Coral Gables, Florida Impact Fees

Coral Gables applies its own fee schedule: municipal fees plus the Miami-Dade County-levied fees that apply inside city limits. Combined, a new single-family home pays $11,929.90 per unit (rates sourced ). The full breakdown is below.

Coral Gables Impact Fees by Project Type

Coral Gables: Single-Family Impact Fees

A new single-family home in Coral Gables pays $11,929.90 per unit in impact fees (rates sourced October 21, 2026). Of that, Miami-Dade County-levied fees account for $2,448.00 and municipal or utility fees for $9,481.90.

The largest line items are Parks & Recreation Impact Fee (City of Coral Gables) ($5,774.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Mobility Impact Fee (City of Coral Gables) ($1,304.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Coral Gables Impact Fee Schedule
Water$291.90
  • Water Connection Charge (Miami-Dade WASD)
    Under 3,001 sq ft (210 gpd)
    Miami-Dade Water & Sewer Dept
    Water service here is provided by the Miami-Dade Water and Sewer Department (WASD). Its connection charge is $1.39 per average daily gallon (unchanged in the schedule effective October 1, 2026), applied to the County Code flow table for the home's total floor area: 210 gallons per day under 3,001 sq ft (shown), 310 for 3,001 to 5,000 sq ft, 510 over 5,000 sq ft. Meter installation is billed separately.
    $291.90
Sewer$850.00
  • Sewer Capacity Fee (City of Coral Gables)
    3/4" meter
    City of Coral Gables
    The City of Coral Gables charges a sewer capacity fee based on water meter size; the city owns the sewer collection system, which connects to the county system. The amount shown is for the standard 0.75-inch single-family meter, with higher fees for larger meters.
    $850.00
City$8,340.00
  • Parks & Recreation Impact Fee (City of Coral Gables)
    1,401 to 2,500 sq ft
    City of Coral Gables
    The City of Coral Gables charges a parks and recreation impact fee on new residential construction, tiered by dwelling size; the amount shown is for a home of 1,401 to 2,500 sq ft under the schedule effective March 10, 2026.
    $5,774.00
  • Mobility Impact Fee (City of Coral Gables)
    1,401 to 2,500 sq ft
    City of Coral Gables
    The City of Coral Gables administers its own mobility impact fee in place of the county road impact fee. It is tiered by dwelling size; the amount shown is for a home of 1,401 to 2,500 sq ft under the schedule effective March 10, 2026.
    $1,304.00
  • Municipal Impact Fee (City of Coral Gables)
    1,401 to 2,500 sq ft
    City of Coral Gables
    The City of Coral Gables charges a municipal (general government) impact fee on new residential construction, tiered by dwelling size; the amount shown is for a home of 1,401 to 2,500 sq ft. A separate administrative charge applies. Schedule effective March 10, 2026.
    $735.00
  • Fire Impact Fee (City of Coral Gables)
    1,401 to 2,500 sq ft
    City of Coral Gables
    The City of Coral Gables operates its own fire department and charges a city fire impact fee, so the county fire-rescue fee does not apply here. The fee is tiered by dwelling size; the amount shown is for a home of 1,401 to 2,500 sq ft.
    $242.00
  • Police Impact Fee (City of Coral Gables)
    1,401 to 2,500 sq ft
    City of Coral Gables
    The City of Coral Gables charges a police-facilities impact fee on new residential construction. The fee is tiered by dwelling size; the amount shown is for a home of 1,401 to 2,500 sq ft under the schedule effective March 10, 2026.
    $215.00
  • Impact Fee Administrative Charge (City of Coral Gables) — 1,401 to 2,500 sq ft
    City of Coral Gables
    City of Coral Gables impact fee administrative charge, collected in addition to the city impact fees and tiered by unit size: 850 sq ft or less $41; 851 to 1,400 $50; 1,401 to 2,500 $70; 2,501 to 3,700 $88; 3,701 to 4,900 $100; over 4,900 $109.
    $70.00
County$2,448.00
  • Educational Facilities (School) Impact Fee (Miami-Dade County)
    Miami-Dade County Public Schools
    This educational-facilities (school) impact fee is charged countywide by Miami-Dade County, including within municipalities. It is calculated as $612 per unit plus $0.918 per gross square foot (capped at 3,800 sq ft); the amount shown is for a 2,000 sq ft single-family house. The current schedule runs through the end of 2027.
    $2,448.00
Total (Coral Gables): $11,929.90
Sources last checked Official fee schedules:Miami-Dade Water & Sewer Dept City of Coral Gables Miami-Dade County Public Schools

