IMPACTFEES.ORG

Miami Lakes, Florida Impact Fees

Miami Lakes applies its own fee schedule: municipal fees plus the Miami-Dade County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $17,866.55 per unit (rates sourced July 14, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Miami Lakes impact fees by project type

Miami Lakes: Single-Family Impact Fees

A new single-family home in Miami Lakes pays at least $17,866.55 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $16,398.65 and municipal or utility fees for $1,467.90.

The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Park Impact Fee (Miami-Dade County, collected for Miami Lakes) ($3,459.68) and Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00).

Municipal Impact Fee (Town of Miami Lakes) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$291.90
Sewer$1,176.00
City$0.00
  • Municipal Impact Fee (Town of Miami Lakes)
    Town of Miami Lakes
    Park & Police impact fees collected by Miami-Dade County for Miami Lakes. No separate municipal impact fee confirmed. VERIFY 305-364-6100.
    Requires confirmation
County$16,398.65
Total (Miami Lakes): $17,866.55
Sources last checked July 14, 2026Official fee schedules:Miami-Dade Water & Sewer Department (WASD) Town of Miami Lakes Miami-Dade County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$17,866.55Aventura$13,718.45Includes unconfirmed feesBal Harbour$13,718.45Includes unconfirmed feesBay Harbor Islands$13,718.45Includes unconfirmed feesBiscayne Park$13,718.45Includes unconfirmed feesCoral Gables$11,859.90Cutler Bay$13,718.45Includes unconfirmed feesDoral$13,718.45Includes unconfirmed feesEl Portal$13,718.45Includes unconfirmed feesFlorida City$12,250.55Includes unconfirmed feesGolden Beach$13,426.55Includes unconfirmed feesHialeah$13,190.90Includes unconfirmed feesHialeah Gardens$12,250.55Includes unconfirmed feesHomestead$12,250.55Includes unconfirmed feesIndian Creek$13,718.45Includes unconfirmed feesKey Biscayne$13,190.90Includes unconfirmed feesMedley$13,718.45Includes unconfirmed feesMiami$13,190.90Includes unconfirmed feesMiami Beach$13,190.90Includes unconfirmed feesMiami Gardens$13,718.45Includes unconfirmed fees
Miami Lakes$17,866.55this pageIncludes unconfirmed fees
Miami Shores$13,718.45Includes unconfirmed feesMiami Springs$13,718.45Includes unconfirmed feesNorth Bay Village$13,718.45Includes unconfirmed feesNorth Miami$21,979.55Includes unconfirmed feesNorth Miami Beach$15,041.45Includes unconfirmed feesOpa-locka$13,718.45Includes unconfirmed feesPalmetto Bay$17,866.55Includes unconfirmed feesPinecrest$13,718.45Includes unconfirmed feesSouth Miami$13,718.45Includes unconfirmed feesSunny Isles Beach$13,718.45Includes unconfirmed feesSurfside$13,718.45Includes unconfirmed feesSweetwater$13,718.45Includes unconfirmed feesVirginia Gardens$13,718.45Includes unconfirmed feesWest Miami$13,718.45Includes unconfirmed fees

Miami Lakes: Multifamily Impact Fees

A new multifamily unit in Miami Lakes pays at least $9,405.62 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $8,461.97 and municipal or utility fees for $943.65.

The largest line items are Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF) ($4,465.00), Park Impact Fee (Miami-Dade County, collected for Miami Lakes) (MF) ($2,169.00) and Sewer Connection Charge (Miami-Dade WASD) (MF) ($756.00).

