Sweetwater applies its own fee schedule: municipal fees plus the Miami-Dade County-levied fees that apply inside city limits. Combined, a new single-family home pays $19,557.45 per unit (rates sourced ). The full breakdown is below.

Sweetwater Impact Fees by Project Type

Sweetwater: Single-Family Impact Fees

A new single-family home in Sweetwater pays $19,557.45 per unit in impact fees (rates sourced October 21, 2026). Of that, Miami-Dade County-levied fees account for $11,723.00 and municipal or utility fees for $7,834.45.

The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Transportation Impact Fee (City of Sweetwater) ($2,312.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Sweetwater Impact Fee Schedule
Water$291.90
  • Water Connection Charge (Miami-Dade WASD)
    Under 3,001 sq ft (210 gpd)
    Miami-Dade Water & Sewer Dept
    Water service here is provided by the Miami-Dade Water and Sewer Department (WASD). Its connection charge is $1.39 per average daily gallon (unchanged in the schedule effective October 1, 2026), applied to the County Code flow table for the home's total floor area: 210 gallons per day under 3,001 sq ft (shown), 310 for 3,001 to 5,000 sq ft, 510 over 5,000 sq ft. Meter installation is billed separately.
    $291.90
Sewer$1,176.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Under 3,001 sq ft (210 gpd)
    Miami-Dade Water & Sewer Dept
    Sewer service here is provided by the Miami-Dade Water and Sewer Department (WASD). Its wastewater connection charge is $5.60 per average daily gallon (unchanged in the schedule effective October 1, 2026), applied to the County Code flow table for the home's total floor area: 210 gallons per day under 3,001 sq ft (shown), 310 for 3,001 to 5,000 sq ft, 510 over 5,000 sq ft. Homes on septic systems do not pay it.
    $1,176.00
City$5,839.00
  • Transportation Impact Fee (City of Sweetwater)
    City of Sweetwater
    City of Sweetwater transportation impact fee, $2,312 per single-family dwelling (detached or attached), paid at building permit; payment can be deferred to the temporary certificate of occupancy. Charged in addition to the Miami-Dade County mobility fee.
    $2,312.00
  • Parks & Recreation Impact Fee (City of Sweetwater)
    City of Sweetwater
    Sweetwater charges a parks impact fee of $2,262 for a new single-family home and $1,987 per new multifamily unit, collected by the city with the building permit.
    $2,262.00
  • General Government Impact Fee (City of Sweetwater)
    City of Sweetwater
    City of Sweetwater general government impact fee, which also funds police facilities, $1,265 per single-family dwelling, paid at building permit.
    $1,265.00
  • Police Impact Fee (City of Sweetwater)
    City of Sweetwater
    Sweetwater does not charge a separate police impact fee. Police facilities are instead funded through the city's combined general government impact fee.
    $0.00
County$12,250.55
  • Road (Mobility) Impact Fee (Miami-Dade County)
    Miami-Dade County
    This road (mobility) impact fee is paid countywide to Miami-Dade County. The rate varies by the geographic Context Zone assigned to each parcel; the amount shown is the lowest-zone (Zone 2) rate for a detached single-family home, and parcels in higher zones pay more. A separate 2% administrative charge applies on top of the base. The current schedule runs through the end of 2027.
    $9,275.00
  • Educational Facilities (School) Impact Fee (Miami-Dade County)
    Miami-Dade County Public Schools
    This educational-facilities (school) impact fee is charged countywide by Miami-Dade County, including within municipalities. It is calculated as $612 per unit plus $0.918 per gross square foot (capped at 3,800 sq ft); the amount shown is for a 2,000 sq ft single-family house. The current schedule runs through the end of 2027.
    $2,448.00
  • Fire-Rescue Impact Fee (Miami-Dade County)
    Miami-Dade Fire Rescue
    This fire-rescue impact fee is collected by Miami-Dade County in areas served by Miami-Dade Fire Rescue, which includes this jurisdiction; the amount shown is the current per-unit rate. It does not apply in the municipalities that operate their own fire departments (Miami, Miami Beach, Hialeah, Coral Gables, and Key Biscayne). The current schedule runs through the end of 2027.
    $527.55
Total (Sweetwater): $19,557.45

