mobility) Impact Fee (Miami-Dade County, MF) ($4,465.00), Educational Facilities Impact Fee (Miami-Dade County, MF) ($612.00) and Fire & Rescue Impact Fee (Miami-Dade County, MF) ($527.55).
Sewer Impact Fee (NMB Water, MF) and Water Impact Fee (NMB Water, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Parks & Recreation Impact Fee (City of North Miami Beach, MF) and Police Impact Fee (City of North Miami Beach, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Impact Fee (NMB Water, MF)$1,015.20Requires confirmationNMB Water (City of North Miami Beach)NMB Water own utility. Ord.2025-06 eff 9/8/2025 Sec 19-22: $7.52/gal-day; MF apartment 135 gpd = $1,015.20. Plus Sec 19-23 fire-flow ($1.64+/sf). VERIFY gallonage: 305-948-2980 x31001.
- Sewer Impact Fee (NMB Water, MF)$778.95Requires confirmationNMB Water (City of North Miami Beach)Ord.2025-06 eff 9/8/2025 Sec 19-31: $5.77/gal; MF 135 gpd = $778.95. VERIFY gallonage: 305-948-2980.
- Parks & Recreation Impact Fee (City of North Miami Beach, MF)Requires confirmation$0 placeholder. City-collected park fee not confirmed. VERIFY: NMB 305-948-2966.
- Police Impact Fee (City of North Miami Beach, MF)Requires confirmation$0 placeholder. City-collected police fee not confirmed. VERIFY: NMB 305-948-2966.
- Road (Mobility) Impact Fee (Miami-Dade County, MF)$4,465.00Miami-Dade CountyCounty Road/Mobility MF Mid/High-Rise, Zone 2 = $4,465. Countywide.
- Educational Facilities Impact Fee (Miami-Dade County, MF)$612.00Miami-Dade County / School BoardCounty School fee, MF base $612/unit. Countywide.
- Fire & Rescue Impact Fee (Miami-Dade County, MF)$527.55Miami-Dade CountyCounty Fire & Rescue $527.55; NMB served by Miami-Dade Fire Rescue.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Miami Beach: Commercial Impact Fees
Commercial development in North Miami Beach pays $16.17 per square foot in impact fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $808,323.00. The calculator below adjusts to your exact square footage.
The largest line items are Fire Flow Demand Charge (NMB Water) — first 100,000 sq ft ($2.73/sq ft), Fire-Rescue Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft) and Police Impact Fee (City of North Miami Beach, Commercial) ($0.21/sq ft).
Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water In-Plant Charge (NMB Water) and Sewer Connection Charge (NMB Water) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Fire Flow Demand Charge (NMB Water) — first 100,000 sq ft$2.73/sq ftNMB Water (City of North Miami Beach)CANONICAL TIER (contains the canonical 50,000 sf Commercial and 25,000 sf Office). Ord. 2025-06 (eff. 9/8/2025), Code Sec. 19-23 'Fire Flow Demand Charge on New Buildings and Conversions' — a SECOND, STACKING water-side charge on top of the Sec. 19-22 in-plant gallonage charge. Rate is per GROSS SQUARE FOOT of floor area, graduated by building size, for structures within the water service area. TWO SEPARATE LADDERS: this record uses the 'Commercial and Other Uses Not Mentioned or Expected' ladder — first 100,000 sf $2.73 / next 100,000 sf $2.18 / next 200,000 sf $1.64 / next 200,000 sf $1.09 / thereafter $0.55. The other ladder ('Multi-family Dwellings, Hotels, Schools, etc.') is materially cheaper (first 100,000 sf $1.64) and is NOT the nonres ladder. NMB Water Engineering, Karim Rossy (305) 948-2980 ext. 31001.
- Water In-Plant Charge (NMB Water)Contact jurisdiction/utility to verifyNMB Water (City of North Miami Beach)PROVIDER: NMB Water, the City of North Miami Beach's own public utility — NOT WASD, so WASD's $1.39/gal retail connection charge does not apply. Ord. 2025-06 (eff. 9/8/2025), Code Sec. 19-22 'Additional Charge for Expansion and Upgrading of City's Water Facilities' (updating Ord. 2006-20 water in-plant fees): 'Each gallon per day — seven dollars and fifty-two cents ($7.52)', computed on the basis of ESTIMATED GALLONAGE. NO METER LADDER. A SEPARATE Fire Flow Demand Charge (Sec. 19-23) STACKS on top of this and is charged per gross sq ft of floor area — see those records. NMB Water also serves the Bunche Park area of Miami Gardens. NMB Water Engineering, Karim Rossy (305) 948-2980 ext. 31001.