Municipal Impact Fee (Town of Miami Lakes, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$187.65
Sewer$756.00
City$0.00
County$8,461.97
Total (Miami Lakes): $9,405.62
Sources last checked July 14, 2026Official fee schedules:Miami-Dade Water & Sewer Department (WASD) Town of Miami Lakes Miami-Dade County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$9,405.62Aventura$6,548.20Includes unconfirmed feesBal Harbour$6,548.20Includes unconfirmed feesBay Harbor Islands$6,548.20Includes unconfirmed feesBiscayne Park$6,548.20Includes unconfirmed feesCoral Gables$7,647.65Cutler Bay$6,548.20Includes unconfirmed feesDoral$6,548.20Includes unconfirmed feesEl Portal$6,548.20Includes unconfirmed feesFlorida City$5,604.55Includes unconfirmed feesGolden Beach$6,360.55Includes unconfirmed feesHialeah$6,020.65Includes unconfirmed feesHialeah Gardens$5,604.55Includes unconfirmed feesHomestead$5,604.55Includes unconfirmed feesIndian Creek$6,548.20Includes unconfirmed feesKey Biscayne$6,020.65Includes unconfirmed feesMedley$6,548.20Includes unconfirmed feesMiami$6,020.65Includes unconfirmed feesMiami Beach$6,020.65Includes unconfirmed feesMiami Gardens$6,548.20Includes unconfirmed fees
Miami Lakes$9,405.62this pageIncludes unconfirmed fees
Miami Shores$6,548.20Includes unconfirmed feesMiami Springs$6,548.20Includes unconfirmed feesNorth Bay Village$6,548.20Includes unconfirmed feesNorth Miami$15,778.55Includes unconfirmed feesNorth Miami Beach$7,398.70Includes unconfirmed feesOpa-locka$6,548.20Includes unconfirmed feesPalmetto Bay$9,405.62Includes unconfirmed feesPinecrest$6,548.20Includes unconfirmed feesSouth Miami$6,548.20Includes unconfirmed feesSunny Isles Beach$6,548.20Includes unconfirmed feesSurfside$6,548.20Includes unconfirmed feesSweetwater$6,548.20Includes unconfirmed feesVirginia Gardens$6,548.20Includes unconfirmed feesWest Miami$6,548.20Includes unconfirmed fees

Miami Lakes: Commercial Impact Fees

Commercial development in Miami Lakes pays $30.29 per square foot in impact fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $1,514,283.50. The calculator below adjusts to your exact square footage.

