Skip to content
IMPACTFEES.ORG

Surfside, Florida Impact Fees

Surfside applies its own fee schedule: municipal fees plus the Miami-Dade County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $13,011.55 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Surfside Impact Fees by Project Type

Surfside: Single-Family Impact Fees

A new single-family home in Surfside pays at least $13,011.55 per unit in impact fees (rates sourced October 21, 2026). Of that, Miami-Dade County-levied fees account for $11,723.00 and municipal or utility fees for $1,288.55.

The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Water and Sewer Development Fee (Town of Surfside) ($761.00).

Sewer Connection Charge (Town of Surfside) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Surfside Impact Fee Schedule
Water$761.00
  • Water and Sewer Development Fee (Town of Surfside)
    Town of Surfside
    Surfside runs its own water and sewer system (water bought wholesale). The Town charges a combined water supply and sewer service development fee of $761 per equivalent single-family unit, paid when the first water, sewer, foundation or building permit is issued, in addition to the Town's tapping and connection charges.
    $761.00
Sewer$0.00
  • Sewer Connection Charge (Town of Surfside)
    Town of Surfside
    Surfside provides its own sewer service. The Town's combined water and sewer development fee ($761 per unit) is shown under water; any separate sewer connection charge is set by Town Commission resolution and is not published.
    Requires confirmation
City$0.00
County$12,250.55
  • Road (Mobility) Impact Fee (Miami-Dade County)
    Miami-Dade County
    This road (mobility) impact fee is paid countywide to Miami-Dade County. The rate varies by the geographic Context Zone assigned to each parcel; the amount shown is the lowest-zone (Zone 2) rate for a detached single-family home, and parcels in higher zones pay more. A separate 2% administrative charge applies on top of the base. The current schedule runs through the end of 2027.
    $9,275.00
  • Educational Facilities (School) Impact Fee (Miami-Dade County)
    Miami-Dade County Public Schools
    This educational-facilities (school) impact fee is charged countywide by Miami-Dade County, including within municipalities. It is calculated as $612 per unit plus $0.918 per gross square foot (capped at 3,800 sq ft); the amount shown is for a 2,000 sq ft single-family house. The current schedule runs through the end of 2027.
    $2,448.00
  • Fire-Rescue Impact Fee (Miami-Dade County)
    Miami-Dade Fire Rescue
    This fire-rescue impact fee is collected by Miami-Dade County in areas served by Miami-Dade Fire Rescue, which includes this jurisdiction; the amount shown is the current per-unit rate. It does not apply in the municipalities that operate their own fire departments (Miami, Miami Beach, Hialeah, Coral Gables, and Key Biscayne). The current schedule runs through the end of 2027.
    $527.55
Total (Surfside): $13,011.55
Sources last checked Official fee schedules:Town of Surfside Miami-Dade County Miami-Dade County Public Schools Miami-Dade Fire Rescue
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Surfside: Multifamily Impact Fees

A new multifamily unit in Surfside pays at least $7,283.55 per unit in impact fees (rates sourced October 21, 2026). Of that, Miami-Dade County-levied fees account for $5,995.00 and municipal or utility fees for $1,288.55.

The largest line items are Road (Mobility) Impact Fee (Miami-Dade County, MF Mid/High-Rise) ($4,465.00), Educational Facilities (School) Impact Fee (Miami-Dade County, MF) ($1,530.00) and Water and Sewer Development Fee (Town of Surfside, MF) ($761.00).

