Medley impact fees by project type
Medley: Single-Family Impact Fees
A new single-family home in Medley pays at least $13,718.45 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $12,250.55 and municipal or utility fees for $1,467.90.
The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Sewer Connection Charge (Miami-Dade WASD) ($1,176.00).
Parks & Recreation Impact Fee (Town of Medley) and Police Impact Fee (Town of Medley) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD)$291.90Miami-Dade Water & Sewer Department (WASD)Medley buys wholesale water from WASD & maintains distribution; WASD connection charge $1.39/gal × 210 gpd = $291.90. Eff 10/1/2024.
- Sewer Connection Charge (Miami-Dade WASD)$1,176.00Miami-Dade Water & Sewer Department (WASD)Medley sewage delivered to WASD; WASD sewer connection charge $5.60/gal × 210 gpd = $1,176.00. Eff 10/1/2024.
- Parks & Recreation Impact Fee (Town of Medley)Requires confirmationTown of MedleySmall industrial town; municipal park impact fee not confirmed. VERIFY Town Hall 305-887-9541.
- Police Impact Fee (Town of Medley)Requires confirmationTown of MedleyMunicipal police impact fee not confirmed. VERIFY 305-887-9541.
- Road (Mobility) Impact Fee (Miami-Dade County)$9,275.00Miami-Dade CountyContext Zone 2 rep. Paid countywide. Eff 12/31/2023-12/30/2027.
- Educational Facilities (School) Impact Fee (Miami-Dade County)$2,448.00Miami-Dade County$612/unit + $0.918/gsf; modeled @2,000 gsf = $2,448. Countywide. Eff 12/31/2024.
- Fire-Rescue Impact Fee (Miami-Dade County)$527.55Miami-Dade County$527.55 flat. Medley served by county fire (no own dept). Eff 12/31/2024.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Medley: Multifamily Impact Fees
A new multifamily unit in Medley pays at least $6,548.20 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $5,604.55 and municipal or utility fees for $943.65.
The largest line items are Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF) ($4,465.00), Sewer Connection Charge (Miami-Dade WASD) (MF) ($756.00) and Educational Facilities (School) Impact Fee (Miami-Dade County) (MF) ($612.00).
Police Impact Fee (Town of Medley, MF) and Parks & Recreation Impact Fee (Town of Medley, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD) (MF)$187.65Miami-Dade Water & Sewer Department (WASD)Medley wholesale WASD. $1.39/gal × 135 gpd = $187.65. Eff 10/1/2024.
- Sewer Connection Charge (Miami-Dade WASD) (MF)$756.00Miami-Dade Water & Sewer Department (WASD)WASD $5.60/gal × 135 gpd = $756.00. Eff 10/1/2024.
- Police Impact Fee (Town of Medley, MF)Requires confirmationTown of MedleyMunicipal police impact fee not confirmed. VERIFY 305-887-9541.
- Parks & Recreation Impact Fee (Town of Medley, MF)Requires confirmationTown of MedleyMunicipal park impact fee not confirmed. VERIFY 305-887-9541.
- Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF)$4,465.00Miami-Dade CountyZone 2 Mid/High-Rise $4,465 (default tier). Countywide. Eff 12/31/2023.
- Educational Facilities (School) Impact Fee (Miami-Dade County) (MF)$612.00Miami-Dade County$612/unit base. Countywide. Eff 12/31/2024.
- Fire-Rescue Impact Fee (Miami-Dade County) (MF)$527.55Miami-Dade County$527.55 flat. Medley served by county fire. Eff 12/31/2024.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Medley: Commercial Impact Fees
Commercial development in Medley pays $13.23 per square foot in impact fees, plus $6,300.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $667,560.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Installation Charge (Town of Medley) — 1" meter ($2,900.00 one-time) and Fire-Rescue Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Road (Mobility) Impact Fee (Miami-Dade County, Commercial), Sewer Impact/Connection Fee (Town of Medley), and Water Impact/Connection Fee (Town of Medley) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Meter Installation Charge (Town of Medley) — 1" meter$2,900.00 one-timeTown of MedleyOne-time Water Installation Charge, COMMERCIAL ladder (complete installation with meter & labor) — a SEPARATE charge from the Water Impact/Connection Fee, both payable at connection. Canonical 1" nonres default tier. Commercial ladder: 5/8x3/4" $2,400 · 1" $2,900 · 1.5" $4,000 · 2" $5,000 · 2" compound $7,000 · larger than 2" = actual cost +46%, materials/machinery +50%. (Residential ladder is separate and lower: 5/8x3/4" $800, 1" $1,200.) A refundable Commercial Water Meter Deposit also applies (1" = $450) — refundable, so not entered. Source: Town Water & Sewer Billing Rates page.