The largest line items are Mobility Fee (Town of Miami Lakes, Commercial) — 61.64 trips/1,000 sf × 1.321 auto occupancy × $209.52/person-trip ($17.06/sq ft) and Fire-Rescue Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Charge (Miami-Dade WASD) and Sewer Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Water Fees and Charges, eff. 10/1/2025, item 9: 'Connection Charge Rate - Per average daily gallon $1.39'. NO meter ladder; nonres average daily gallonage assigned by land use under County Code Sec. 24-43.1(5) (WASD Table 1). The TOWN levies no water fee of any kind: Town Code Ch. 41 'Utilities' contains only Art. II Stormwater Utility (Secs. 41-19 to 41-25) and reserved sections - it has no water or sewer utility.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Wastewater Fees and Charges, eff. 10/1/2025, item 4: 'Connection Charge Rate - Per average daily gallon $5.60' ($2.80/gal with a graywater disposal system). NO meter ladder; nonres gpd assigned by land use under County Code Sec. 24-43.1(5). Town Code Ch. 41 has no sewer utility - the Town levies no sewer connection or capacity fee.
    Contact jurisdiction/utility to verify
City$17.06/sq ft
  • Mobility Fee (Town of Miami Lakes, Commercial) — 61.64 trips/1,000 sf × 1.321 auto occupancy × $209.52/person-trip
    Town of Miami Lakes
    Town LDC Ch. 13, Art. X, Div. 2 (Secs. 13-2002 to 13-2013), Ord. 16-192 (4/25/2016), am. Ord. 20-260 (4/21/2020). The Town publishes NO dollar-per-sf rate - the fee is a formula: units x Flat Trip Chart rate x mean auto occupancy x rate per daily person-trip. Components, all adopted: Flat Trip Chart Sec. 13-2005(b)(1) 'Commercial-Retail (per 1,000 sf or portion thereof) .....61.64'; mean auto occupancy for Retail = 1.321 (Res. 16-1386 Exh. A); rate per daily person-trip = $209.52 (Res. 20-1669, adopted 4/21/2020, 'effective immediately upon adoption'). 61.64 x 1.321 x $209.52 = $17,060.47 per 1,000 sf. Chart has NO GFA tiers - one Commercial-Retail row covers all sizes. No indexing; Sec. 13-2006(a) requires Council review at least every 3 years (rate unchanged since 2020). Town may retain up to 5% as admin, taken OUT of the fee. The Town levies NO other impact fee (Municode phrase search 'impact fee' = 0 hits code-wide). Credit/stacking interaction with the county mobility fee is not addressed in the LDC - Town Planning (305) 364-6100.
    $17.06/sq ft
County$13.23/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Code Ch. 33E; countywide incl. all municipalities (Sec. 33E-2(c)); STACKS with the Town's own mobility fee (Sec. 33E-2(e) permits non-duplicative municipal fees; the Town's LDC provides no county-fee credit). Context Zone 3 (Middle Ring) DERIVED from the Sec. 33E-7.1 metes-and-bounds: Miami Lakes (NW 138th-170th St, ~NW 67th-87th Ave) lies NORTH of the Zone 2 point of beginning (SR 826 x NW 138th St) and far east of the L-33/L-30 canals bounding Zone 4. Ordinance does NOT name Miami Lakes. Schedule row: 'Shopping Plaza (40-150 kgsf) w/o Supermarket' Zone 3 = $12.661/sf (Z1 $11.982 / Z2 $11.537 / Z4 $13.216). Eff. 12/31/2023-12/30/2027; excl. 2% admin fee. UNCONFIRMED - Zone 1 SMART-corridor overlay is parcel-specific. (786) 315-2670.
    $12.66/sq ftRequires confirmation
  • Fire-Rescue Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Code Sec. 33J-1(b) - applies throughout the Miami-Dade Fire Rescue District incl. all municipalities served by it. Miami Lakes has no municipal FD and is served by MDFR (County Impact Fees page names only Miami, Miami Beach, Hialeah, Coral Gables, Key Biscayne as exceptions). Commercial $0.5642/sf. Eff. 12/31/2024-12/30/2027.
    $0.56/sq ft
  • Police Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    $0 CONFIRMED. Code Sec. 33I-1(b) makes the Police Services Impact Fee 'applicable to all land development in unincorporated Miami-Dade County' - it reaches no municipality, including the two towns (Miami Lakes and Palmetto Bay) for which the County administratively COLLECTS park and police fees. The county rate schedule prints $0.4777/sf nonres, but only for the unincorporated area.
    $0.00
Total (Miami Lakes): $30.29/sq ft (≈ $1,514,283.50 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Miami-Dade Water and Sewer Department (WASD) Town of Miami Lakes Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$685,145.00Includes unconfirmed feesAventura$661,260.00Includes unconfirmed feesBal Harbour$661,812.00Includes unconfirmed feesBay Harbor Islands$606,360.00Includes unconfirmed feesBiscayne Park$662,135.00Includes unconfirmed feesCoral Gables$810,570.00Cutler Bay$697,760.00Includes unconfirmed feesDoral$669,960.00El Portal$661,260.00Includes unconfirmed feesFlorida City$953,330.00Includes unconfirmed feesGolden Beach$661,260.00Includes unconfirmed feesHialeah$675,201.50Hialeah Gardens$661,260.00Includes unconfirmed feesHomestead$714,669.56Includes unconfirmed feesIndian Creek$605,060.00Includes unconfirmed feesKey Biscayne$576,850.00Medley$667,560.00Includes unconfirmed feesMiami$836,040.00Includes unconfirmed feesMiami Beach$1,253,000.00Miami Gardens$816,260.00Includes unconfirmed fees
Miami Lakes$1,514,283.50this pageIncludes unconfirmed fees
Miami Shores$605,060.00Includes unconfirmed feesMiami Springs$605,060.00Includes unconfirmed feesNorth Bay Village$606,982.03Includes unconfirmed feesNorth Miami$1,001,308.00Includes unconfirmed feesNorth Miami Beach$808,323.00Includes unconfirmed feesOpa-locka$729,448.00Includes unconfirmed feesPalmetto Bay$948,310.00Includes unconfirmed feesPinecrest$661,260.00Includes unconfirmed feesSouth Miami$661,260.00Includes unconfirmed feesSunny Isles Beach$929,410.00Includes unconfirmed feesSurfside$605,060.00Includes unconfirmed feesSweetwater$877,110.00Includes unconfirmed feesVirginia Gardens$661,260.00Includes unconfirmed feesWest Miami$661,260.00Includes unconfirmed fees

Miami Lakes: Industrial Impact Fees

Industrial development in Miami Lakes pays $7.37 per square foot in impact fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $368,670.00. The calculator below adjusts to your exact square footage.