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sweetwater: Multifamily Impact Fees

A new multifamily unit in Sweetwater pays $12,295.20 per unit in impact fees (rates sourced October 21, 2026). Of that, Miami-Dade County-levied fees account for $5,995.00 and municipal or utility fees for $6,300.20.

The largest line items are Road (Mobility) Impact Fee (Miami-Dade County, MF Mid/High-Rise) ($4,465.00), Parks & Recreation Impact Fee (City of Sweetwater, MF) ($1,987.00) and Transportation Impact Fee (City of Sweetwater, MF) ($1,665.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Sweetwater Impact Fee Schedule
Water$187.65
  • Water Connection Charge (Miami-Dade WASD, MF)
    Miami-Dade Water & Sewer Dept
    Water service in this area is provided by the Miami-Dade Water and Sewer Department (WASD), whose water connection charge is $1.39 per average daily gallon (effective October 1, 2024). The amount shown reflects the standard multifamily demand of 135 gallons per day per unit.
    $187.65
Sewer$756.00
  • Sewer Connection Charge (Miami-Dade WASD, MF)
    Miami-Dade Water & Sewer Dept
    Sewer service in this area is provided by the Miami-Dade Water and Sewer Department (WASD), whose wastewater connection charge is $5.60 per average daily gallon (effective October 1, 2024). The amount shown reflects the standard multifamily demand of 135 gallons per day per unit.
    $756.00
City$4,829.00
County$6,522.55
  • Road (Mobility) Impact Fee (Miami-Dade County, MF Mid/High-Rise)
    Mid/High-Rise (3+ stories)
    Miami-Dade County
    This road (mobility) impact fee is paid countywide to Miami-Dade County. It applies to mid- and high-rise multifamily buildings (3 or more stories), and the rate varies by the Context Zone assigned to each parcel; the amount shown is the lowest-zone (Zone 2) rate, and parcels in higher zones pay more. A separate 2% administrative charge applies on top of the base. The current schedule runs through the end of 2027.
    $4,465.00
  • Educational Facilities (School) Impact Fee (Miami-Dade County, MF)
    Miami-Dade County Public Schools
    Miami-Dade County educational facilities (school) impact fee, charged countywide including all municipalities. $612 per unit plus $0.918 per sq ft; shown here for a 1,000 sq ft unit ($1,530). Current schedule effective 12/31/2024 through 12/30/2027.
    $1,530.00
  • Fire-Rescue Impact Fee (Miami-Dade County, MF)
    Miami-Dade Fire Rescue
    This fire-rescue impact fee is collected by Miami-Dade County in areas served by Miami-Dade Fire Rescue, which includes this jurisdiction; the amount shown is the current per-unit rate. It does not apply in the municipalities that operate their own fire departments (Miami, Miami Beach, Hialeah, Coral Gables, and Key Biscayne). The current schedule runs through the end of 2027.
    $527.55
Total (Sweetwater): $12,295.20

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Sweetwater: Commercial Impact Fees