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Coral Gables: Multifamily Impact Fees

A new multifamily unit in Coral Gables pays $8,615.65 per unit in impact fees (rates sourced October 21, 2026). Of that, Miami-Dade County-levied fees account for $1,530.00 and municipal or utility fees for $7,085.65.

The largest line items are Parks & Recreation Impact Fee (City of Coral Gables, MF) ($4,187.00), Educational Facilities (School) Impact Fee (Miami-Dade County, MF) ($1,530.00) and Mobility Impact Fee (City of Coral Gables, MF) ($946.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Coral Gables Impact Fee Schedule
Water$187.65
  • Water Connection Charge (Miami-Dade WASD) (MF)
    Miami-Dade Water & Sewer Dept
    Water service in this area is provided by the Miami-Dade Water and Sewer Department (WASD), whose water connection charge is $1.39 per average daily gallon (effective October 1, 2024). The amount shown reflects the standard multifamily demand of 135 gallons per day per unit.
    $187.65
Sewer$850.00
  • Sewer Capacity Fee (City of Coral Gables, MF)
    3/4" meter
    City of Coral Gables
    The City of Coral Gables charges a sewer capacity fee based on water meter size; the city owns the sewer collection system, which connects to the county system. The amount shown is for a 0.75-inch meter, but multifamily buildings are typically served by a larger shared master meter, so the actual fee scales with that meter's size.
    $850.00
City$6,048.00
  • Parks & Recreation Impact Fee (City of Coral Gables, MF)
    851 to 1,400 sq ft
    City of Coral Gables
    The City of Coral Gables charges a parks and recreation impact fee on new residential construction, tiered by unit size; the amount shown is for a unit of 851 to 1,400 sq ft. Schedule effective March 10, 2026.
    $4,187.00
  • Mobility Impact Fee (City of Coral Gables, MF)
    851 to 1,400 sq ft
    City of Coral Gables
    The City of Coral Gables administers its own mobility impact fee in place of the county road impact fee. It is tiered by unit size; the amount shown is for a unit of 851 to 1,400 sq ft.
    $946.00
  • Municipal Impact Fee (City of Coral Gables, MF)
    851 to 1,400 sq ft
    City of Coral Gables
    The City of Coral Gables charges a municipal (general government) impact fee on new residential construction, tiered by unit size; the amount shown is for a unit of 851 to 1,400 sq ft. Schedule effective March 10, 2026.
    $533.00
  • Fire Impact Fee (City of Coral Gables, MF)
    851 to 1,400 sq ft
    City of Coral Gables
    The City of Coral Gables operates its own fire department and charges a city fire impact fee, so the county fire-rescue fee does not apply here. The fee is tiered by unit size; the amount shown is for a unit of 851 to 1,400 sq ft.
    $176.00
  • Police Impact Fee (City of Coral Gables, MF)
    851 to 1,400 sq ft
    City of Coral Gables
    The City of Coral Gables charges a police-facilities impact fee on new residential construction, tiered by unit size; the amount shown is for a unit of 851 to 1,400 sq ft. Schedule effective March 10, 2026.
    $156.00
  • Impact Fee Administrative Charge (City of Coral Gables, MF) — 851 to 1,400 sq ft
    City of Coral Gables
    City of Coral Gables impact fee administrative charge, collected in addition to the city impact fees and tiered by unit size: 850 sq ft or less $41; 851 to 1,400 $50; 1,401 to 2,500 $70; larger units up to $109.
    $50.00
County$1,530.00
  • Educational Facilities (School) Impact Fee (Miami-Dade County, MF)
    Miami-Dade County Public Schools
    Miami-Dade County educational facilities (school) impact fee, charged countywide including all municipalities. $612 per unit plus $0.918 per sq ft; shown here for a 1,000 sq ft unit ($1,530). Current schedule effective 12/31/2024 through 12/30/2027.
    $1,530.00
Total (Coral Gables): $8,615.65
Sources last checked Official fee schedules:Miami-Dade Water & Sewer Dept City of Coral Gables Miami-Dade County Public Schools