The largest line items are Fire-Rescue Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft) and Mobility Fee (Town of Miami Lakes, Industrial) — 1.94 trips/1,000 sf × 1.082 auto occupancy × $209.52/person-trip ($0.44/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Charge (Miami-Dade WASD) and Sewer Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Water Fees and Charges, eff. 10/1/2025, item 9: 'Connection Charge Rate - Per average daily gallon $1.39'. NO meter ladder; nonres average daily gallonage assigned by land use under County Code Sec. 24-43.1(5) (WASD Table 1). The TOWN levies no water fee of any kind: Town Code Ch. 41 'Utilities' contains only Art. II Stormwater Utility (Secs. 41-19 to 41-25) and reserved sections - it has no water or sewer utility.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Wastewater Fees and Charges, eff. 10/1/2025, item 4: 'Connection Charge Rate - Per average daily gallon $5.60' ($2.80/gal with a graywater disposal system). NO meter ladder; nonres gpd assigned by land use under County Code Sec. 24-43.1(5). Town Code Ch. 41 has no sewer utility - the Town levies no sewer connection or capacity fee.
    Contact jurisdiction/utility to verify
City$0.44/sq ft
County$6.93/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Code Ch. 33E; countywide; stacks with the Town's own mobility fee. Context Zone 3 DERIVED from Sec. 33E-7.1 (town not named). Schedule row: 'General Light Industrial' Zone 3 = $5.225/sf; Warehousing is a separate row ($1.846 Zone 3). Eff. 12/31/2023-12/30/2027; excl. 2% admin fee. UNCONFIRMED - Zone 1 SMART-corridor overlay is parcel-specific.
    $5.22/sq ftRequires confirmation
  • Fire-Rescue Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Code Sec. 33J-1(b); Miami Lakes is inside the MDFR District. Industrial $1.7086/sf. Eff. 12/31/2024-12/30/2027.
    $1.71/sq ft
  • Police Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    $0 CONFIRMED. Sec. 33I-1(b) - unincorporated only. ALSO: the County collects a PARK impact fee on behalf of Miami Lakes under an interlocal, but the county Park schedule (Ch. 33H) has NO nonresidential rate rows at all - every nonres row's PARKS and SCHOOL cells are blank. So nonres park fee = $0 and no record is entered for it.
    $0.00
Total (Miami Lakes): $7.37/sq ft (≈ $368,670.00 at 50,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Miami-Dade Water and Sewer Department (WASD) Town of Miami Lakes Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$370,565.00Includes unconfirmed feesAventura$346,680.00Includes unconfirmed feesBal Harbour$347,232.00Includes unconfirmed feesBay Harbor Islands$324,730.00Includes unconfirmed feesBiscayne Park$347,555.00Includes unconfirmed feesCoral Gables$326,620.00Cutler Bay$366,680.00Includes unconfirmed feesDoral$355,380.00El Portal$346,680.00Includes unconfirmed feesFlorida City$467,140.00Includes unconfirmed feesGolden Beach$346,680.00Includes unconfirmed feesHialeah$313,199.00Hialeah Gardens$346,680.00Includes unconfirmed feesHomestead$383,739.56Includes unconfirmed feesIndian Creek$323,430.00Includes unconfirmed feesKey Biscayne$238,000.00Medley$352,980.00Includes unconfirmed feesMiami$282,670.00Includes unconfirmed feesMiami Beach$349,150.00Miami Gardens$501,680.00Includes unconfirmed fees
Miami Lakes$368,670.00this pageIncludes unconfirmed fees
Miami Shores$323,430.00Includes unconfirmed feesMiami Springs$323,430.00Includes unconfirmed feesNorth Bay Village$325,352.03Includes unconfirmed feesNorth Miami$488,778.00Includes unconfirmed feesNorth Miami Beach$485,583.00Includes unconfirmed feesOpa-locka$375,018.00Includes unconfirmed feesPalmetto Bay$466,430.00Includes unconfirmed feesPinecrest$346,680.00Includes unconfirmed feesSouth Miami$346,680.00Includes unconfirmed feesSunny Isles Beach$483,180.00Includes unconfirmed feesSurfside$323,430.00Includes unconfirmed feesSweetwater$408,580.00Includes unconfirmed feesVirginia Gardens$346,680.00Includes unconfirmed feesWest Miami$346,680.00Includes unconfirmed fees

Miami Lakes: Office Impact Fees

Office development in Miami Lakes pays $21.23 per square foot in impact fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to at least $530,854.00. The calculator below adjusts to your exact square footage.