Sewer Connection Charge (Town of Surfside, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Surfside Impact Fee Schedule
Water$761.00
  • Water and Sewer Development Fee (Town of Surfside, MF)
    Town of Surfside
    Surfside runs its own water and sewer system. The Town charges a combined water supply and sewer service development fee of $761 per apartment or condominium unit, whether or not one connection serves the whole building, paid when the first water, sewer, foundation or building permit is issued.
    $761.00
Sewer$0.00
  • Sewer Connection Charge (Town of Surfside, MF)
    Town of Surfside
    Surfside provides its own sewer service. The Town's combined water and sewer development fee ($761 per unit) is shown under water; any separate sewer connection charge is set by Town Commission resolution and is not published.
    Requires confirmation
City$0.00
County$6,522.55
  • Road (Mobility) Impact Fee (Miami-Dade County, MF Mid/High-Rise)
    Mid/High-Rise (3+ stories)
    Miami-Dade County
    This road (mobility) impact fee is paid countywide to Miami-Dade County. It applies to mid- and high-rise multifamily buildings (3 or more stories), and the rate varies by the Context Zone assigned to each parcel; the amount shown is the lowest-zone (Zone 2) rate, and parcels in higher zones pay more. A separate 2% administrative charge applies on top of the base. The current schedule runs through the end of 2027.
    $4,465.00
  • Educational Facilities (School) Impact Fee (Miami-Dade County, MF)
    Miami-Dade County Public Schools
    Miami-Dade County educational facilities (school) impact fee, charged countywide including all municipalities. $612 per unit plus $0.918 per sq ft; shown here for a 1,000 sq ft unit ($1,530). Current schedule effective 12/31/2024 through 12/30/2027.
    $1,530.00
  • Fire-Rescue Impact Fee (Miami-Dade County, MF)
    Miami-Dade Fire Rescue
    This fire-rescue impact fee is collected by Miami-Dade County in areas served by Miami-Dade Fire Rescue, which includes this jurisdiction; the amount shown is the current per-unit rate. It does not apply in the municipalities that operate their own fire departments (Miami, Miami Beach, Hialeah, Coral Gables, and Key Biscayne). The current schedule runs through the end of 2027.
    $527.55
Total (Surfside): $7,283.55
Sources last checked Official fee schedules:Town of Surfside Miami-Dade County Miami-Dade County Public Schools Miami-Dade Fire Rescue
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Surfside: Commercial Impact Fees

Commercial development in Surfside pays $12.10 per square foot in impact fees, plus $761.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $605,821.00. The calculator below adjusts to your exact square footage.

The largest line items are Water and Sewer Development Fee (Town of Surfside) ($761.00 one-time), Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) ($11.54/sq ft) and Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).

