IMPACTFEES.ORG

Miami Gardens, Florida Impact Fees

Miami Gardens applies its own fee schedule: municipal fees plus the Miami-Dade County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $13,718.45 per unit (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Miami Gardens impact fees by project type

Miami Gardens: Single-Family Impact Fees

A new single-family home in Miami Gardens pays at least $13,718.45 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $12,250.55 and municipal or utility fees for $1,467.90.

The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Sewer Connection Charge (Miami-Dade WASD) ($1,176.00).

Water Connection Charge (Miami-Dade WASD) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Parks & Recreation Impact Fee (City of Miami Gardens) and Police Impact Fee (City of Miami Gardens) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$291.90
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water & Sewer Department (WASD)
    Miami Gardens water served partly by North Miami Beach (Norwood plant) and partly WASD by area. Representative WASD charge $291.90 entered. VERIFY provider by area: NMB 305-948-2967 / WASD 305-665-7477.
    $291.90Requires confirmation
Sewer$1,176.00
City$0.00
County$12,250.55
Total (Miami Gardens): $13,718.45
Sources last checked July 14, 2026Official fee schedules:Miami-Dade Water & Sewer Department (WASD) City of Miami Gardens Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$17,866.55Aventura$13,718.45Includes unconfirmed feesBal Harbour$13,718.45Includes unconfirmed feesBay Harbor Islands$13,718.45Includes unconfirmed feesBiscayne Park$13,718.45Includes unconfirmed feesCoral Gables$11,859.90Cutler Bay$13,718.45Includes unconfirmed feesDoral$13,718.45Includes unconfirmed feesEl Portal$13,718.45Includes unconfirmed feesFlorida City$12,250.55Includes unconfirmed feesGolden Beach$13,426.55Includes unconfirmed feesHialeah$13,190.90Includes unconfirmed feesHialeah Gardens$12,250.55Includes unconfirmed feesHomestead$12,250.55Includes unconfirmed feesIndian Creek$13,718.45Includes unconfirmed feesKey Biscayne$13,190.90Includes unconfirmed feesMedley$13,718.45Includes unconfirmed feesMiami$13,190.90Includes unconfirmed feesMiami Beach$13,190.90Includes unconfirmed fees
Miami Gardens$13,718.45this pageIncludes unconfirmed fees
Miami Lakes$17,866.55Includes unconfirmed feesMiami Shores$13,718.45Includes unconfirmed feesMiami Springs$13,718.45Includes unconfirmed feesNorth Bay Village$13,718.45Includes unconfirmed feesNorth Miami$21,979.55Includes unconfirmed feesNorth Miami Beach$15,041.45Includes unconfirmed feesOpa-locka$13,718.45Includes unconfirmed feesPalmetto Bay$17,866.55Includes unconfirmed feesPinecrest$13,718.45Includes unconfirmed feesSouth Miami$13,718.45Includes unconfirmed feesSunny Isles Beach$13,718.45Includes unconfirmed feesSurfside$13,718.45Includes unconfirmed feesSweetwater$13,718.45Includes unconfirmed feesVirginia Gardens$13,718.45Includes unconfirmed feesWest Miami$13,718.45Includes unconfirmed fees

Miami Gardens: Multifamily Impact Fees

A new multifamily unit in Miami Gardens pays at least $6,548.20 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $5,604.55 and municipal or utility fees for $943.65.

The largest line items are Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF) ($4,465.00), Sewer Connection Charge (Miami-Dade WASD) (MF) ($756.00) and Educational Facilities (School) Impact Fee (Miami-Dade County) (MF) ($612.00).