The largest line items are Mobility Fee (Town of Miami Lakes, Office) — 9.74 trips/1,000 sf × 1.082 auto occupancy × $209.52/person-trip ($2.21/sq ft) and Fire-Rescue Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection Charge (Miami-Dade WASD) and Sewer Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Water Fees and Charges, eff. 10/1/2025, item 9: 'Connection Charge Rate - Per average daily gallon $1.39'. NO meter ladder; nonres average daily gallonage assigned by land use under County Code Sec. 24-43.1(5) (WASD Table 1). The TOWN levies no water fee of any kind: Town Code Ch. 41 'Utilities' contains only Art. II Stormwater Utility (Secs. 41-19 to 41-25) and reserved sections - it has no water or sewer utility.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Wastewater Fees and Charges, eff. 10/1/2025, item 4: 'Connection Charge Rate - Per average daily gallon $5.60' ($2.80/gal with a graywater disposal system). NO meter ladder; nonres gpd assigned by land use under County Code Sec. 24-43.1(5). Town Code Ch. 41 has no sewer utility - the Town levies no sewer connection or capacity fee.
    Contact jurisdiction/utility to verify
City$2.21/sq ft
County$19.03/sq ft
Total (Miami Lakes): $21.23/sq ft (≈ $530,854.00 at 25,000 sq ft)
Sources last checked July 14, 2026Official fee schedules:Miami-Dade Water and Sewer Department (WASD) Town of Miami Lakes Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$487,595.00Includes unconfirmed feesAventura$475,652.50Includes unconfirmed feesBal Harbour$476,204.50Includes unconfirmed feesBay Harbor Islands$435,627.50Includes unconfirmed feesBiscayne Park$476,527.50Includes unconfirmed feesCoral Gables$569,620.00Cutler Bay$487,652.50Includes unconfirmed feesDoral$480,002.50El Portal$475,652.50Includes unconfirmed feesFlorida City$690,247.50Includes unconfirmed feesGolden Beach$475,652.50Includes unconfirmed feesHialeah$493,483.00Hialeah Gardens$475,652.50Includes unconfirmed feesHomestead$509,687.06Includes unconfirmed feesIndian Creek$434,327.50Includes unconfirmed feesKey Biscayne$423,850.00Medley$481,952.50Includes unconfirmed feesMiami$485,405.00Includes unconfirmed feesMiami Beach$543,500.00Miami Gardens$553,152.50Includes unconfirmed fees
Miami Lakes$530,854.00this pageIncludes unconfirmed fees
Miami Shores$434,327.50Includes unconfirmed feesMiami Springs$434,327.50Includes unconfirmed feesNorth Bay Village$436,249.53Includes unconfirmed feesNorth Miami$648,200.50Includes unconfirmed feesNorth Miami Beach$546,424.50Includes unconfirmed feesOpa-locka$486,590.50Includes unconfirmed feesPalmetto Bay$687,177.50Includes unconfirmed feesPinecrest$475,652.50Includes unconfirmed feesSouth Miami$475,652.50Includes unconfirmed feesSunny Isles Beach$570,427.50Includes unconfirmed feesSurfside$434,327.50Includes unconfirmed feesSweetwater$565,502.50Includes unconfirmed feesVirginia Gardens$475,652.50Includes unconfirmed feesWest Miami$475,652.50Includes unconfirmed fees

Estimate your project in Miami Lakes

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Miami Lakes, Florida?

A new single-family home in Miami Lakes pays at least $17,866.55 per unit in combined impact fees (rates sourced July 14, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Miami Lakes?

Commercial development in Miami Lakes pays $30.29 per square foot in impact fees, at least $1,514,283.50 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Miami Lakes charge its own impact fees?

Yes. Miami Lakes levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Miami Lakes, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000