Water Tapping Charge (Town of Surfside) and Sewer Connection Charge (Town of Surfside) are set by the utility and not published online. Municipal Impact Fee (Town of Surfside, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Surfside Impact Fee Schedule
Water$761.00 one-time
  • Water and Sewer Development Fee (Town of Surfside)
    Town of Surfside
    The Town of Surfside provides water and sewer service. Its one-time water and sewer development fee is $761 per equivalent residential unit; a nonresidential account counts one unit for each 15 plumbing fixture units or part thereof, so the amount shown is the one-unit minimum. Paid when the first water, sewer, foundation or building permit is issued.
    $761.00 one-time
  • Water Tapping Charge (Town of Surfside)
    Town of Surfside
    The Town of Surfside sets a water tapping charge by resolution for new, enlarged or reduced water service, covering the tap and the service installation to the property line. No amount is published.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Charge (Town of Surfside)
    Town of Surfside
    The Town of Surfside provides sewer service. Its combined water and sewer development fee is shown on the water row; no separate one-time sewer connection charge is published.
    Requires confirmation
City$0.00
County$12.10/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), which applies countywide, charged per gross square foot for a shopping plaza of 40,000 to 150,000 sq ft without a supermarket, on the rate schedule in effect December 31, 2023 through December 30, 2027. Rates by parcel Context Zone: Zone 1 $11.982, Zone 2 $11.537, Zone 3 $12.661, Zone 4 $13.216 per sq ft; Surfside is in Zone 2. A 2% administrative fee is added.
    $11.54/sq ft
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Miami-Dade County fire and emergency medical services impact fee, $0.5642 per square foot for retail and commercial uses, on the rate schedule in effect December 31, 2024 through December 30, 2027. Surfside is served by the Miami-Dade Fire Rescue district, so the county fee applies.
    $0.56/sq ft
  • Police Services Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    The Miami-Dade County police services impact fee applies only in unincorporated Miami-Dade County, so it is not charged in Surfside.
    $0.00
Total (Surfside): $12.10/sq ft + $761.00 one-time (≈ $605,821.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Surfside Miami-Dade County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$712,895.00Includes unconfirmed feesAventura$897,672.50Includes unconfirmed feesBal Harbour$661,812.00Includes unconfirmed feesBay Harbor Islands$606,603.58Includes unconfirmed feesBiscayne Park$697,730.00Includes unconfirmed feesCoral Gables$810,580.00Cutler Bay$697,760.00Includes unconfirmed feesDoral$669,960.00El Portal$661,260.00Includes unconfirmed feesFlorida City$953,330.00Includes unconfirmed feesGolden Beach$797,760.00Includes unconfirmed feesHialeah$679,664.00Hialeah Gardens$661,260.00Includes unconfirmed feesHomestead$714,747.73Includes unconfirmed feesIndian Creek$605,060.00Includes unconfirmed feesKey Biscayne$576,850.00Medley$706,510.00Includes unconfirmed feesMiami$837,636.00Includes unconfirmed feesMiami Beach$1,277,324.00Miami Gardens$816,260.00Includes unconfirmed feesMiami Lakes$1,538,168.50Includes unconfirmed feesMiami Shores$605,060.00Includes unconfirmed feesMiami Springs$605,060.00Includes unconfirmed feesNorth Bay Village$641,782.03Includes unconfirmed feesNorth Miami$1,027,183.00Includes unconfirmed feesNorth Miami Beach$808,323.00Includes unconfirmed feesOpa-locka$676,348.00Includes unconfirmed feesPalmetto Bay$972,195.00Includes unconfirmed feesPinecrest$732,760.00Includes unconfirmed feesSouth Miami$661,260.00Includes unconfirmed feesSunny Isles Beach$952,960.00Includes unconfirmed fees
Surfside$605,821.00this pageIncludes unconfirmed fees
Sweetwater$877,110.00Includes unconfirmed feesVirginia Gardens$661,260.00Includes unconfirmed feesWest Miami$778,189.00Includes unconfirmed fees

Surfside: Industrial Impact Fees

Industrial development in Surfside pays $6.47 per square foot in impact fees, plus $761.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $324,191.00. The calculator below adjusts to your exact square footage.

The largest line items are Water and Sewer Development Fee (Town of Surfside) ($761.00 one-time), Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) ($4.76/sq ft) and Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft).