- Sewer Connection Charge (NMB Water)Contact jurisdiction/utility to verifyNMB Water (City of North Miami Beach)PROVIDER: NMB Water (City of North Miami Beach's own utility) — not WASD. Ord. 2025-06 (eff. 9/8/2025), Code Sec. 19-31 'Rates & Charges' Sanitary Sewer: 'There is a charge of five dollars and seventy-seven cents ($5.77) per average daily rated gallon for any given connection.' NO METER LADDER — priced on average daily rated gallonage. Proceeds are restricted to new sanitary facilities, renewal/replacement, and system expansion. NMB Water Engineering, Karim Rossy (305) 948-2980 ext. 31001.
- Police Impact Fee (City of North Miami Beach, Commercial)$0.21/sq ftCity of North Miami Beach⚠️ NMB DOES LEVY A NONRES CITY IMPACT FEE (the residential pass had it as an unconfirmed $0). Code Ch. XXIV Art. XVIII 'Police Impact Fee', Sec. 24-206 (Ord. No. 2005-16). Sec. 24-205 imposes it on ANY person seeking to develop land in the City by applying for a building permit — not residential-only. Schedule columns: Land Use | Unit | 24-hr Functional Resident Coefficient | Impact Fee. CANONICAL TIER: schedule row 'Retail 50K gsf or less' = $211.26 per 1,000 sf (coefficient 2.94) — the tier containing the canonical 50,000 sq ft. General retail is TIERED BY CENTER SIZE: 50K or less $211.26 / 50,001-100K $247.35 / 100,001-200K $259.83 / over 200K $209.89. Rates are the Ord. 2005-16 amounts; the article contains NO indexing or annual-adjustment clause, so they have not moved since 2005. NMB's other impact fee, the Park Impact Fee (Art. XVII), is RESIDENTIAL-ONLY — Sec. 24-193(A) imposes it only on 'a building permit for a residential building'. Planning & Zoning (305) 948-2966.
- Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)$12.66/sq ftRequires confirmationMiami-Dade CountyCode Ch. 33E; countywide incl. all municipalities (Sec. 33E-2(c)). Context Zone 3: North Miami Beach is NOT named in any Sec. 33E-7.1 zone list and lies NORTH of the NE 125th St / Broad Causeway closing line of the Zone 2 mainland polygon, in the 'northeastern-most part of the County' that Sec. 33E-7.1(b) assigns to Zone 3. Schedule row: 'Shopping Plaza (40-150 kgsf) w/o Supermarket' Zone 3 = $12.661/sf (Z1 $11.982 / Z2 $11.537 / Z4 $13.216). Eff. 12/31/2023-12/30/2027; excl. 2% admin fee. UNCONFIRMED - parcel-specific (Zone 1 is a SMART Plan Corridor OVERLAY). (786) 315-2670.
- Fire-Rescue Impact Fee (Miami-Dade County, Commercial)$0.56/sq ftMiami-Dade CountyCode Sec. 33J-1(b) - applies throughout the MDFR District incl. all municipalities served by it. North Miami Beach has no municipal fire dept and is served by MDFR (County exception list is only Miami, Miami Beach, Hialeah, Coral Gables, Key Biscayne). Commercial $0.5642/sf. Eff. 12/31/2024-12/30/2027.
- Police Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade County$0 CONFIRMED. Code Sec. 33I-1(b) makes the county Police Services Impact Fee 'applicable to all land development in unincorporated Miami-Dade County' - it reaches no municipality. North Miami Beach runs its own police department AND levies its OWN police impact fee (Code Art. XVIII, Sec. 24-206) - see the separate City record.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Miami Beach: Industrial Impact Fees
Industrial development in North Miami Beach pays $9.71 per square foot in impact fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $485,583.00. The calculator below adjusts to your exact square footage.
The largest line items are Fire Flow Demand Charge (NMB Water) — first 100,000 sq ft ($2.73/sq ft), Fire-Rescue Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft) and Police Impact Fee (City of North Miami Beach, Industrial) ($0.05/sq ft).
Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water In-Plant Charge (NMB Water) and Sewer Connection Charge (NMB Water) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Fire Flow Demand Charge (NMB Water) — first 100,000 sq ft$2.73/sq ftNMB Water (City of North Miami Beach)CANONICAL TIER (contains the canonical 50,000 sf Commercial and 25,000 sf Office). Ord. 2025-06 (eff. 9/8/2025), Code Sec. 19-23 'Fire Flow Demand Charge on New Buildings and Conversions' — a SECOND, STACKING water-side charge on top of the Sec. 19-22 in-plant gallonage charge. Rate is per GROSS SQUARE FOOT of floor area, graduated by building size, for structures within the water service area. TWO SEPARATE LADDERS: this record uses the 'Commercial and Other Uses Not Mentioned or Expected' ladder — first 100,000 sf $2.73 / next 100,000 sf $2.18 / next 200,000 sf $1.64 / next 200,000 sf $1.09 / thereafter $0.55. The other ladder ('Multi-family Dwellings, Hotels, Schools, etc.') is materially cheaper (first 100,000 sf $1.64) and is NOT the nonres ladder. NMB Water Engineering, Karim Rossy (305) 948-2980 ext. 31001.
