Homestead, Florida Impact Fees

Homestead applies its own fee schedule: municipal fees plus the Miami-Dade County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $12,797.33 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Homestead impact fees by project type

Homestead: Single-Family Impact Fees

A new single-family home in Homestead pays at least $12,797.33 per unit in impact fees (rates sourced August 4, 2026). Of that, Miami-Dade County-levied fees account for $12,250.55 and municipal or utility fees for $546.78.

The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Fire-Rescue Impact Fee (Miami-Dade County) ($527.55).

Sewer Connection/Capacity Fee (Homestead Public Services) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection/Capacity Fee (Homestead Public Services) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full Homestead impact fee schedule
Water$0.00
Sewer$546.78
City$0.00
  • Parks & Recreation Impact Fee (City of Homestead)
    City of Homestead
    The City of Homestead does not charge a municipal parks and recreation impact fee; no impact fees appear in its published code of ordinances or fee schedule.
    $0.00
  • Police Impact Fee (City of Homestead)
    City of Homestead
    The City of Homestead does not charge a municipal police impact fee; no impact fees appear in its published code of ordinances or fee schedule.
    $0.00
County$12,250.55
Total (Homestead): $12,797.33
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Homestead: Multifamily Impact Fees

A new multifamily unit in Homestead pays at least $7,069.33 per unit in impact fees (rates sourced August 4, 2026). Of that, Miami-Dade County-levied fees account for $6,522.55 and municipal or utility fees for $546.78.

The largest line items are Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF) ($4,465.00), Educational Facilities (School) Impact Fee (Miami-Dade County, MF) ($1,530.00) and Fire-Rescue Impact Fee (Miami-Dade County, MF) ($527.55).

Sewer Connection/Capacity Fee (Homestead Public Services, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Connection/Capacity Fee (Homestead Public Services, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Homestead impact fee schedule
Water$0.00
Sewer$546.78
City$0.00
County$6,522.55
Total (Homestead): $7,069.33
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Homestead: Commercial Impact Fees

Commercial development in Homestead pays $14.26 per square foot in impact fees, plus $1,659.56 in one-time water and sewer connection fees (rates sourced August 4, 2026).

For a 50,000 sq ft building, that comes to at least $714,669.56. The calculator below adjusts to your exact square footage.