Water Tapping Charge (Town of Surfside) and Sewer Connection Charge (Town of Surfside) are set by the utility and not published online. Municipal Impact Fee (Town of Surfside, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Surfside Impact Fee Schedule
Water$761.00 one-time
  • Water and Sewer Development Fee (Town of Surfside)
    Town of Surfside
    The Town of Surfside provides water and sewer service. Its one-time water and sewer development fee is $761 per equivalent residential unit; a nonresidential account counts one unit for each 15 plumbing fixture units or part thereof, so the amount shown is the one-unit minimum. Paid when the first water, sewer, foundation or building permit is issued.
    $761.00 one-time
  • Water Tapping Charge (Town of Surfside)
    Town of Surfside
    The Town of Surfside sets a water tapping charge by resolution for new, enlarged or reduced water service, covering the tap and the service installation to the property line. No amount is published.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Charge (Town of Surfside)
    Town of Surfside
    The Town of Surfside provides sewer service. Its combined water and sewer development fee is shown on the water row; no separate one-time sewer connection charge is published.
    Requires confirmation
City$0.00
County$6.47/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), which applies countywide, charged per square foot for general light industrial use, on the rate schedule in effect December 31, 2023 through December 30, 2027. Rates by parcel Context Zone: Zone 1 $4.944, Zone 2 $4.760, Zone 3 $5.225, Zone 4 $5.453 per sq ft; Surfside is in Zone 2. A 2% administrative fee is added.
    $4.76/sq ft
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Miami-Dade County fire and emergency medical services impact fee, $1.7086 per square foot for industrial uses, on the rate schedule in effect December 31, 2024 through December 30, 2027. Surfside is served by the Miami-Dade Fire Rescue district, so the county fee applies.
    $1.71/sq ft
  • Police Services Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    The Miami-Dade County police services impact fee applies only in unincorporated Miami-Dade County, so it is not charged in Surfside.
    $0.00
Total (Surfside): $6.47/sq ft + $761.00 one-time (≈ $324,191.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Surfside Miami-Dade County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$381,965.00Includes unconfirmed feesAventura$546,631.50Includes unconfirmed feesBal Harbour$347,232.00Includes unconfirmed feesBay Harbor Islands$324,973.58Includes unconfirmed feesBiscayne Park$383,150.00Includes unconfirmed feesCoral Gables$326,630.00Cutler Bay$366,680.00Includes unconfirmed feesDoral$355,380.00El Portal$346,680.00Includes unconfirmed feesFlorida City$467,140.00Includes unconfirmed feesGolden Beach$483,180.00Includes unconfirmed feesHialeah$317,661.50Hialeah Gardens$346,680.00Includes unconfirmed feesHomestead$383,817.73Includes unconfirmed feesIndian Creek$323,430.00Includes unconfirmed feesKey Biscayne$238,000.00Medley$358,330.00Includes unconfirmed feesMiami$283,276.00Includes unconfirmed feesMiami Beach$358,974.00Miami Gardens$501,680.00Includes unconfirmed feesMiami Lakes$392,555.00Includes unconfirmed feesMiami Shores$323,430.00Includes unconfirmed feesMiami Springs$323,430.00Includes unconfirmed feesNorth Bay Village$333,702.03Includes unconfirmed feesNorth Miami$514,653.00Includes unconfirmed feesNorth Miami Beach$485,583.00Includes unconfirmed feesOpa-locka$361,768.00Includes unconfirmed feesPalmetto Bay$490,315.00Includes unconfirmed feesPinecrest$372,180.00Includes unconfirmed feesSouth Miami$346,680.00Includes unconfirmed feesSunny Isles Beach$483,180.00Includes unconfirmed fees
Surfside$324,191.00this pageIncludes unconfirmed fees
Sweetwater$408,580.00Includes unconfirmed feesVirginia Gardens$346,680.00Includes unconfirmed feesWest Miami$463,609.00Includes unconfirmed fees

Surfside: Office Impact Fees

Office development in Surfside pays $17.37 per square foot in impact fees, plus $761.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to at least $435,088.50. The calculator below adjusts to your exact square footage.

The largest line items are Water and Sewer Development Fee (Town of Surfside) ($761.00 one-time), Multimodal Mobility Impact Fee (Miami-Dade County, Office) ($16.95/sq ft) and Fire and Emergency Services Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).