Water Connection Charge (Miami-Dade WASD, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Police Impact Fee (City of Miami Gardens, MF) and Parks & Recreation Impact Fee (City of Miami Gardens, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$187.65
  • Water Connection Charge (Miami-Dade WASD, MF)
    Miami-Dade Water & Sewer Department (WASD)
    Miami Gardens water partly NMB (Norwood) / partly WASD by area. Rep WASD $187.65 entered. VERIFY NMB 305-948-2967 / WASD 305-665-7477.
    $187.65Requires confirmation
Sewer$756.00
City$0.00
County$5,604.55
Total (Miami Gardens): $6,548.20
Sources last checked July 14, 2026Official fee schedules:Miami-Dade Water & Sewer Department (WASD) City of Miami Gardens Miami-Dade County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$9,405.62Aventura$6,548.20Includes unconfirmed feesBal Harbour$6,548.20Includes unconfirmed feesBay Harbor Islands$6,548.20Includes unconfirmed feesBiscayne Park$6,548.20Includes unconfirmed feesCoral Gables$7,647.65Cutler Bay$6,548.20Includes unconfirmed feesDoral$6,548.20Includes unconfirmed feesEl Portal$6,548.20Includes unconfirmed feesFlorida City$5,604.55Includes unconfirmed feesGolden Beach$6,360.55Includes unconfirmed feesHialeah$6,020.65Includes unconfirmed feesHialeah Gardens$5,604.55Includes unconfirmed feesHomestead$5,604.55Includes unconfirmed feesIndian Creek$6,548.20Includes unconfirmed feesKey Biscayne$6,020.65Includes unconfirmed feesMedley$6,548.20Includes unconfirmed feesMiami$6,020.65Includes unconfirmed feesMiami Beach$6,020.65Includes unconfirmed fees
Miami Gardens$6,548.20this pageIncludes unconfirmed fees
Miami Lakes$9,405.62Includes unconfirmed feesMiami Shores$6,548.20Includes unconfirmed feesMiami Springs$6,548.20Includes unconfirmed feesNorth Bay Village$6,548.20Includes unconfirmed feesNorth Miami$15,778.55Includes unconfirmed feesNorth Miami Beach$7,398.70Includes unconfirmed feesOpa-locka$6,548.20Includes unconfirmed feesPalmetto Bay$9,405.62Includes unconfirmed feesPinecrest$6,548.20Includes unconfirmed feesSouth Miami$6,548.20Includes unconfirmed feesSunny Isles Beach$6,548.20Includes unconfirmed feesSurfside$6,548.20Includes unconfirmed feesSweetwater$6,548.20Includes unconfirmed feesVirginia Gardens$6,548.20Includes unconfirmed feesWest Miami$6,548.20Includes unconfirmed fees

Miami Gardens: Commercial Impact Fees

Commercial development in Miami Gardens pays $16.33 per square foot in impact fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $816,260.00. The calculator below adjusts to your exact square footage.