Commercial development in Sweetwater pays $17.54 per square foot in impact fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $877,110.00. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Sweetwater, Commercial) ($3.21/sq ft), General Government Impact Fee (City of Sweetwater, Commercial) ($1.10/sq ft) and Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Charge (Miami-Dade WASD) and Water Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Sweetwater Impact Fee Schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Water service in Sweetwater is retail from Miami-Dade WASD. The one-time nonresidential water connection charge is $1.39 per average daily gallon of estimated demand, with the gallonage assigned by land use under the county's daily rated gallonage schedule; WASD sets no nonresidential meter-size ladder. Rate in the WASD schedule effective October 1, 2026 (unchanged from the prior year).
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Sewer service in Sweetwater is retail from Miami-Dade WASD. The one-time nonresidential wastewater connection charge is $5.60 per average daily gallon of estimated demand ($2.80 for a customer with an approved graywater disposal system), with the gallonage assigned by land use under the county's daily rated gallonage schedule; WASD sets no nonresidential meter-size ladder. Rate in the WASD schedule effective October 1, 2026 (unchanged from the prior year).
    Contact jurisdiction/utility to verify
City$4.32/sq ft
  • Transportation Impact Fee (City of Sweetwater, Commercial)
    City of Sweetwater
    Sweetwater transportation impact fee, $3,214 per 1,000 square feet of gross floor area for the Retail/Commercial land use, adopted by Ordinance 5128 (October 23, 2024) and amended by Ordinance 5212 (November 3, 2025). Fees are assessed on the principal use of the building, and shopping centers pay the retail rate regardless of tenants. Paid at building permit issuance; collection may be deferred to the temporary certificate of occupancy.
    $3.21/sq ft
  • General Government Impact Fee (City of Sweetwater, Commercial)
    City of Sweetwater
    Sweetwater general government impact fee (it also funds police facilities), $1,103 per 1,000 square feet of gross floor area for the Retail/Commercial land use, adopted by Ordinance 5128 (October 23, 2024) and amended by Ordinance 5212 (November 3, 2025). Fees are assessed on the principal use of the building. Paid at building permit issuance; collection may be deferred to the temporary certificate of occupancy.
    $1.10/sq ft
County$13.23/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), which applies countywide, charged per gross square foot for a shopping plaza of 40,000 to 150,000 sq ft without a supermarket, on the rate schedule in effect December 31, 2023 through December 30, 2027. Rates by parcel Context Zone: Zone 1 $11.982, Zone 2 $11.537, Zone 3 $12.661, Zone 4 $13.216 per sq ft; the amount shown is the Zone 3 rate. A 2% administrative fee is added.
    $12.66/sq ftRequires confirmation
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Miami-Dade County fire and emergency medical services impact fee, $0.5642 per square foot for retail and commercial uses, on the rate schedule in effect December 31, 2024 through December 30, 2027. Sweetwater is served by the Miami-Dade Fire Rescue district, so the county fee applies.
    $0.56/sq ft
  • Police Services Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    The Miami-Dade County police services impact fee applies only in unincorporated Miami-Dade County, so it is not charged in Sweetwater.
    $0.00
Total (Sweetwater): $17.54/sq ft (≈ $877,110.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Miami-Dade Water and Sewer Department City of Sweetwater Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$712,895.00Includes unconfirmed feesAventura$897,672.50Includes unconfirmed feesBal Harbour$661,812.00Includes unconfirmed feesBay Harbor Islands$606,603.58Includes unconfirmed feesBiscayne Park$697,730.00Includes unconfirmed feesCoral Gables$810,580.00Cutler Bay$697,760.00Includes unconfirmed feesDoral$669,960.00El Portal$661,260.00Includes unconfirmed feesFlorida City$953,330.00Includes unconfirmed feesGolden Beach$797,760.00Includes unconfirmed feesHialeah$679,664.00Hialeah Gardens$661,260.00Includes unconfirmed feesHomestead$714,747.73Includes unconfirmed feesIndian Creek$605,060.00Includes unconfirmed feesKey Biscayne$576,850.00Medley$706,510.00Includes unconfirmed feesMiami$837,636.00Includes unconfirmed feesMiami Beach$1,277,324.00Miami Gardens$816,260.00Includes unconfirmed feesMiami Lakes$1,538,168.50Includes unconfirmed feesMiami Shores$605,060.00Includes unconfirmed feesMiami Springs$605,060.00Includes unconfirmed feesNorth Bay Village$641,782.03Includes unconfirmed feesNorth Miami$1,027,183.00Includes unconfirmed feesNorth Miami Beach$808,323.00Includes unconfirmed feesOpa-locka$676,348.00Includes unconfirmed feesPalmetto Bay$972,195.00Includes unconfirmed feesPinecrest$732,760.00Includes unconfirmed feesSouth Miami$661,260.00Includes unconfirmed feesSunny Isles Beach$952,960.00Includes unconfirmed feesSurfside$605,821.00Includes unconfirmed fees
Sweetwater$877,110.00this pageIncludes unconfirmed fees
Virginia Gardens$661,260.00Includes unconfirmed feesWest Miami$778,189.00Includes unconfirmed fees