Water Tapping Charge (Town of Surfside) and Sewer Connection Charge (Town of Surfside) are set by the utility and not published online. Municipal Impact Fee (Town of Surfside, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Surfside Impact Fee Schedule
Water$761.00 one-time
  • Water and Sewer Development Fee (Town of Surfside)
    Town of Surfside
    The Town of Surfside provides water and sewer service. Its one-time water and sewer development fee is $761 per equivalent residential unit; a nonresidential account counts one unit for each 15 plumbing fixture units or part thereof, so the amount shown is the one-unit minimum. Paid when the first water, sewer, foundation or building permit is issued.
    $761.00 one-time
  • Water Tapping Charge (Town of Surfside)
    Town of Surfside
    The Town of Surfside sets a water tapping charge by resolution for new, enlarged or reduced water service, covering the tap and the service installation to the property line. No amount is published.
    Requires confirmation
Sewer$0.00
  • Sewer Connection Charge (Town of Surfside)
    Town of Surfside
    The Town of Surfside provides sewer service. Its combined water and sewer development fee is shown on the water row; no separate one-time sewer connection charge is published.
    Requires confirmation
City$0.00
County$17.37/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), which applies countywide, charged per gross square foot for a general office building of up to 50,000 sq ft, on the rate schedule in effect December 31, 2023 through December 30, 2027. Rates by parcel Context Zone: Zone 1 $17.610, Zone 2 $16.954, Zone 3 $18.607, Zone 4 $19.422 per sq ft; Surfside is in Zone 2. Larger office buildings pay lower rates by size bracket. A 2% administrative fee is added.
    $16.95/sq ft
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Miami-Dade County fire and emergency medical services impact fee, $0.4191 per square foot for office uses, on the rate schedule in effect December 31, 2024 through December 30, 2027. Surfside is served by the Miami-Dade Fire Rescue district, so the county fee applies.
    $0.42/sq ft
  • Police Services Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    The Miami-Dade County police services impact fee applies only in unincorporated Miami-Dade County, so it is not charged in Surfside.
    $0.00
Total (Surfside): $17.37/sq ft + $761.00 one-time (≈ $435,088.50 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Surfside Miami-Dade County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$507,970.00Includes unconfirmed feesAventura$580,707.25Includes unconfirmed feesBal Harbour$476,204.50Includes unconfirmed feesBay Harbor Islands$435,871.08Includes unconfirmed feesBiscayne Park$499,622.50Includes unconfirmed feesCoral Gables$569,630.00Cutler Bay$487,652.50Includes unconfirmed feesDoral$480,002.50El Portal$475,652.50Includes unconfirmed feesFlorida City$690,247.50Includes unconfirmed feesGolden Beach$543,902.50Includes unconfirmed feesHialeah$497,945.50Hialeah Gardens$475,652.50Includes unconfirmed feesHomestead$509,765.23Includes unconfirmed feesIndian Creek$434,327.50Includes unconfirmed feesKey Biscayne$423,850.00Medley$487,777.50Includes unconfirmed feesMiami$485,963.75Includes unconfirmed feesMiami Beach$553,324.00Miami Gardens$553,152.50Includes unconfirmed feesMiami Lakes$542,796.50Includes unconfirmed feesMiami Shores$434,327.50Includes unconfirmed feesMiami Springs$434,327.50Includes unconfirmed feesNorth Bay Village$443,224.53Includes unconfirmed feesNorth Miami$661,575.50Includes unconfirmed feesNorth Miami Beach$546,424.50Includes unconfirmed feesOpa-locka$486,590.50Includes unconfirmed feesPalmetto Bay$699,120.00Includes unconfirmed feesPinecrest$501,652.50Includes unconfirmed feesSouth Miami$475,652.50Includes unconfirmed feesSunny Isles Beach$587,077.50Includes unconfirmed fees
Surfside$435,088.50this pageIncludes unconfirmed fees
Sweetwater$565,502.50Includes unconfirmed feesVirginia Gardens$475,652.50Includes unconfirmed feesWest Miami$537,581.50Includes unconfirmed fees

Surfside Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Surfside Impact Fee FAQs

What are the total impact fees for a single-family home in Surfside, Florida?

A new single-family home in Surfside pays at least $13,011.55 per unit in combined impact fees (rates sourced October 21, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Surfside?

Commercial development in Surfside pays $12.10 per square foot in impact fees, plus $761.00 in one-time water and sewer connection fees, at least $605,821.00 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Surfside charge its own impact fees?

Yes. Surfside levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Surfside, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000