The largest line items are Fire Flow Demand Charge (NMB Water) ($2.73/sq ft) and Fire-Rescue Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) and Police Impact Fee (City of Miami Gardens, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water In-Plant Fee (NMB Water), Sewer Connection Charge (Miami-Dade WASD), Sanitary Sewer Connection Charge (NMB Water), and Water Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$2.73/sq ft
  • Fire Flow Demand Charge (NMB Water)
    NMB Water (City of North Miami Beach)
    NMB Code Sec. 19-23 'Fire Flow Demand Charge on New Buildings and Conversions', Ord. 2025-06 eff. 9/8/2025. GRADUATED per-sq-ft ladder for 'Commercial and Other Uses Not Mentioned or Expected': first 100,000 sf $2.73/sf; next 100,000 sf $2.18; next 200,000 sf $1.64; next 200,000 sf $1.09; thereafter $0.55. Canonical 50,000 sf commercial / 25,000 sf office / general light industrial all fall entirely in the first-100,000-sf tier at $2.73/sf. (Multi-family/hotels/schools tier is a separate, lower ladder: $1.64/$1.24/$0.83/$0.40/$0.28.) Applies only in NMB Water's Miami Gardens service area (Bunche Park). Stacks with the Sec. 19-22 in-plant fee.
    $2.73/sq ft
  • Water In-Plant Fee (NMB Water)
    NMB Water (City of North Miami Beach)
    NMB Code Sec. 19-22 ('Additional Charge for Expansion and Upgrading of City's Water Facilities'), as updated by Ord. 2025-06, eff. 9/8/2025: 'Each future builder, developer, and owner of new construction... will be charged and pay to the City of North Miami Beach a sum to be computed on the basis of the estimated gallonage. Each gallon per day - seven dollars and fifty-two cents ($7.52).' Applies only in NMB Water's retail service area, which in Miami Gardens is the Bunche Park area. NMB also levies a separate Fire Flow Demand Charge per sq ft (see that record) - the two stack.
    Contact jurisdiction/utility to verify
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Water Fees and Charges, eff. 10/1/2025, item 9: 'Connection Charge Rate - Per average daily gallon $1.39'. NO meter ladder - nonres average daily gallonage is assigned by land use under County Code Sec. 24-43.1(5) (WASD Table 1, Types of Land Use: Office Buildings, Retail, Shopping Center/Mall, Industrial - Warehouse/Spec. Bldg./Wet/Dry, all coded NR). Adopted by Implementing Order 4-110. PROVIDER SPLIT: WASD serves most of Miami Gardens; NMB Water (City of North Miami Beach) serves the Bunche Park area (bounded by NW 17th-32nd Aves and NW 151st-167th Sts, per the City's CDMP Infrastructure Element) - see the separate NMB Water records. Opa-locka is NO LONGER a provider (it transitioned its water utility to WASD); the 2016 CDMP listing it is stale.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Wastewater Fees and Charges, eff. 10/1/2025, item 4: 'Connection Charge Rate - Per average daily gallon $5.60' ($2.80/gal for customers using a graywater disposal system). NO meter ladder; nonres gpd assigned by land use under County Code Sec. 24-43.1(5). WASD provides regional wastewater treatment countywide; NMB has no treatment plant but does levy its own sanitary sewer connection charge in its collection service area (separate record).
    Contact jurisdiction/utility to verify
  • Sanitary Sewer Connection Charge (NMB Water)
    NMB Water (City of North Miami Beach)
    NMB Code Sec. 19-31 'Rates & Charges', Ord. 2025-06 eff. 9/8/2025: 'There is a charge of five dollars and seventy-seven cents ($5.77) per average daily rated gallon for any given connection.' Applies only in NMB's collection service area within Miami Gardens (Bunche Park). NMB owns no treatment plant - wastewater is treated regionally by WASD.
    Contact jurisdiction/utility to verify
City$0.37/sq ft
  • Police Impact Fee (City of Miami Gardens, Commercial)
    City of Miami Gardens