- Water Impact/Connection Fee (Town of Medley)$1,000.00 one-timeRequires confirmationTown of MedleyMedley levies its OWN water impact/connection fee (the residential pass missed this and used the WASD retail charge instead). Published on the Town's Water & Sewer Billing Rates page under 'IMPACT/CONNECTIONS FEES': Water $1,000.00 MINIMUM, per Resolution C-1054, rates effective 10/1/2009. UNCONFIRMED: the figure is published only as a 'minimum' with NO published escalation formula, meter ladder or flow basis for larger nonres connections, and the rate has not been updated since 2009. Medley is a WHOLESALE customer of Miami-Dade WASD (buys treated water, maintains its own distribution and meters; sewage is delivered back to WASD) — it is NOT a WASD retail customer, so the WASD $1.39/gal nonres connection charge is not what a Medley developer pays. Call the Utilities Dept (305) 887-9541 ext. 103/104 to confirm the amount charged above the minimum. Meter installation is a SEPARATE charge — see the meter-ladder records.
- Sewer Impact/Connection Fee (Town of Medley)$2,400.00 one-timeRequires confirmationTown of MedleyMedley levies its OWN sewer impact/connection fee. Published on the Town's Water & Sewer Billing Rates page under 'IMPACT/CONNECTIONS FEES': Sewer $2,400.00 MINIMUM, per Resolution C-1054, rates effective 10/1/2009. UNCONFIRMED: published only as a 'minimum' with no escalation formula, meter ladder or flow basis for larger nonres connections, and unchanged since 2009. Sewage is conveyed to Miami-Dade WASD for treatment, but Medley bills the developer. Call Utilities (305) 887-9541 ext. 103/104.
- Municipal Impact Fee (Town of Medley, Commercial)$0.00Town of MedleyCONFIRMED $0 — the Town levies NO municipal impact fee. Proved two ways. (1) Complete Municode chapter list: Chs. 1, 2, 5, 8, 11, 14, 17, 20, 23, 26, 29, 30, 32, 35, 38, 41, 44, 47, 50, 53, 56, 62, 63 — no impact-fee chapter or article. Ch. 63 is SPECIAL ASSESSMENTS (benefit assessments, not development fees). (2) The Town's adopted Building & Zoning Fee Schedule (4-13-2022) was read end to end (Sections A–O): every line item is permit, plan-review, inspection, licensing or cost-recovery; the word 'impact' appears exactly ONCE, in Sec. J's disclaimer that base permit fees 'do not include local, administrative, impact or other fees' — no impact fee is scheduled. Sec. K land-development-order fees (Rezoning $3,500, LUP Amendment $5,000, Final Plat $3,840) are application cost recovery. This CONFIRMS the residential pass's 'VERIFY 305-887-9541' park and police placeholders. NOTE: Medley DOES levy W/S impact/connection fees — see the Water Sewer Fees table.
- Road (Mobility) Impact Fee (Miami-Dade County, Commercial)$12.66/sq ftRequires confirmationMiami-Dade CountyMultimodal Mobility Impact Fee, Code Ch. 33E (Ord. 23-68). Countywide incl. all municipalities. Schedule row: 'Shopping Plaza (40-150 kgsf) w/o Supermarket', Context Zone 3 ($12.661/sf). UNCONFIRMED — Medley is NOT named in any Sec. 33E-7.1 zone list. Zone 3 assigned because Medley is bounded by Doral (Zone 3, named) to the south/west and Hialeah Gardens (Zone 3, named) to the north; but it also abuts Hialeah (Zone 2, named), and the zones are metes-and-bounds/PARCEL-specific, not municipal. Zone 2 would be $11.537/sf. Zone 1 SMART-corridor overlay can also reach any parcel. Confirm the zone with County Zoning before quoting. Excludes 2% admin fee.
- Fire-Rescue Impact Fee (Miami-Dade County, Commercial)$0.56/sq ftMiami-Dade County Fire Rescue DistrictCode Sec. 33J-1(b): applies throughout the Fire Rescue District incl. all municipalities served by the district. Medley has no municipal fire department — MDFR serves it. Single rate per category (no zones).