The largest line items are Water Minimum Connection Charge (Homestead Public Services) — 1" meter ($887.68 one-time), Minimum Commercial/Industrial Sewer Connection Charge (Homestead Public Services) — 1" meter ($771.88 one-time) and Road (Mobility) Impact Fee (Miami-Dade County, Commercial) ($13.22/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Public Works Impact Fee (City of Homestead, Commercial) and Police Protection Impact Fee (City of Homestead, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Use Charge (Homestead Public Services) and Sewer Use Charge (Homestead Public Services) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Homestead impact fee schedule
Water$887.68 one-time
  • Water Minimum Connection Charge (Homestead Public Services) — 1" meter
    Homestead Public Services (City of Homestead)
    One-time minimum water connection charge by Homestead Public Services, set by meter size (amount shown is for a 1-inch meter — see the other tiers). A 25% surcharge applies where city crews perform the connection. Charged in addition to Homestead's per-gallon water capacity charge.
    $887.68 one-time
  • Water Use Charge (Homestead Public Services)
    Homestead Public Services (City of Homestead)
    Water service is provided by Homestead Public Services (the city's own utility). The one-time water capacity fee is $2.22 per gallon of average daily flow, paid at connection; flow is computed from the county's gallonage schedule by land use. A separate meter-size minimum connection charge also applies.
    Contact jurisdiction/utility to verify
Sewer$771.88 one-time
  • Minimum Commercial/Industrial Sewer Connection Charge (Homestead Public Services) — 1" meter
    Homestead Public Services (City of Homestead)
    One-time minimum commercial/industrial sewer connection charge by Homestead Public Services, set by meter size (amount shown is for a 1-inch meter — see the other tiers), or time and materials if greater. Charged in addition to Homestead's per-gallon sewer capacity charge.
    $771.88 one-time
  • Sewer Use Charge (Homestead Public Services)
    Homestead Public Services (City of Homestead)
    Sewer service is provided by Homestead Public Services (the city's own utility). The one-time sewer capacity fee is $6.69 per gallon of average daily flow, paid at connection; flow is computed from the county's gallonage schedule by land use. A separate meter-size minimum connection charge also applies.
    Contact jurisdiction/utility to verify
City$0.48/sq ft
County$13.78/sq ft
Total (Homestead): $14.26/sq ft + $1,659.56 one-time (≈ $714,669.56 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$685,145.00Includes unconfirmed feesAventura$661,260.00Includes unconfirmed feesBal Harbour$661,812.00Includes unconfirmed feesBay Harbor Islands$606,360.00Includes unconfirmed feesBiscayne Park$662,135.00Includes unconfirmed feesCoral Gables$810,570.00Cutler Bay$697,760.00Includes unconfirmed feesDoral$669,960.00El Portal$661,260.00Includes unconfirmed feesFlorida City$953,330.00Includes unconfirmed feesGolden Beach$661,260.00Includes unconfirmed feesHialeah$675,201.50Hialeah Gardens$661,260.00Includes unconfirmed fees
Homestead$714,669.56this pageIncludes unconfirmed fees
Indian Creek$605,060.00Includes unconfirmed feesKey Biscayne$576,850.00Medley$667,560.00Includes unconfirmed feesMiami$836,040.00Includes unconfirmed feesMiami Beach$1,253,000.00Miami Gardens$816,260.00Includes unconfirmed feesMiami Lakes$1,514,283.50Includes unconfirmed feesMiami Shores$605,060.00Includes unconfirmed feesMiami Springs$605,060.00Includes unconfirmed feesNorth Bay Village$606,982.03Includes unconfirmed feesNorth Miami$1,001,308.00Includes unconfirmed feesNorth Miami Beach$808,323.00Includes unconfirmed feesOpa-locka$729,448.00Includes unconfirmed feesPalmetto Bay$948,310.00Includes unconfirmed feesPinecrest$661,260.00Includes unconfirmed feesSouth Miami$661,260.00Includes unconfirmed feesSunny Isles Beach$929,410.00Includes unconfirmed feesSurfside$605,060.00Includes unconfirmed feesSweetwater$877,110.00Includes unconfirmed feesVirginia Gardens$661,260.00Includes unconfirmed feesWest Miami$661,260.00Includes unconfirmed fees

Homestead: Industrial Impact Fees

Industrial development in Homestead pays $7.64 per square foot in impact fees, plus $1,659.56 in one-time water and sewer connection fees (rates sourced August 4, 2026).

For a 50,000 sq ft building, that comes to at least $383,739.56. The calculator below adjusts to your exact square footage.