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Coral Gables: Commercial Impact Fees

Commercial development in Coral Gables pays $16.18 per square foot in impact fees, plus $1,430.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $810,580.00. The calculator below adjusts to your exact square footage.

The largest line items are Sanitary Sewer Capacity Fee (City of Coral Gables) — 1" meter ($1,420.00 one-time), Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) ($11.54/sq ft) and Sewer Capacity Fee Service Charge (City of Coral Gables) ($10.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Charge (Miami-Dade WASD) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Coral Gables Impact Fee Schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water & Sewer Department (WASD)
    Water service is provided by Miami-Dade WASD. The one-time nonresidential water connection charge is $1.39 per gallon of the project's estimated average daily demand, with the gallonage set by land use under the county's rated gallonage table, schedule effective October 1, 2026.
    Contact jurisdiction/utility to verify
Sewer$1,430.00 one-time
  • Sanitary Sewer Capacity Fee (City of Coral Gables) — 1" meter
    City of Coral Gables
    City of Coral Gables sanitary sewer capacity fee for a 1 in. water meter, charged on new connections and on added demand at an existing connection, schedule effective June 29, 2017. A $10 service charge per meter is collected with it. Meters larger than 8 in. are priced from the project's average daily demand.
    $1,420.00 one-time
  • Sewer Capacity Fee Service Charge (City of Coral Gables)
    City of Coral Gables
    One-time City of Coral Gables service charge of $10 per meter, collected with the sanitary sewer capacity fee on every new connection, schedule effective June 29, 2017.
    $10.00 one-time
City$4.65/sq ft
  • Mobility Impact Fee (City of Coral Gables, Commercial)
    City of Coral Gables
    City of Coral Gables mobility impact fee for retail and restaurant uses (commercial buildings, shopping centers, supermarkets, pharmacies, restaurants, bars and auto dealerships): $1,558 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $1.56/sq ft
  • Parks and Recreation Impact Fee (City of Coral Gables, Commercial)
    City of Coral Gables
    City of Coral Gables parks and recreation impact fee for retail and restaurant uses (commercial buildings, shopping centers, supermarkets, pharmacies, restaurants, bars and auto dealerships): $1,244 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $1.24/sq ft
  • Municipal Impact Fee (City of Coral Gables, Commercial)
    City of Coral Gables
    City of Coral Gables municipal (general government) impact fee for retail and restaurant uses (commercial buildings, shopping centers, supermarkets, pharmacies, restaurants, bars and auto dealerships): $880 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.88/sq ft
  • Police Impact Fee (City of Coral Gables, Commercial)
    City of Coral Gables
    City of Coral Gables police impact fee for retail and restaurant uses (commercial buildings, shopping centers, supermarkets, pharmacies, restaurants, bars and auto dealerships): $591 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.59/sq ft
  • Fire Impact Fee (City of Coral Gables, Commercial)
    City of Coral Gables