    City Building Fee Schedule (rev. 09/11/2024), Sec. E.4 'POLICE - a. Non-Residential - Each s/f $.37'. ONE flat nonres rate across all land uses - no land-use tiering, no ITE table, no GFA tiers. LDC Ch. 34 Art. III Sec. 34-97 adopts Miami-Dade Ord. 90-59 (Park) and Ord. 90-31 (Police Services) by reference: 'The City of Miami Gardens shall apply and collect the parks and police impact fees pursuant to the above cited Miami-Dade County ordinances. All other impact fees shall be administered and collected by Miami-Dade County.' The city's General Government and Parks rows are RESIDENTIAL-ONLY (per unit); no city transportation/mobility, fire or public-works fee on nonres. UNCONFIRMED: (1) the city schedule cites NO adopting ordinance, resolution, effective date or indexing; (2) the county's own rate schedule prints $0.4777/sf for nonres police, so which rate governs is unresolved. Call Development Services (305) 622-8000; cross-check Miami-Dade Impact Fee Section (786) 315-2670.
    $0.37/sq ftRequires confirmation
County$13.23/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Code Ch. 33E; countywide incl. all municipalities (Sec. 33E-2(c)). Context Zone 3 (Middle Ring) DERIVED from the Sec. 33E-7.1 metes-and-bounds: Miami Gardens (NW 151st-215th St) lies north of the Zone 2 boundary (SR 826 x NW 138th St / NE 125th St closing line) and east of the L-33/L-30 canals that bound Zone 4. The ordinance does NOT name Miami Gardens in any zone list. Schedule row: 'Shopping Plaza (40-150 kgsf) w/o Supermarket' Zone 3 = $12.661/sf (Z1 $11.982 / Z2 $11.537 / Z4 $13.216). Eff. 12/31/2023-12/30/2027; excludes 2% admin fee. UNCONFIRMED - parcel-specific: Zone 1 is a SMART Plan Corridor OVERLAY (the NW/North Corridor runs through Miami Gardens) and full-scale maps are only on file with the County Zoning Dept. Call Impact Fee Section (786) 315-2670.
    $12.66/sq ftRequires confirmation
  • Fire-Rescue Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    Code Sec. 33J-1(b): applies 'throughout the district including unincorporated Miami-Dade County and all municipalities served by the district.' Miami Gardens is served by Miami-Dade Fire Rescue (no municipal FD) - the County's Impact Fees page names only Miami, Miami Beach, Hialeah, Coral Gables and Key Biscayne as exceptions. Single nonres rate per category; Commercial $0.5642/sf. Eff. 12/31/2024-12/30/2027.
    $0.56/sq ft
  • Police Impact Fee (Miami-Dade County, Commercial)
    Miami-Dade County
    $0 CONFIRMED as a COUNTY fee. Code Sec. 33I-1(b) makes the Police Services Impact Fee 'applicable to all land development in unincorporated Miami-Dade County' - it reaches no municipality. Miami Gardens instead levies the police fee itself under LDC Sec. 34-97 (see the City record).
    $0.00
Total (Miami Gardens): $16.33/sq ft (≈ $816,260.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$685,145.00Includes unconfirmed feesAventura$661,260.00Includes unconfirmed feesBal Harbour$661,812.00Includes unconfirmed feesBay Harbor Islands$606,360.00Includes unconfirmed feesBiscayne Park$662,135.00Includes unconfirmed feesCoral Gables$810,570.00Cutler Bay$697,760.00Includes unconfirmed feesDoral$669,960.00El Portal$661,260.00Includes unconfirmed feesFlorida City$953,330.00Includes unconfirmed feesGolden Beach$661,260.00Includes unconfirmed feesHialeah$675,201.50Hialeah Gardens$661,260.00Includes unconfirmed feesHomestead$714,669.56Includes unconfirmed feesIndian Creek$605,060.00Includes unconfirmed feesKey Biscayne$576,850.00Medley$667,560.00Includes unconfirmed feesMiami$836,040.00Includes unconfirmed feesMiami Beach$1,253,000.00
Miami Gardens$816,260.00this pageIncludes unconfirmed fees
Miami Lakes$1,514,283.50Includes unconfirmed feesMiami Shores$605,060.00Includes unconfirmed feesMiami Springs$605,060.00Includes unconfirmed feesNorth Bay Village$606,982.03Includes unconfirmed feesNorth Miami$1,001,308.00Includes unconfirmed feesNorth Miami Beach$808,323.00Includes unconfirmed feesOpa-locka$729,448.00Includes unconfirmed feesPalmetto Bay$948,310.00Includes unconfirmed feesPinecrest$661,260.00Includes unconfirmed feesSouth Miami$661,260.00Includes unconfirmed feesSunny Isles Beach$929,410.00Includes unconfirmed feesSurfside$605,060.00Includes unconfirmed feesSweetwater$877,110.00Includes unconfirmed feesVirginia Gardens$661,260.00Includes unconfirmed feesWest Miami$661,260.00Includes unconfirmed fees