- Water In-Plant Charge (NMB Water)Contact jurisdiction/utility to verifyNMB Water (City of North Miami Beach)PROVIDER: NMB Water, the City of North Miami Beach's own public utility — NOT WASD, so WASD's $1.39/gal retail connection charge does not apply. Ord. 2025-06 (eff. 9/8/2025), Code Sec. 19-22 'Additional Charge for Expansion and Upgrading of City's Water Facilities' (updating Ord. 2006-20 water in-plant fees): 'Each gallon per day — seven dollars and fifty-two cents ($7.52)', computed on the basis of ESTIMATED GALLONAGE. NO METER LADDER. A SEPARATE Fire Flow Demand Charge (Sec. 19-23) STACKS on top of this and is charged per gross sq ft of floor area — see those records. NMB Water also serves the Bunche Park area of Miami Gardens. NMB Water Engineering, Karim Rossy (305) 948-2980 ext. 31001.
- Sewer Connection Charge (NMB Water)Contact jurisdiction/utility to verifyNMB Water (City of North Miami Beach)PROVIDER: NMB Water (City of North Miami Beach's own utility) — not WASD. Ord. 2025-06 (eff. 9/8/2025), Code Sec. 19-31 'Rates & Charges' Sanitary Sewer: 'There is a charge of five dollars and seventy-seven cents ($5.77) per average daily rated gallon for any given connection.' NO METER LADDER — priced on average daily rated gallonage. Proceeds are restricted to new sanitary facilities, renewal/replacement, and system expansion. NMB Water Engineering, Karim Rossy (305) 948-2980 ext. 31001.
- Police Impact Fee (City of North Miami Beach, Industrial)$0.05/sq ftCity of North Miami Beach⚠️ NMB DOES LEVY A NONRES CITY IMPACT FEE. Code Ch. XXIV Art. XVIII, Sec. 24-206 (Ord. 2005-16). Schedule row: 'General Industrial' = $48.06 per 1,000 sf (coefficient 0.67) — the general light-industrial row, untiered. Other industrial rows not used per the default-row-only rule: Manufacturing $35.68, Warehouse $27.71, Mini-Warehouse $5.46. No indexing clause — rates unchanged since 2005. Planning & Zoning (305) 948-2966.
- Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)$5.22/sq ftRequires confirmationMiami-Dade CountyCode Ch. 33E; countywide. Context Zone 3 (not named; north of the NE 125th St Zone 2 closing line). Schedule row: 'General Light Industrial' Zone 3 = $5.225/sf. Eff. 12/31/2023-12/30/2027; excl. 2% admin fee. UNCONFIRMED - parcel-specific. (786) 315-2670.
- Fire-Rescue Impact Fee (Miami-Dade County, Industrial)$1.71/sq ftMiami-Dade CountyCode Sec. 33J-1(b) - MDFR District, incl. North Miami Beach (no municipal fire dept). Industrial $1.7086/sf. Eff. 12/31/2024-12/30/2027.
- Police Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade County$0 CONFIRMED. Code Sec. 33I-1(b) - unincorporated Miami-Dade only. NMB levies its own police impact fee instead (Code Art. XVIII).
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Miami Beach: Office Impact Fees
Office development in North Miami Beach pays $21.86 per square foot in impact fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $546,424.50. The calculator below adjusts to your exact square footage.
The largest line items are Fire Flow Demand Charge (NMB Water) — first 100,000 sq ft ($2.73/sq ft), Fire-Rescue Impact Fee (Miami-Dade County, Office) ($0.42/sq ft) and Police Impact Fee (City of North Miami Beach, Office) ($0.10/sq ft).