Sweetwater: Industrial Impact Fees

Industrial development in Sweetwater pays $8.17 per square foot in impact fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $408,580.00. The calculator below adjusts to your exact square footage.

The largest line items are Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft), Transportation Impact Fee (City of Sweetwater, Industrial) ($1.06/sq ft) and General Government Impact Fee (City of Sweetwater, Industrial) ($0.17/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Charge (Miami-Dade WASD) and Water Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Sweetwater Impact Fee Schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Water service in Sweetwater is retail from Miami-Dade WASD. The one-time nonresidential water connection charge is $1.39 per average daily gallon of estimated demand, with the gallonage assigned by land use under the county's daily rated gallonage schedule; WASD sets no nonresidential meter-size ladder. Rate in the WASD schedule effective October 1, 2026 (unchanged from the prior year).
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Sewer service in Sweetwater is retail from Miami-Dade WASD. The one-time nonresidential wastewater connection charge is $5.60 per average daily gallon of estimated demand ($2.80 for a customer with an approved graywater disposal system), with the gallonage assigned by land use under the county's daily rated gallonage schedule; WASD sets no nonresidential meter-size ladder. Rate in the WASD schedule effective October 1, 2026 (unchanged from the prior year).
    Contact jurisdiction/utility to verify
City$1.24/sq ft
  • Transportation Impact Fee (City of Sweetwater, Industrial)
    City of Sweetwater
    Sweetwater transportation impact fee, $1,064 per 1,000 square feet of gross floor area for the Industrial land use, adopted by Ordinance 5128 (October 23, 2024) and amended by Ordinance 5212 (November 3, 2025). Fees are assessed on the principal use of the building. Paid at building permit issuance; collection may be deferred to the temporary certificate of occupancy. Warehouse uses pay a lower rate of $532.
    $1.06/sq ft
  • General Government Impact Fee (City of Sweetwater, Industrial)
    City of Sweetwater
    Sweetwater general government impact fee (it also funds police facilities), $174 per 1,000 square feet of gross floor area for the Industrial land use, adopted by Ordinance 5128 (October 23, 2024) and amended by Ordinance 5212 (November 3, 2025). Fees are assessed on the principal use of the building. Paid at building permit issuance; collection may be deferred to the temporary certificate of occupancy. Warehouse uses pay a lower rate of $106.
    $0.17/sq ft
County$6.93/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), which applies countywide, charged per square foot for general light industrial use, on the rate schedule in effect December 31, 2023 through December 30, 2027. Rates by parcel Context Zone: Zone 1 $4.944, Zone 2 $4.760, Zone 3 $5.225, Zone 4 $5.453 per sq ft; the amount shown is the Zone 3 rate. A 2% administrative fee is added.
    $5.22/sq ftRequires confirmation
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Miami-Dade County fire and emergency medical services impact fee, $1.7086 per square foot for industrial uses, on the rate schedule in effect December 31, 2024 through December 30, 2027. Sweetwater is served by the Miami-Dade Fire Rescue district, so the county fee applies.
    $1.71/sq ft
  • Police Services Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    The Miami-Dade County police services impact fee applies only in unincorporated Miami-Dade County, so it is not charged in Sweetwater.
    $0.00
Total (Sweetwater): $8.17/sq ft (≈ $408,580.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Miami-Dade Water and Sewer Department City of Sweetwater Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$381,965.00Includes unconfirmed feesAventura$546,631.50Includes unconfirmed feesBal Harbour$347,232.00Includes unconfirmed feesBay Harbor Islands$324,973.58Includes unconfirmed feesBiscayne Park$383,150.00Includes unconfirmed feesCoral Gables$326,630.00Cutler Bay$366,680.00Includes unconfirmed feesDoral$355,380.00El Portal$346,680.00Includes unconfirmed feesFlorida City$467,140.00Includes unconfirmed feesGolden Beach$483,180.00Includes unconfirmed feesHialeah$317,661.50Hialeah Gardens$346,680.00Includes unconfirmed feesHomestead$383,817.73Includes unconfirmed feesIndian Creek$323,430.00Includes unconfirmed feesKey Biscayne$238,000.00Medley$358,330.00Includes unconfirmed feesMiami$283,276.00Includes unconfirmed feesMiami Beach$358,974.00Miami Gardens$501,680.00Includes unconfirmed feesMiami Lakes$392,555.00Includes unconfirmed feesMiami Shores$323,430.00Includes unconfirmed feesMiami Springs$323,430.00Includes unconfirmed feesNorth Bay Village$333,702.03Includes unconfirmed feesNorth Miami$514,653.00Includes unconfirmed feesNorth Miami Beach$485,583.00Includes unconfirmed feesOpa-locka$361,768.00Includes unconfirmed feesPalmetto Bay$490,315.00Includes unconfirmed feesPinecrest$372,180.00Includes unconfirmed feesSouth Miami$346,680.00Includes unconfirmed feesSunny Isles Beach$483,180.00Includes unconfirmed feesSurfside$324,191.00Includes unconfirmed fees
Sweetwater$408,580.00this pageIncludes unconfirmed fees
Virginia Gardens$346,680.00Includes unconfirmed feesWest Miami$463,609.00Includes unconfirmed fees