    City of Coral Gables fire impact fee for retail and restaurant uses (commercial buildings, shopping centers, supermarkets, pharmacies, restaurants, bars and auto dealerships): $290 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.29/sq ft
  • Impact Fee Administrative Charge (City of Coral Gables, Commercial)
    City of Coral Gables
    City of Coral Gables impact fee administrative charge, collected with the city impact fees for retail and restaurant uses (commercial buildings, shopping centers, supermarkets, pharmacies, restaurants, bars and auto dealerships): $83 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017.
    $0.08/sq ft
County$11.54/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), which applies countywide, charged per gross square foot for a shopping plaza of 40,000 to 150,000 sq ft without a supermarket, on the rate schedule in effect December 31, 2023 through December 30, 2027. Rates by parcel Context Zone: Zone 1 $11.982, Zone 2 $11.537, Zone 3 $12.661, Zone 4 $13.216 per sq ft; the county code places Coral Gables in Zone 2, the rate shown. A 2% administrative fee is added.
    $11.54/sq ft
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Coral Gables has its own fire department outside the Miami-Dade Fire Rescue district, so the county fire impact fee is not charged here.
    $0.00
  • Police Services Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    The Miami-Dade County police services impact fee applies only in unincorporated Miami-Dade County, so it is not charged in Coral Gables.
    $0.00
Total (Coral Gables): $16.18/sq ft + $1,430.00 one-time (≈ $810,580.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Miami-Dade Water & Sewer Department (WASD) City of Coral Gables Miami-Dade County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$712,895.00Includes unconfirmed feesAventura$897,672.50Includes unconfirmed feesBal Harbour$661,812.00Includes unconfirmed feesBay Harbor Islands$606,603.58Includes unconfirmed feesBiscayne Park$697,730.00Includes unconfirmed fees
Coral Gables$810,580.00this page
Cutler Bay$697,760.00Includes unconfirmed feesDoral$669,960.00El Portal$661,260.00Includes unconfirmed feesFlorida City$953,330.00Includes unconfirmed feesGolden Beach$797,760.00Includes unconfirmed feesHialeah$679,664.00Hialeah Gardens$661,260.00Includes unconfirmed feesHomestead$714,747.73Includes unconfirmed feesIndian Creek$605,060.00Includes unconfirmed feesKey Biscayne$576,850.00Medley$706,510.00Includes unconfirmed feesMiami$837,636.00Includes unconfirmed feesMiami Beach$1,277,324.00Miami Gardens$816,260.00Includes unconfirmed feesMiami Lakes$1,538,168.50Includes unconfirmed feesMiami Shores$605,060.00Includes unconfirmed feesMiami Springs$605,060.00Includes unconfirmed feesNorth Bay Village$641,782.03Includes unconfirmed feesNorth Miami$1,027,183.00Includes unconfirmed feesNorth Miami Beach$808,323.00Includes unconfirmed feesOpa-locka$676,348.00Includes unconfirmed feesPalmetto Bay$972,195.00Includes unconfirmed feesPinecrest$732,760.00Includes unconfirmed feesSouth Miami$661,260.00Includes unconfirmed feesSunny Isles Beach$952,960.00Includes unconfirmed feesSurfside$605,821.00Includes unconfirmed feesSweetwater$877,110.00Includes unconfirmed feesVirginia Gardens$661,260.00Includes unconfirmed feesWest Miami$778,189.00Includes unconfirmed fees