Miami Gardens: Industrial Impact Fees

Industrial development in Miami Gardens pays $10.03 per square foot in impact fees (rates sourced July 14, 2026).

For a 50,000 sq ft building, that comes to at least $501,680.00. The calculator below adjusts to your exact square footage.

The largest line items are Fire Flow Demand Charge (NMB Water) ($2.73/sq ft) and Fire-Rescue Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft).

Police Impact Fee (City of Miami Gardens, Industrial) and Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water In-Plant Fee (NMB Water), Sewer Connection Charge (Miami-Dade WASD), Sanitary Sewer Connection Charge (NMB Water), and Water Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$2.73/sq ft
  • Fire Flow Demand Charge (NMB Water)
    NMB Water (City of North Miami Beach)
    NMB Code Sec. 19-23 'Fire Flow Demand Charge on New Buildings and Conversions', Ord. 2025-06 eff. 9/8/2025. GRADUATED per-sq-ft ladder for 'Commercial and Other Uses Not Mentioned or Expected': first 100,000 sf $2.73/sf; next 100,000 sf $2.18; next 200,000 sf $1.64; next 200,000 sf $1.09; thereafter $0.55. Canonical 50,000 sf commercial / 25,000 sf office / general light industrial all fall entirely in the first-100,000-sf tier at $2.73/sf. (Multi-family/hotels/schools tier is a separate, lower ladder: $1.64/$1.24/$0.83/$0.40/$0.28.) Applies only in NMB Water's Miami Gardens service area (Bunche Park). Stacks with the Sec. 19-22 in-plant fee.
    $2.73/sq ft
  • Water In-Plant Fee (NMB Water)
    NMB Water (City of North Miami Beach)
    NMB Code Sec. 19-22 ('Additional Charge for Expansion and Upgrading of City's Water Facilities'), as updated by Ord. 2025-06, eff. 9/8/2025: 'Each future builder, developer, and owner of new construction... will be charged and pay to the City of North Miami Beach a sum to be computed on the basis of the estimated gallonage. Each gallon per day - seven dollars and fifty-two cents ($7.52).' Applies only in NMB Water's retail service area, which in Miami Gardens is the Bunche Park area. NMB also levies a separate Fire Flow Demand Charge per sq ft (see that record) - the two stack.
    Contact jurisdiction/utility to verify
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Water Fees and Charges, eff. 10/1/2025, item 9: 'Connection Charge Rate - Per average daily gallon $1.39'. NO meter ladder - nonres average daily gallonage is assigned by land use under County Code Sec. 24-43.1(5) (WASD Table 1, Types of Land Use: Office Buildings, Retail, Shopping Center/Mall, Industrial - Warehouse/Spec. Bldg./Wet/Dry, all coded NR). Adopted by Implementing Order 4-110. PROVIDER SPLIT: WASD serves most of Miami Gardens; NMB Water (City of North Miami Beach) serves the Bunche Park area (bounded by NW 17th-32nd Aves and NW 151st-167th Sts, per the City's CDMP Infrastructure Element) - see the separate NMB Water records. Opa-locka is NO LONGER a provider (it transitioned its water utility to WASD); the 2016 CDMP listing it is stale.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Wastewater Fees and Charges, eff. 10/1/2025, item 4: 'Connection Charge Rate - Per average daily gallon $5.60' ($2.80/gal for customers using a graywater disposal system). NO meter ladder; nonres gpd assigned by land use under County Code Sec. 24-43.1(5). WASD provides regional wastewater treatment countywide; NMB has no treatment plant but does levy its own sanitary sewer connection charge in its collection service area (separate record).
    Contact jurisdiction/utility to verify