Sweetwater: Office Impact Fees

Office development in Sweetwater pays $22.62 per square foot in impact fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to at least $565,502.50. The calculator below adjusts to your exact square footage.

The largest line items are Transportation Impact Fee (City of Sweetwater, Office) ($2.96/sq ft), General Government Impact Fee (City of Sweetwater, Office) ($0.64/sq ft) and Fire and Emergency Services Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Charge (Miami-Dade WASD) and Water Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Sweetwater Impact Fee Schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Water service in Sweetwater is retail from Miami-Dade WASD. The one-time nonresidential water connection charge is $1.39 per average daily gallon of estimated demand, with the gallonage assigned by land use under the county's daily rated gallonage schedule; WASD sets no nonresidential meter-size ladder. Rate in the WASD schedule effective October 1, 2026 (unchanged from the prior year).
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department
    Sewer service in Sweetwater is retail from Miami-Dade WASD. The one-time nonresidential wastewater connection charge is $5.60 per average daily gallon of estimated demand ($2.80 for a customer with an approved graywater disposal system), with the gallonage assigned by land use under the county's daily rated gallonage schedule; WASD sets no nonresidential meter-size ladder. Rate in the WASD schedule effective October 1, 2026 (unchanged from the prior year).
    Contact jurisdiction/utility to verify
City$3.59/sq ft
  • Transportation Impact Fee (City of Sweetwater, Office)
    City of Sweetwater
    Sweetwater transportation impact fee, $2,959 per 1,000 square feet of gross floor area for the Office land use, adopted by Ordinance 5128 (October 23, 2024) and amended by Ordinance 5212 (November 3, 2025). Fees are assessed on the principal use of the building. Paid at building permit issuance; collection may be deferred to the temporary certificate of occupancy.
    $2.96/sq ft
  • General Government Impact Fee (City of Sweetwater, Office)
    City of Sweetwater
    Sweetwater general government impact fee (it also funds police facilities), $635 per 1,000 square feet of gross floor area for the Office land use, adopted by Ordinance 5128 (October 23, 2024) and amended by Ordinance 5212 (November 3, 2025). Fees are assessed on the principal use of the building. Paid at building permit issuance; collection may be deferred to the temporary certificate of occupancy.
    $0.64/sq ft
County$19.03/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), which applies countywide, charged per gross square foot for a general office building of up to 50,000 sq ft, on the rate schedule in effect December 31, 2023 through December 30, 2027. Rates by parcel Context Zone: Zone 1 $17.610, Zone 2 $16.954, Zone 3 $18.607, Zone 4 $19.422 per sq ft; the amount shown is the Zone 3 rate. Larger office buildings pay lower rates by size bracket. A 2% administrative fee is added.