Coral Gables: Industrial Impact Fees

Industrial development in Coral Gables pays $6.50 per square foot in impact fees, plus $1,430.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 50,000 sq ft building, that comes to at least $326,630.00. The calculator below adjusts to your exact square footage.

The largest line items are Sanitary Sewer Capacity Fee (City of Coral Gables) — 1" meter ($1,420.00 one-time), Sewer Capacity Fee Service Charge (City of Coral Gables) ($10.00 one-time) and Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) ($4.76/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Charge (Miami-Dade WASD) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Coral Gables Impact Fee Schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water & Sewer Department (WASD)
    Water service is provided by Miami-Dade WASD. The one-time nonresidential water connection charge is $1.39 per gallon of the project's estimated average daily demand, with the gallonage set by land use under the county's rated gallonage table, schedule effective October 1, 2026.
    Contact jurisdiction/utility to verify
Sewer$1,430.00 one-time
  • Sanitary Sewer Capacity Fee (City of Coral Gables) — 1" meter
    City of Coral Gables
    City of Coral Gables sanitary sewer capacity fee for a 1 in. water meter, charged on new connections and on added demand at an existing connection, schedule effective June 29, 2017. A $10 service charge per meter is collected with it. Meters larger than 8 in. are priced from the project's average daily demand.
    $1,420.00 one-time
  • Sewer Capacity Fee Service Charge (City of Coral Gables)
    City of Coral Gables
    One-time City of Coral Gables service charge of $10 per meter, collected with the sanitary sewer capacity fee on every new connection, schedule effective June 29, 2017.
    $10.00 one-time
City$1.74/sq ft
  • Mobility Impact Fee (City of Coral Gables, Industrial)
    City of Coral Gables
    City of Coral Gables mobility impact fee for institutional and industrial uses (schools, churches, daycare, government buildings, warehouses, utility substations and telecommunication buildings): $589 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.59/sq ft
  • Parks and Recreation Impact Fee (City of Coral Gables, Industrial)
    City of Coral Gables
    City of Coral Gables parks and recreation impact fee for institutional and industrial uses (schools, churches, daycare, government buildings, warehouses, utility substations and telecommunication buildings): $470 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.47/sq ft
  • Municipal Impact Fee (City of Coral Gables, Industrial)
    City of Coral Gables
    City of Coral Gables municipal (general government) impact fee for institutional and industrial uses (schools, churches, daycare, government buildings, warehouses, utility substations and telecommunication buildings): $332 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.33/sq ft
  • Police Impact Fee (City of Coral Gables, Industrial)
    City of Coral Gables
    City of Coral Gables police impact fee for institutional and industrial uses (schools, churches, daycare, government buildings, warehouses, utility substations and telecommunication buildings): $213 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.21/sq ft
  • Fire Impact Fee (City of Coral Gables, Industrial)
    City of Coral Gables
    City of Coral Gables fire impact fee for institutional and industrial uses (schools, churches, daycare, government buildings, warehouses, utility substations and telecommunication buildings): $109 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.11/sq ft
  • Impact Fee Administrative Charge (City of Coral Gables, Industrial)
    City of Coral Gables
    City of Coral Gables impact fee administrative charge, collected with the city impact fees for institutional and industrial uses (schools, churches, daycare, government buildings, warehouses, utility substations and telecommunication buildings): $31 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017.
    $0.03/sq ft
County$4.76/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), which applies countywide, charged per square foot for general light industrial use, on the rate schedule in effect December 31, 2023 through December 30, 2027. Rates by parcel Context Zone: Zone 1 $4.944, Zone 2 $4.760, Zone 3 $5.225, Zone 4 $5.453 per sq ft; the county code places Coral Gables in Zone 2, the rate shown. A 2% administrative fee is added.
    $4.76/sq ft
  • Police Services Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    The Miami-Dade County police services impact fee applies only in unincorporated Miami-Dade County, so it is not charged in Coral Gables.
    $0.00
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Coral Gables has its own fire department outside the Miami-Dade Fire Rescue district, so the county fire impact fee is not charged here.
    $0.00
Total (Coral Gables): $6.50/sq ft + $1,430.00 one-time (≈ $326,630.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Miami-Dade Water & Sewer Department (WASD) City of Coral Gables Miami-Dade County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$381,965.00Includes unconfirmed feesAventura$546,631.50Includes unconfirmed feesBal Harbour$347,232.00Includes unconfirmed feesBay Harbor Islands$324,973.58Includes unconfirmed feesBiscayne Park$383,150.00Includes unconfirmed fees
Coral Gables$326,630.00this page
Cutler Bay$366,680.00Includes unconfirmed feesDoral$355,380.00El Portal$346,680.00Includes unconfirmed feesFlorida City$467,140.00Includes unconfirmed feesGolden Beach$483,180.00Includes unconfirmed feesHialeah$317,661.50Hialeah Gardens$346,680.00Includes unconfirmed feesHomestead$383,817.73Includes unconfirmed feesIndian Creek$323,430.00Includes unconfirmed feesKey Biscayne$238,000.00Medley$358,330.00Includes unconfirmed feesMiami$283,276.00Includes unconfirmed feesMiami Beach$358,974.00Miami Gardens$501,680.00Includes unconfirmed feesMiami Lakes$392,555.00Includes unconfirmed feesMiami Shores$323,430.00Includes unconfirmed feesMiami Springs$323,430.00Includes unconfirmed feesNorth Bay Village$333,702.03Includes unconfirmed feesNorth Miami$514,653.00Includes unconfirmed feesNorth Miami Beach$485,583.00Includes unconfirmed feesOpa-locka$361,768.00Includes unconfirmed feesPalmetto Bay$490,315.00Includes unconfirmed feesPinecrest$372,180.00Includes unconfirmed feesSouth Miami$346,680.00Includes unconfirmed feesSunny Isles Beach$483,180.00Includes unconfirmed feesSurfside$324,191.00Includes unconfirmed feesSweetwater$408,580.00Includes unconfirmed feesVirginia Gardens$346,680.00Includes unconfirmed feesWest Miami$463,609.00Includes unconfirmed fees