The largest line items are Water Minimum Connection Charge (Homestead Public Services) — 1" meter ($887.68 one-time), Minimum Commercial/Industrial Sewer Connection Charge (Homestead Public Services) — 1" meter ($771.88 one-time) and Road (Mobility) Impact Fee (Miami-Dade County, Industrial) ($5.45/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Police Protection Impact Fee (City of Homestead, Industrial) and Public Works Impact Fee (City of Homestead, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Use Charge (Homestead Public Services) and Sewer Use Charge (Homestead Public Services) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Homestead impact fee schedule
Water$887.68 one-time
  • Water Minimum Connection Charge (Homestead Public Services) — 1" meter
    Homestead Public Services (City of Homestead)
    One-time minimum water connection charge by Homestead Public Services, set by meter size (amount shown is for a 1-inch meter — see the other tiers). A 25% surcharge applies where city crews perform the connection. Charged in addition to Homestead's per-gallon water capacity charge.
    $887.68 one-time
  • Water Use Charge (Homestead Public Services)
    Homestead Public Services (City of Homestead)
    Water service is provided by Homestead Public Services (the city's own utility). The one-time water capacity fee is $2.22 per gallon of average daily flow, paid at connection; flow is computed from the county's gallonage schedule by land use. A separate meter-size minimum connection charge also applies.
    Contact jurisdiction/utility to verify
Sewer$771.88 one-time
  • Minimum Commercial/Industrial Sewer Connection Charge (Homestead Public Services) — 1" meter
    Homestead Public Services (City of Homestead)
    One-time minimum commercial/industrial sewer connection charge by Homestead Public Services, set by meter size (amount shown is for a 1-inch meter — see the other tiers), or time and materials if greater. Charged in addition to Homestead's per-gallon sewer capacity charge.
    $771.88 one-time
  • Sewer Use Charge (Homestead Public Services)
    Homestead Public Services (City of Homestead)
    Sewer service is provided by Homestead Public Services (the city's own utility). The one-time sewer capacity fee is $6.69 per gallon of average daily flow, paid at connection; flow is computed from the county's gallonage schedule by land use. A separate meter-size minimum connection charge also applies.
    Contact jurisdiction/utility to verify
City$0.48/sq ft
County$7.16/sq ft
Total (Homestead): $7.64/sq ft + $1,659.56 one-time (≈ $383,739.56 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$370,565.00Includes unconfirmed feesAventura$346,680.00Includes unconfirmed feesBal Harbour$347,232.00Includes unconfirmed feesBay Harbor Islands$324,730.00Includes unconfirmed feesBiscayne Park$347,555.00Includes unconfirmed feesCoral Gables$326,620.00Cutler Bay$366,680.00Includes unconfirmed feesDoral$355,380.00El Portal$346,680.00Includes unconfirmed feesFlorida City$467,140.00Includes unconfirmed feesGolden Beach$346,680.00Includes unconfirmed feesHialeah$313,199.00Hialeah Gardens$346,680.00Includes unconfirmed fees
Homestead$383,739.56this pageIncludes unconfirmed fees
Indian Creek$323,430.00Includes unconfirmed feesKey Biscayne$238,000.00Medley$352,980.00Includes unconfirmed feesMiami$282,670.00Includes unconfirmed feesMiami Beach$349,150.00Miami Gardens$501,680.00Includes unconfirmed feesMiami Lakes$368,670.00Includes unconfirmed feesMiami Shores$323,430.00Includes unconfirmed feesMiami Springs$323,430.00Includes unconfirmed feesNorth Bay Village$325,352.03Includes unconfirmed feesNorth Miami$488,778.00Includes unconfirmed feesNorth Miami Beach$485,583.00Includes unconfirmed feesOpa-locka$375,018.00Includes unconfirmed feesPalmetto Bay$466,430.00Includes unconfirmed feesPinecrest$346,680.00Includes unconfirmed feesSouth Miami$346,680.00Includes unconfirmed feesSunny Isles Beach$483,180.00Includes unconfirmed feesSurfside$323,430.00Includes unconfirmed feesSweetwater$408,580.00Includes unconfirmed feesVirginia Gardens$346,680.00Includes unconfirmed feesWest Miami$346,680.00Includes unconfirmed fees

Homestead: Office Impact Fees

Office development in Homestead pays $20.32 per square foot in impact fees, plus $1,659.56 in one-time water and sewer connection fees (rates sourced August 4, 2026).

For a 25,000 sq ft building, that comes to at least $509,687.06. The calculator below adjusts to your exact square footage.