    $18.61/sq ftRequires confirmation
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Miami-Dade County fire and emergency medical services impact fee, $0.4191 per square foot for office uses, on the rate schedule in effect December 31, 2024 through December 30, 2027. Sweetwater is served by the Miami-Dade Fire Rescue district, so the county fee applies.
    $0.42/sq ft
  • Police Services Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    The Miami-Dade County police services impact fee applies only in unincorporated Miami-Dade County, so it is not charged in Sweetwater.
    $0.00
Total (Sweetwater): $22.62/sq ft (≈ $565,502.50 at 25,000 sq ft)
Sources last checked Official fee schedules:Miami-Dade Water and Sewer Department City of Sweetwater Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$507,970.00Includes unconfirmed feesAventura$580,707.25Includes unconfirmed feesBal Harbour$476,204.50Includes unconfirmed feesBay Harbor Islands$435,871.08Includes unconfirmed feesBiscayne Park$499,622.50Includes unconfirmed feesCoral Gables$569,630.00Cutler Bay$487,652.50Includes unconfirmed feesDoral$480,002.50El Portal$475,652.50Includes unconfirmed feesFlorida City$690,247.50Includes unconfirmed feesGolden Beach$543,902.50Includes unconfirmed feesHialeah$497,945.50Hialeah Gardens$475,652.50Includes unconfirmed feesHomestead$509,765.23Includes unconfirmed feesIndian Creek$434,327.50Includes unconfirmed feesKey Biscayne$423,850.00Medley$487,777.50Includes unconfirmed feesMiami$485,963.75Includes unconfirmed feesMiami Beach$553,324.00Miami Gardens$553,152.50Includes unconfirmed feesMiami Lakes$542,796.50Includes unconfirmed feesMiami Shores$434,327.50Includes unconfirmed feesMiami Springs$434,327.50Includes unconfirmed feesNorth Bay Village$443,224.53Includes unconfirmed feesNorth Miami$661,575.50Includes unconfirmed feesNorth Miami Beach$546,424.50Includes unconfirmed feesOpa-locka$486,590.50Includes unconfirmed feesPalmetto Bay$699,120.00Includes unconfirmed feesPinecrest$501,652.50Includes unconfirmed feesSouth Miami$475,652.50Includes unconfirmed feesSunny Isles Beach$587,077.50Includes unconfirmed feesSurfside$435,088.50Includes unconfirmed fees
Sweetwater$565,502.50this pageIncludes unconfirmed fees
Virginia Gardens$475,652.50Includes unconfirmed feesWest Miami$537,581.50Includes unconfirmed fees

Sweetwater Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Sweetwater Impact Fee FAQs

What are the total impact fees for a single-family home in Sweetwater, Florida?

A new single-family home in Sweetwater pays $19,557.45 per unit in combined impact fees (rates sourced October 21, 2026).

How much are commercial impact fees in Sweetwater?

Commercial development in Sweetwater pays $17.54 per square foot in impact fees, at least $877,110.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Sweetwater charge its own impact fees?

Yes. Sweetwater levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Sweetwater, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000