  • Sanitary Sewer Connection Charge (NMB Water)
    NMB Water (City of North Miami Beach)
    NMB Code Sec. 19-31 'Rates & Charges', Ord. 2025-06 eff. 9/8/2025: 'There is a charge of five dollars and seventy-seven cents ($5.77) per average daily rated gallon for any given connection.' Applies only in NMB's collection service area within Miami Gardens (Bunche Park). NMB owns no treatment plant - wastewater is treated regionally by WASD.
    Contact jurisdiction/utility to verify
City$0.37/sq ft
  • Police Impact Fee (City of Miami Gardens, Industrial)
    City of Miami Gardens
    City Building Fee Schedule (rev. 09/11/2024) Sec. E.4: 'POLICE - Non-Residential - Each s/f $.37' - one flat nonres rate, all land uses. LDC Sec. 34-97. UNCONFIRMED: no adopting ordinance/effective date published, and the county schedule prints $0.4777/sf for nonres police. Call (305) 622-8000.
    $0.37/sq ftRequires confirmation
County$6.93/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Code Ch. 33E; countywide. Context Zone 3 DERIVED from Sec. 33E-7.1 metes-and-bounds (city not named). Schedule row: 'General Light Industrial' Zone 3 = $5.225/sf (Z1 $4.944 / Z2 $4.760 / Z4 $5.453). Warehousing is a separate row ($1.846 Zone 3). Eff. 12/31/2023-12/30/2027; excl. 2% admin fee. UNCONFIRMED - Zone 1 SMART-corridor overlay is parcel-specific. (786) 315-2670.
    $5.22/sq ftRequires confirmation
  • Fire-Rescue Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    Code Sec. 33J-1(b); Miami Gardens is inside the Miami-Dade Fire Rescue District. Industrial $1.7086/sf - the county's highest nonres fire rate. Eff. 12/31/2024-12/30/2027.
    $1.71/sq ft
  • Police Impact Fee (Miami-Dade County, Industrial)
    Miami-Dade County
    $0 CONFIRMED as a COUNTY fee. Sec. 33I-1(b) - unincorporated only. County Parks (Ch. 33H) and Educational Facilities (Ch. 33K) schedules have NO nonresidential rate rows at all - not entered.
    $0.00
Total (Miami Gardens): $10.03/sq ft (≈ $501,680.00 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$370,565.00Includes unconfirmed feesAventura$346,680.00Includes unconfirmed feesBal Harbour$347,232.00Includes unconfirmed feesBay Harbor Islands$324,730.00Includes unconfirmed feesBiscayne Park$347,555.00Includes unconfirmed feesCoral Gables$326,620.00Cutler Bay$366,680.00Includes unconfirmed feesDoral$355,380.00El Portal$346,680.00Includes unconfirmed feesFlorida City$467,140.00Includes unconfirmed feesGolden Beach$346,680.00Includes unconfirmed feesHialeah$313,199.00Hialeah Gardens$346,680.00Includes unconfirmed feesHomestead$383,739.56Includes unconfirmed feesIndian Creek$323,430.00Includes unconfirmed feesKey Biscayne$238,000.00Medley$352,980.00Includes unconfirmed feesMiami$282,670.00Includes unconfirmed feesMiami Beach$349,150.00
Miami Gardens$501,680.00this pageIncludes unconfirmed fees
Miami Lakes$368,670.00Includes unconfirmed feesMiami Shores$323,430.00Includes unconfirmed feesMiami Springs$323,430.00Includes unconfirmed feesNorth Bay Village$325,352.03Includes unconfirmed feesNorth Miami$488,778.00Includes unconfirmed feesNorth Miami Beach$485,583.00Includes unconfirmed feesOpa-locka$375,018.00Includes unconfirmed feesPalmetto Bay$466,430.00Includes unconfirmed feesPinecrest$346,680.00Includes unconfirmed feesSouth Miami$346,680.00Includes unconfirmed feesSunny Isles Beach$483,180.00Includes unconfirmed feesSurfside$323,430.00Includes unconfirmed feesSweetwater$408,580.00Includes unconfirmed feesVirginia Gardens$346,680.00Includes unconfirmed feesWest Miami$346,680.00Includes unconfirmed fees