- Police Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade CountyCONFIRMED $0. Code Sec. 33I-1(b) limits the county police impact fee to UNINCORPORATED Miami-Dade County. Medley has its own police department.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Medley: Industrial Impact Fees
Industrial development in Medley pays $6.93 per square foot in impact fees, plus $6,300.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $352,980.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Installation Charge (Town of Medley) — 1" meter ($2,900.00 one-time) and Fire-Rescue Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Road (Mobility) Impact Fee (Miami-Dade County, Industrial), Sewer Impact/Connection Fee (Town of Medley), and Water Impact/Connection Fee (Town of Medley) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Meter Installation Charge (Town of Medley) — 1" meter$2,900.00 one-timeTown of MedleyOne-time Water Installation Charge, COMMERCIAL ladder (complete installation with meter & labor) — a SEPARATE charge from the Water Impact/Connection Fee, both payable at connection. Canonical 1" nonres default tier. Commercial ladder: 5/8x3/4" $2,400 · 1" $2,900 · 1.5" $4,000 · 2" $5,000 · 2" compound $7,000 · larger than 2" = actual cost +46%, materials/machinery +50%. (Residential ladder is separate and lower: 5/8x3/4" $800, 1" $1,200.) A refundable Commercial Water Meter Deposit also applies (1" = $450) — refundable, so not entered. Source: Town Water & Sewer Billing Rates page.
- Water Impact/Connection Fee (Town of Medley)$1,000.00 one-timeRequires confirmationTown of MedleyMedley levies its OWN water impact/connection fee (the residential pass missed this and used the WASD retail charge instead). Published on the Town's Water & Sewer Billing Rates page under 'IMPACT/CONNECTIONS FEES': Water $1,000.00 MINIMUM, per Resolution C-1054, rates effective 10/1/2009. UNCONFIRMED: the figure is published only as a 'minimum' with NO published escalation formula, meter ladder or flow basis for larger nonres connections, and the rate has not been updated since 2009. Medley is a WHOLESALE customer of Miami-Dade WASD (buys treated water, maintains its own distribution and meters; sewage is delivered back to WASD) — it is NOT a WASD retail customer, so the WASD $1.39/gal nonres connection charge is not what a Medley developer pays. Call the Utilities Dept (305) 887-9541 ext. 103/104 to confirm the amount charged above the minimum. Meter installation is a SEPARATE charge — see the meter-ladder records.
- Sewer Impact/Connection Fee (Town of Medley)$2,400.00 one-timeRequires confirmationTown of MedleyMedley levies its OWN sewer impact/connection fee. Published on the Town's Water & Sewer Billing Rates page under 'IMPACT/CONNECTIONS FEES': Sewer $2,400.00 MINIMUM, per Resolution C-1054, rates effective 10/1/2009. UNCONFIRMED: published only as a 'minimum' with no escalation formula, meter ladder or flow basis for larger nonres connections, and unchanged since 2009. Sewage is conveyed to Miami-Dade WASD for treatment, but Medley bills the developer. Call Utilities (305) 887-9541 ext. 103/104.
- Municipal Impact Fee (Town of Medley, Industrial)$0.00Town of MedleyCONFIRMED $0 — no municipal impact fee, despite Medley being an overwhelmingly INDUSTRIAL town (warehouse/distribution is its dominant land use). Complete Municode chapter list has no impact-fee chapter; the adopted Building & Zoning Fee Schedule (4-13-2022, read end to end) schedules none. Medley's only development exactions are utility impact/connection fees (see Water Sewer Fees table).
- Road (Mobility) Impact Fee (Miami-Dade County, Industrial)$5.22/sq ftRequires confirmationMiami-Dade CountyCode Ch. 33E mobility fee. Schedule row: 'General Light Industrial', Context Zone 3 ($5.225/sf). UNCONFIRMED — Medley is not NAMED in Sec. 33E-7.1; Zone 3 assigned by adjacency to Doral and Hialeah Gardens (both named Zone 3). Zone 2 would be $4.760/sf. This is the county's most consequential rate for Medley: the town is overwhelmingly warehouse/light-industrial. Excludes 2% admin fee.
- Fire-Rescue Impact Fee (Miami-Dade County, Industrial)$1.71/sq ftMiami-Dade County Fire Rescue DistrictCode Sec. 33J-1(b): applies throughout the Fire Rescue District. Medley served by MDFR. Single rate per category. At $1.7086/sf this is the county's highest nonres fire rate and Medley is overwhelmingly light-industrial.