The largest line items are Water Minimum Connection Charge (Homestead Public Services) — 1" meter ($887.68 one-time), Minimum Commercial/Industrial Sewer Connection Charge (Homestead Public Services) — 1" meter ($771.88 one-time) and Road (Mobility) Impact Fee (Miami-Dade County, Office) ($19.42/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Public Works Impact Fee (City of Homestead, Office) and Police Protection Impact Fee (City of Homestead, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Use Charge (Homestead Public Services) and Sewer Use Charge (Homestead Public Services) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Homestead impact fee schedule
Water$887.68 one-time
  • Water Minimum Connection Charge (Homestead Public Services) — 1" meter
    Homestead Public Services (City of Homestead)
    One-time minimum water connection charge by Homestead Public Services, set by meter size (amount shown is for a 1-inch meter — see the other tiers). A 25% surcharge applies where city crews perform the connection. Charged in addition to Homestead's per-gallon water capacity charge.
    $887.68 one-time
  • Water Use Charge (Homestead Public Services)
    Homestead Public Services (City of Homestead)
    Water service is provided by Homestead Public Services (the city's own utility). The one-time water capacity fee is $2.22 per gallon of average daily flow, paid at connection; flow is computed from the county's gallonage schedule by land use. A separate meter-size minimum connection charge also applies.
    Contact jurisdiction/utility to verify
Sewer$771.88 one-time
  • Minimum Commercial/Industrial Sewer Connection Charge (Homestead Public Services) — 1" meter
    Homestead Public Services (City of Homestead)
    One-time minimum commercial/industrial sewer connection charge by Homestead Public Services, set by meter size (amount shown is for a 1-inch meter — see the other tiers), or time and materials if greater. Charged in addition to Homestead's per-gallon sewer capacity charge.
    $771.88 one-time
  • Sewer Use Charge (Homestead Public Services)
    Homestead Public Services (City of Homestead)
    Sewer service is provided by Homestead Public Services (the city's own utility). The one-time sewer capacity fee is $6.69 per gallon of average daily flow, paid at connection; flow is computed from the county's gallonage schedule by land use. A separate meter-size minimum connection charge also applies.
    Contact jurisdiction/utility to verify
City$0.48/sq ft
County$19.84/sq ft
Total (Homestead): $20.32/sq ft + $1,659.56 one-time (≈ $509,687.06 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$487,595.00Includes unconfirmed feesAventura$475,652.50Includes unconfirmed feesBal Harbour$476,204.50Includes unconfirmed feesBay Harbor Islands$435,627.50Includes unconfirmed feesBiscayne Park$476,527.50Includes unconfirmed feesCoral Gables$569,620.00Cutler Bay$487,652.50Includes unconfirmed feesDoral$480,002.50El Portal$475,652.50Includes unconfirmed feesFlorida City$690,247.50Includes unconfirmed feesGolden Beach$475,652.50Includes unconfirmed feesHialeah$493,483.00Hialeah Gardens$475,652.50Includes unconfirmed fees
Homestead$509,687.06this pageIncludes unconfirmed fees
Indian Creek$434,327.50Includes unconfirmed feesKey Biscayne$423,850.00Medley$481,952.50Includes unconfirmed feesMiami$485,405.00Includes unconfirmed feesMiami Beach$543,500.00Miami Gardens$553,152.50Includes unconfirmed feesMiami Lakes$530,854.00Includes unconfirmed feesMiami Shores$434,327.50Includes unconfirmed feesMiami Springs$434,327.50Includes unconfirmed feesNorth Bay Village$436,249.53Includes unconfirmed feesNorth Miami$648,200.50Includes unconfirmed feesNorth Miami Beach$546,424.50Includes unconfirmed feesOpa-locka$486,590.50Includes unconfirmed feesPalmetto Bay$687,177.50Includes unconfirmed feesPinecrest$475,652.50Includes unconfirmed feesSouth Miami$475,652.50Includes unconfirmed feesSunny Isles Beach$570,427.50Includes unconfirmed feesSurfside$434,327.50Includes unconfirmed feesSweetwater$565,502.50Includes unconfirmed feesVirginia Gardens$475,652.50Includes unconfirmed feesWest Miami$475,652.50Includes unconfirmed fees

Homestead impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Homestead impact fee FAQs

What are the total impact fees for a single-family home in Homestead, Florida?

A new single-family home in Homestead pays at least $12,797.33 per unit in combined impact fees (rates sourced August 4, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Homestead?

Commercial development in Homestead pays $14.26 per square foot in impact fees, plus $1,659.56 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $714,669.56 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Homestead charge its own impact fees?

Yes. Homestead levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Homestead, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.