Bay Harbor Islands impact fees by project type
Bay Harbor Islands: Single-Family Impact Fees
A new single-family home in Bay Harbor Islands pays at least $13,718.45 per unit in impact fees (rates sourced July 24, 2026). Of that, Miami-Dade County-levied fees account for $12,250.55 and municipal or utility fees for $1,467.90.
The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Sewer Connection Charge (Miami-Dade WASD) ($1,176.00).
Parks & Recreation Impact Fee (Town of Bay Harbor Islands) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Bay Harbor Islands impact fee schedule
- Water Connection Charge (Miami-Dade WASD)$291.90Miami-Dade Water & Sewer Dept (WASD)
- Sewer Connection Charge (Miami-Dade WASD)$1,176.00Miami-Dade Water & Sewer Dept (WASD)
- Police Impact Fee (Town of Bay Harbor Islands)$0.00Town of Bay Harbor IslandsThe Town of Bay Harbor Islands does not charge a municipal police impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Parks & Recreation Impact Fee (Town of Bay Harbor Islands)Requires confirmationTown of Bay Harbor Islands
- Road (Mobility) Impact Fee (Miami-Dade County)$9,275.00Miami-Dade County
- Educational Facilities (School) Impact Fee (Miami-Dade County)$2,448.00Miami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County)$527.55Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bay Harbor Islands: Multifamily Impact Fees
A new multifamily unit in Bay Harbor Islands pays at least $7,466.20 per unit in impact fees (rates sourced July 24, 2026). Of that, Miami-Dade County-levied fees account for $6,522.55 and municipal or utility fees for $943.65.
The largest line items are Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF) ($4,465.00), Educational Facilities (School) Impact Fee (Miami-Dade County, MF) ($1,530.00) and Sewer Connection Charge (Miami-Dade WASD) (MF) ($756.00).
Parks & Recreation Impact Fee (Town of Bay Harbor Islands, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Bay Harbor Islands impact fee schedule
- Water Connection Charge (Miami-Dade WASD) (MF)$187.65Miami-Dade Water & Sewer Dept (WASD)
- Sewer Connection Charge (Miami-Dade WASD) (MF)$756.00Miami-Dade Water & Sewer Dept (WASD)
- Police Impact Fee (Town of Bay Harbor Islands, MF)$0.00Town of Bay Harbor IslandsThe Town of Bay Harbor Islands does not charge a municipal police impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Parks & Recreation Impact Fee (Town of Bay Harbor Islands, MF)Requires confirmationTown of Bay Harbor Islands
- Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF)$4,465.00Mid/High-Rise (3+ stories)Miami-Dade County
- Educational Facilities (School) Impact Fee (Miami-Dade County, MF)$1,530.00Miami-Dade CountyMiami-Dade County educational facilities (school) impact fee, charged countywide including all municipalities. $612 per unit plus $0.918 per sq ft; shown here for a 1,000 sq ft unit ($1,530). Current schedule effective 12/31/2024 through 12/30/2027.
- Fire-Rescue Impact Fee (Miami-Dade County, MF)$527.55Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bay Harbor Islands: Commercial Impact Fees
Commercial development in Bay Harbor Islands pays $12.10 per square foot in impact fees, plus $1,300.00 in one-time water and sewer connection fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to about $606,360.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tapping Charge (Town of Bay Harbor Islands) — commercial service connection ($650.00 one-time), Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) ($11.54/sq ft) and Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).
Water Impact Fee (Town of Bay Harbor Islands) — nonresidential per unit is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Bay Harbor Islands impact fee schedule
- Water Impact Fee (Town of Bay Harbor Islands) — nonresidential per unit$650.00 one-timeRequires confirmationTown of Bay Harbor IslandsWater impact fee published by the Town of Bay Harbor Islands at $650 per unit for nonresidential connections. Separate meter installation costs also apply.