- Police Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade CountyCONFIRMED $0. Code Sec. 33I-1(b) limits the county police impact fee to unincorporated Miami-Dade County.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Medley: Office Impact Fees
Office development in Medley pays $19.03 per square foot in impact fees, plus $6,300.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to about $481,952.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Installation Charge (Town of Medley) — 1" meter ($2,900.00 one-time) and Fire-Rescue Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Road (Mobility) Impact Fee (Miami-Dade County, Office), Sewer Impact/Connection Fee (Town of Medley), and Water Impact/Connection Fee (Town of Medley) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the full fee schedule
- Water Meter Installation Charge (Town of Medley) — 1" meter$2,900.00 one-timeTown of MedleyOne-time Water Installation Charge, COMMERCIAL ladder (complete installation with meter & labor) — a SEPARATE charge from the Water Impact/Connection Fee, both payable at connection. Canonical 1" nonres default tier. Commercial ladder: 5/8x3/4" $2,400 · 1" $2,900 · 1.5" $4,000 · 2" $5,000 · 2" compound $7,000 · larger than 2" = actual cost +46%, materials/machinery +50%. (Residential ladder is separate and lower: 5/8x3/4" $800, 1" $1,200.) A refundable Commercial Water Meter Deposit also applies (1" = $450) — refundable, so not entered. Source: Town Water & Sewer Billing Rates page.
- Water Impact/Connection Fee (Town of Medley)$1,000.00 one-timeRequires confirmationTown of MedleyMedley levies its OWN water impact/connection fee (the residential pass missed this and used the WASD retail charge instead). Published on the Town's Water & Sewer Billing Rates page under 'IMPACT/CONNECTIONS FEES': Water $1,000.00 MINIMUM, per Resolution C-1054, rates effective 10/1/2009. UNCONFIRMED: the figure is published only as a 'minimum' with NO published escalation formula, meter ladder or flow basis for larger nonres connections, and the rate has not been updated since 2009. Medley is a WHOLESALE customer of Miami-Dade WASD (buys treated water, maintains its own distribution and meters; sewage is delivered back to WASD) — it is NOT a WASD retail customer, so the WASD $1.39/gal nonres connection charge is not what a Medley developer pays. Call the Utilities Dept (305) 887-9541 ext. 103/104 to confirm the amount charged above the minimum. Meter installation is a SEPARATE charge — see the meter-ladder records.
- Sewer Impact/Connection Fee (Town of Medley)$2,400.00 one-timeRequires confirmationTown of MedleyMedley levies its OWN sewer impact/connection fee. Published on the Town's Water & Sewer Billing Rates page under 'IMPACT/CONNECTIONS FEES': Sewer $2,400.00 MINIMUM, per Resolution C-1054, rates effective 10/1/2009. UNCONFIRMED: published only as a 'minimum' with no escalation formula, meter ladder or flow basis for larger nonres connections, and unchanged since 2009. Sewage is conveyed to Miami-Dade WASD for treatment, but Medley bills the developer. Call Utilities (305) 887-9541 ext. 103/104.
- Municipal Impact Fee (Town of Medley, Office)$0.00Town of MedleyCONFIRMED $0 — no municipal impact fee. Complete Municode chapter list has no impact-fee chapter, and the adopted Building & Zoning Fee Schedule (4-13-2022, Sections A–O read in full) schedules none. Medley's only development exactions are utility impact/connection fees (see Water Sewer Fees table).
- Road (Mobility) Impact Fee (Miami-Dade County, Office)$18.61/sq ftRequires confirmationMiami-Dade CountyCode Ch. 33E mobility fee. Schedule row: 'General Office, 1-50,000 gsf', Context Zone 3 ($18.607/sf). UNCONFIRMED — Medley is not NAMED in Sec. 33E-7.1; Zone 3 assigned by adjacency to Doral and Hialeah Gardens (both named Zone 3). Zone 2 would be $16.954/sf. Excludes 2% admin fee.
- Fire-Rescue Impact Fee (Miami-Dade County, Office)$0.42/sq ftMiami-Dade County Fire Rescue DistrictCode Sec. 33J-1(b): applies throughout the Fire Rescue District. Medley served by MDFR (no municipal FD). Single rate per category.
- Police Impact Fee (Miami-Dade County, Office)$0.00Miami-Dade CountyCONFIRMED $0. Code Sec. 33I-1(b) limits the county police impact fee to unincorporated Miami-Dade County.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Medley
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Medley, Florida?
A new single-family home in Medley pays at least $13,718.45 per unit in combined impact fees (rates sourced July 14, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Medley?
Commercial development in Medley pays $13.23 per square foot in impact fees, plus $6,300.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $667,560.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Medley charge its own impact fees?
Yes. Medley levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Medley, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.