Multimodal Mobility Impact Fee (Miami-Dade County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Water In-Plant Charge (NMB Water) and Sewer Connection Charge (NMB Water) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Fire Flow Demand Charge (NMB Water) — first 100,000 sq ft$2.73/sq ftNMB Water (City of North Miami Beach)CANONICAL TIER (contains the canonical 50,000 sf Commercial and 25,000 sf Office). Ord. 2025-06 (eff. 9/8/2025), Code Sec. 19-23 'Fire Flow Demand Charge on New Buildings and Conversions' — a SECOND, STACKING water-side charge on top of the Sec. 19-22 in-plant gallonage charge. Rate is per GROSS SQUARE FOOT of floor area, graduated by building size, for structures within the water service area. TWO SEPARATE LADDERS: this record uses the 'Commercial and Other Uses Not Mentioned or Expected' ladder — first 100,000 sf $2.73 / next 100,000 sf $2.18 / next 200,000 sf $1.64 / next 200,000 sf $1.09 / thereafter $0.55. The other ladder ('Multi-family Dwellings, Hotels, Schools, etc.') is materially cheaper (first 100,000 sf $1.64) and is NOT the nonres ladder. NMB Water Engineering, Karim Rossy (305) 948-2980 ext. 31001.
- Water In-Plant Charge (NMB Water)Contact jurisdiction/utility to verifyNMB Water (City of North Miami Beach)PROVIDER: NMB Water, the City of North Miami Beach's own public utility — NOT WASD, so WASD's $1.39/gal retail connection charge does not apply. Ord. 2025-06 (eff. 9/8/2025), Code Sec. 19-22 'Additional Charge for Expansion and Upgrading of City's Water Facilities' (updating Ord. 2006-20 water in-plant fees): 'Each gallon per day — seven dollars and fifty-two cents ($7.52)', computed on the basis of ESTIMATED GALLONAGE. NO METER LADDER. A SEPARATE Fire Flow Demand Charge (Sec. 19-23) STACKS on top of this and is charged per gross sq ft of floor area — see those records. NMB Water also serves the Bunche Park area of Miami Gardens. NMB Water Engineering, Karim Rossy (305) 948-2980 ext. 31001.
- Sewer Connection Charge (NMB Water)Contact jurisdiction/utility to verifyNMB Water (City of North Miami Beach)PROVIDER: NMB Water (City of North Miami Beach's own utility) — not WASD. Ord. 2025-06 (eff. 9/8/2025), Code Sec. 19-31 'Rates & Charges' Sanitary Sewer: 'There is a charge of five dollars and seventy-seven cents ($5.77) per average daily rated gallon for any given connection.' NO METER LADDER — priced on average daily rated gallonage. Proceeds are restricted to new sanitary facilities, renewal/replacement, and system expansion. NMB Water Engineering, Karim Rossy (305) 948-2980 ext. 31001.
- Police Impact Fee (City of North Miami Beach, Office)$0.10/sq ftCity of North Miami Beach⚠️ NMB DOES LEVY A NONRES CITY IMPACT FEE. Code Ch. XXIV Art. XVIII, Sec. 24-206 (Ord. 2005-16). CANONICAL TIER: schedule row 'Office 50K gsf or less' = $100.88 per 1,000 sf (coefficient 1.40) — the tier containing the canonical 25,000 sq ft. Office is tiered by building size: 50K or less $100.88 / greater than 50K $53.31. Medical Office ($122.49) and Bank ($187.51) are separate land-use rows, not used per the default-row-only rule. No indexing clause — rates unchanged since 2005. Planning & Zoning (305) 948-2966.
- Multimodal Mobility Impact Fee (Miami-Dade County, Office)$18.61/sq ftRequires confirmationMiami-Dade CountyCode Ch. 33E; countywide. Context Zone 3 (North Miami Beach not named in Sec. 33E-7.1; north of the NE 125th St Zone 2 closing line). Schedule row: 'General Office, 1-50,000 gsf' Zone 3 = $18.607/sf. Eff. 12/31/2023-12/30/2027; excl. 2% admin fee. UNCONFIRMED - parcel-specific. (786) 315-2670.
- Fire-Rescue Impact Fee (Miami-Dade County, Office)$0.42/sq ftMiami-Dade CountyCode Sec. 33J-1(b) - MDFR District, incl. North Miami Beach (no municipal fire dept). Office $0.4191/sf. Eff. 12/31/2024-12/30/2027.
- Police Impact Fee (Miami-Dade County, Office)$0.00Miami-Dade County$0 CONFIRMED. Code Sec. 33I-1(b) - unincorporated Miami-Dade only. NMB levies its own police impact fee instead (Code Art. XVIII).
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in North Miami Beach
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in North Miami Beach, Florida?
A new single-family home in North Miami Beach pays at least $15,041.45 per unit in combined impact fees (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in North Miami Beach?
Commercial development in North Miami Beach pays $16.17 per square foot in impact fees, at least $808,323.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does North Miami Beach charge its own impact fees?
Yes. North Miami Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in North Miami Beach, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.