Coral Gables: Office Impact Fees

Office development in Coral Gables pays $22.73 per square foot in impact fees, plus $1,430.00 in one-time water and sewer connection fees (rates sourced October 21, 2026).

For a 25,000 sq ft building, that comes to at least $569,630.00. The calculator below adjusts to your exact square footage.

The largest line items are Sanitary Sewer Capacity Fee (City of Coral Gables) — 1" meter ($1,420.00 one-time), Multimodal Mobility Impact Fee (Miami-Dade County, Office) ($16.95/sq ft) and Sewer Capacity Fee Service Charge (City of Coral Gables) ($10.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Connection Charge (Miami-Dade WASD) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Coral Gables Impact Fee Schedule
Water$0.00
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water & Sewer Department (WASD)
    Water service is provided by Miami-Dade WASD. The one-time nonresidential water connection charge is $1.39 per gallon of the project's estimated average daily demand, with the gallonage set by land use under the county's rated gallonage table, schedule effective October 1, 2026.
    Contact jurisdiction/utility to verify
Sewer$1,430.00 one-time
  • Sanitary Sewer Capacity Fee (City of Coral Gables) — 1" meter
    City of Coral Gables
    City of Coral Gables sanitary sewer capacity fee for a 1 in. water meter, charged on new connections and on added demand at an existing connection, schedule effective June 29, 2017. A $10 service charge per meter is collected with it. Meters larger than 8 in. are priced from the project's average daily demand.
    $1,420.00 one-time
  • Sewer Capacity Fee Service Charge (City of Coral Gables)
    City of Coral Gables
    One-time City of Coral Gables service charge of $10 per meter, collected with the sanitary sewer capacity fee on every new connection, schedule effective June 29, 2017.
    $10.00 one-time
City$5.77/sq ft
  • Mobility Impact Fee (City of Coral Gables, Office)
    City of Coral Gables
    City of Coral Gables mobility impact fee for office and other service uses (banks, business offices, hotels, theaters, assisted living, hospitals, medical offices and veterinary clinics): $2,130 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $2.13/sq ft
  • Parks and Recreation Impact Fee (City of Coral Gables, Office)
    City of Coral Gables
    City of Coral Gables parks and recreation impact fee for office and other service uses (banks, business offices, hotels, theaters, assisted living, hospitals, medical offices and veterinary clinics): $1,700 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $1.70/sq ft
  • Municipal Impact Fee (City of Coral Gables, Office)
    City of Coral Gables
    City of Coral Gables municipal (general government) impact fee for office and other service uses (banks, business offices, hotels, theaters, assisted living, hospitals, medical offices and veterinary clinics): $1,202 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $1.20/sq ft
  • Fire Impact Fee (City of Coral Gables, Office)
    City of Coral Gables
    City of Coral Gables fire impact fee for office and other service uses (banks, business offices, hotels, theaters, assisted living, hospitals, medical offices and veterinary clinics): $397 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.40/sq ft
  • Police Impact Fee (City of Coral Gables, Office)
    City of Coral Gables
    City of Coral Gables police impact fee for office and other service uses (banks, business offices, hotels, theaters, assisted living, hospitals, medical offices and veterinary clinics): $231 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017. Collected with an impact fee administrative charge. A net increase of 1,000 sq ft or less pays no impact fee, and additions or changes of use pay only on the net increase over the prior use.
    $0.23/sq ft
  • Impact Fee Administrative Charge (City of Coral Gables, Office)
    City of Coral Gables