- Sewer Tapping Charge (Town of Bay Harbor Islands) — commercial service connection$650.00 one-timeTown of Bay Harbor IslandsThe Town of Bay Harbor Islands charges a $650 sewer tapping charge per nonresidential/commercial service connection, collected with the building permit. A Miami-Dade County surcharge also applies.
- Municipal Impact Fee (Town of Bay Harbor Islands, Commercial)$0.00Town of Bay Harbor Islands
- Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)$11.54/sq ftMiami-Dade County
- $0.56/sq ft
- Police Services Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bay Harbor Islands: Industrial Impact Fees
Industrial development in Bay Harbor Islands pays $6.47 per square foot in impact fees, plus $1,300.00 in one-time water and sewer connection fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to about $324,730.00. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tapping Charge (Town of Bay Harbor Islands) — commercial service connection ($650.00 one-time), Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) ($4.76/sq ft) and Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft).
Water Impact Fee (Town of Bay Harbor Islands) — nonresidential per unit is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Bay Harbor Islands impact fee schedule
- Water Impact Fee (Town of Bay Harbor Islands) — nonresidential per unit$650.00 one-timeRequires confirmationTown of Bay Harbor IslandsWater impact fee published by the Town of Bay Harbor Islands at $650 per unit for nonresidential connections. Separate meter installation costs also apply.
- Sewer Tapping Charge (Town of Bay Harbor Islands) — commercial service connection$650.00 one-timeTown of Bay Harbor IslandsThe Town of Bay Harbor Islands charges a $650 sewer tapping charge per nonresidential/commercial service connection, collected with the building permit. A Miami-Dade County surcharge also applies.
- Municipal Impact Fee (Town of Bay Harbor Islands, Industrial)$0.00Town of Bay Harbor Islands
- Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)$4.76/sq ftMiami-Dade County
- $1.71/sq ft
- Police Services Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bay Harbor Islands: Office Impact Fees
Office development in Bay Harbor Islands pays $17.37 per square foot in impact fees, plus $1,300.00 in one-time water and sewer connection fees (rates sourced July 24, 2026).
For a 25,000 sq ft building, that comes to about $435,627.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tapping Charge (Town of Bay Harbor Islands) — commercial service connection ($650.00 one-time), Multimodal Mobility Impact Fee (Miami-Dade County, Office) ($16.95/sq ft) and Fire and Emergency Services Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).
Water Impact Fee (Town of Bay Harbor Islands) — nonresidential per unit is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full Bay Harbor Islands impact fee schedule
- Water Impact Fee (Town of Bay Harbor Islands) — nonresidential per unit$650.00 one-timeRequires confirmationTown of Bay Harbor IslandsWater impact fee published by the Town of Bay Harbor Islands at $650 per unit for nonresidential connections. Separate meter installation costs also apply.
- Sewer Tapping Charge (Town of Bay Harbor Islands) — commercial service connection$650.00 one-timeTown of Bay Harbor IslandsThe Town of Bay Harbor Islands charges a $650 sewer tapping charge per nonresidential/commercial service connection, collected with the building permit. A Miami-Dade County surcharge also applies.
- Municipal Impact Fee (Town of Bay Harbor Islands, Office)$0.00Town of Bay Harbor Islands
- Multimodal Mobility Impact Fee (Miami-Dade County, Office)$16.95/sq ftMiami-Dade County
- Fire and Emergency Services Impact Fee (Miami-Dade County, Office)$0.42/sq ftMiami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Bay Harbor Islands impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Bay Harbor Islands impact fee FAQs
What are the total impact fees for a single-family home in Bay Harbor Islands, Florida?
A new single-family home in Bay Harbor Islands pays at least $13,718.45 per unit in combined impact fees (rates sourced July 24, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Bay Harbor Islands?
Commercial development in Bay Harbor Islands pays $12.10 per square foot in impact fees, plus $1,300.00 in one-time water and sewer connection fees, about $606,360.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Bay Harbor Islands charge its own impact fees?
Yes. Bay Harbor Islands levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Bay Harbor Islands, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.