    City of Coral Gables impact fee administrative charge, collected with the city impact fees for office and other service uses (banks, business offices, hotels, theaters, assisted living, hospitals, medical offices and veterinary clinics): $114 per 1,000 sq ft of gross floor area, schedule effective June 29, 2017.
    $0.11/sq ft
County$16.95/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Miami-Dade County multimodal mobility impact fee (roads, bicycle and transit), which applies countywide, charged per gross square foot for a general office building of up to 50,000 sq ft, on the rate schedule in effect December 31, 2023 through December 30, 2027. Rates by parcel Context Zone: Zone 1 $17.610, Zone 2 $16.954, Zone 3 $18.607, Zone 4 $19.422 per sq ft; the county code places Coral Gables in Zone 2, the rate shown. Larger office buildings pay lower rates by size bracket. A 2% administrative fee is added.
    $16.95/sq ft
  • Police Services Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    The Miami-Dade County police services impact fee applies only in unincorporated Miami-Dade County, so it is not charged in Coral Gables.
    $0.00
  • Fire and Emergency Services Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Coral Gables has its own fire department outside the Miami-Dade Fire Rescue district, so the county fire impact fee is not charged here.
    $0.00
Total (Coral Gables): $22.73/sq ft + $1,430.00 one-time (≈ $569,630.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Miami-Dade Water & Sewer Department (WASD) City of Coral Gables Miami-Dade County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Miami-Dade County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$507,970.00Includes unconfirmed feesAventura$580,707.25Includes unconfirmed feesBal Harbour$476,204.50Includes unconfirmed feesBay Harbor Islands$435,871.08Includes unconfirmed feesBiscayne Park$499,622.50Includes unconfirmed fees
Coral Gables$569,630.00this page
Cutler Bay$487,652.50Includes unconfirmed feesDoral$480,002.50El Portal$475,652.50Includes unconfirmed feesFlorida City$690,247.50Includes unconfirmed feesGolden Beach$543,902.50Includes unconfirmed feesHialeah$497,945.50Hialeah Gardens$475,652.50Includes unconfirmed feesHomestead$509,765.23Includes unconfirmed feesIndian Creek$434,327.50Includes unconfirmed feesKey Biscayne$423,850.00Medley$487,777.50Includes unconfirmed feesMiami$485,963.75Includes unconfirmed feesMiami Beach$553,324.00Miami Gardens$553,152.50Includes unconfirmed feesMiami Lakes$542,796.50Includes unconfirmed feesMiami Shores$434,327.50Includes unconfirmed feesMiami Springs$434,327.50Includes unconfirmed feesNorth Bay Village$443,224.53Includes unconfirmed feesNorth Miami$661,575.50Includes unconfirmed feesNorth Miami Beach$546,424.50Includes unconfirmed feesOpa-locka$486,590.50Includes unconfirmed feesPalmetto Bay$699,120.00Includes unconfirmed feesPinecrest$501,652.50Includes unconfirmed feesSouth Miami$475,652.50Includes unconfirmed feesSunny Isles Beach$587,077.50Includes unconfirmed feesSurfside$435,088.50Includes unconfirmed feesSweetwater$565,502.50Includes unconfirmed feesVirginia Gardens$475,652.50Includes unconfirmed feesWest Miami$537,581.50Includes unconfirmed fees

Coral Gables Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Coral Gables Impact Fee FAQs

What are the total impact fees for a single-family home in Coral Gables, Florida?

A new single-family home in Coral Gables pays $11,929.90 per unit in combined impact fees (rates sourced October 21, 2026).

How much are commercial impact fees in Coral Gables?

Commercial development in Coral Gables pays $16.18 per square foot in impact fees, plus $1,430.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $810,580.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Coral Gables charge its own impact fees?

Yes. Coral Gables levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Coral Gables, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.