Miami Gardens: Office Impact Fees

Office development in Miami Gardens pays $22.13 per square foot in impact fees (rates sourced July 14, 2026).

For a 25,000 sq ft building, that comes to at least $553,152.50. The calculator below adjusts to your exact square footage.

The largest line items are Fire Flow Demand Charge (NMB Water) ($2.73/sq ft) and Fire-Rescue Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).

Multimodal Mobility Impact Fee (Miami-Dade County, Office) and Police Impact Fee (City of Miami Gardens, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water In-Plant Fee (NMB Water), Sewer Connection Charge (Miami-Dade WASD), Sanitary Sewer Connection Charge (NMB Water), and Water Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$2.73/sq ft
  • Fire Flow Demand Charge (NMB Water)
    NMB Water (City of North Miami Beach)
    NMB Code Sec. 19-23 'Fire Flow Demand Charge on New Buildings and Conversions', Ord. 2025-06 eff. 9/8/2025. GRADUATED per-sq-ft ladder for 'Commercial and Other Uses Not Mentioned or Expected': first 100,000 sf $2.73/sf; next 100,000 sf $2.18; next 200,000 sf $1.64; next 200,000 sf $1.09; thereafter $0.55. Canonical 50,000 sf commercial / 25,000 sf office / general light industrial all fall entirely in the first-100,000-sf tier at $2.73/sf. (Multi-family/hotels/schools tier is a separate, lower ladder: $1.64/$1.24/$0.83/$0.40/$0.28.) Applies only in NMB Water's Miami Gardens service area (Bunche Park). Stacks with the Sec. 19-22 in-plant fee.
    $2.73/sq ft
  • Water In-Plant Fee (NMB Water)
    NMB Water (City of North Miami Beach)
    NMB Code Sec. 19-22 ('Additional Charge for Expansion and Upgrading of City's Water Facilities'), as updated by Ord. 2025-06, eff. 9/8/2025: 'Each future builder, developer, and owner of new construction... will be charged and pay to the City of North Miami Beach a sum to be computed on the basis of the estimated gallonage. Each gallon per day - seven dollars and fifty-two cents ($7.52).' Applies only in NMB Water's retail service area, which in Miami Gardens is the Bunche Park area. NMB also levies a separate Fire Flow Demand Charge per sq ft (see that record) - the two stack.
    Contact jurisdiction/utility to verify
  • Water Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Water Fees and Charges, eff. 10/1/2025, item 9: 'Connection Charge Rate - Per average daily gallon $1.39'. NO meter ladder - nonres average daily gallonage is assigned by land use under County Code Sec. 24-43.1(5) (WASD Table 1, Types of Land Use: Office Buildings, Retail, Shopping Center/Mall, Industrial - Warehouse/Spec. Bldg./Wet/Dry, all coded NR). Adopted by Implementing Order 4-110. PROVIDER SPLIT: WASD serves most of Miami Gardens; NMB Water (City of North Miami Beach) serves the Bunche Park area (bounded by NW 17th-32nd Aves and NW 151st-167th Sts, per the City's CDMP Infrastructure Element) - see the separate NMB Water records. Opa-locka is NO LONGER a provider (it transitioned its water utility to WASD); the 2016 CDMP listing it is stale.
    Contact jurisdiction/utility to verify
Sewer$0.00
  • Sewer Connection Charge (Miami-Dade WASD)
    Miami-Dade Water and Sewer Department (WASD)
    WASD Schedule of Wastewater Fees and Charges, eff. 10/1/2025, item 4: 'Connection Charge Rate - Per average daily gallon $5.60' ($2.80/gal for customers using a graywater disposal system). NO meter ladder; nonres gpd assigned by land use under County Code Sec. 24-43.1(5). WASD provides regional wastewater treatment countywide; NMB has no treatment plant but does levy its own sanitary sewer connection charge in its collection service area (separate record).
    Contact jurisdiction/utility to verify
  • Sanitary Sewer Connection Charge (NMB Water)
    NMB Water (City of North Miami Beach)
    NMB Code Sec. 19-31 'Rates & Charges', Ord. 2025-06 eff. 9/8/2025: 'There is a charge of five dollars and seventy-seven cents ($5.77) per average daily rated gallon for any given connection.' Applies only in NMB's collection service area within Miami Gardens (Bunche Park). NMB owns no treatment plant - wastewater is treated regionally by WASD.
    Contact jurisdiction/utility to verify
City$0.37/sq ft
  • Police Impact Fee (City of Miami Gardens, Office)
    City of Miami Gardens
    City Building Fee Schedule (rev. 09/11/2024) Sec. E.4: 'POLICE - Non-Residential - Each s/f $.37' - one flat nonres rate, all land uses. LDC Sec. 34-97. UNCONFIRMED: no adopting ordinance/effective date published, and the county schedule prints $0.4777/sf for nonres police. Call (305) 622-8000.
    $0.37/sq ftRequires confirmation
County$19.03/sq ft
  • Multimodal Mobility Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Code Ch. 33E; countywide. Context Zone 3 DERIVED from Sec. 33E-7.1 metes-and-bounds (city not named in any zone list). Schedule row: 'General Office, 1-50,000 gsf' Zone 3 = $18.607/sf (Z1 $17.610 / Z2 $16.954 / Z4 $19.422). Eff. 12/31/2023-12/30/2027; excl. 2% admin fee. UNCONFIRMED - Zone 1 SMART-corridor overlay is parcel-specific. (786) 315-2670.
    $18.61/sq ftRequires confirmation
  • Fire-Rescue Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    Code Sec. 33J-1(b); Miami Gardens is inside the Miami-Dade Fire Rescue District. Office $0.4191/sf. Eff. 12/31/2024-12/30/2027.
    $0.42/sq ft
  • Police Impact Fee (Miami-Dade County, Office)
    Miami-Dade County
    $0 CONFIRMED as a COUNTY fee. Sec. 33I-1(b) - unincorporated Miami-Dade only. Miami Gardens levies the police fee itself (City record).
    $0.00
Total (Miami Gardens): $22.13/sq ft (≈ $553,152.50 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Miami-Dade County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Miami-Dade County$487,595.00Includes unconfirmed feesAventura$475,652.50Includes unconfirmed feesBal Harbour$476,204.50Includes unconfirmed feesBay Harbor Islands$435,627.50Includes unconfirmed feesBiscayne Park$476,527.50Includes unconfirmed feesCoral Gables$569,620.00Cutler Bay$487,652.50Includes unconfirmed feesDoral$480,002.50El Portal$475,652.50Includes unconfirmed feesFlorida City$690,247.50Includes unconfirmed feesGolden Beach$475,652.50Includes unconfirmed feesHialeah$493,483.00Hialeah Gardens$475,652.50Includes unconfirmed feesHomestead$509,687.06Includes unconfirmed feesIndian Creek$434,327.50Includes unconfirmed feesKey Biscayne$423,850.00Medley$481,952.50Includes unconfirmed feesMiami$485,405.00Includes unconfirmed feesMiami Beach$543,500.00
Miami Gardens$553,152.50this pageIncludes unconfirmed fees
Miami Lakes$530,854.00Includes unconfirmed feesMiami Shores$434,327.50Includes unconfirmed feesMiami Springs$434,327.50Includes unconfirmed feesNorth Bay Village$436,249.53Includes unconfirmed feesNorth Miami$648,200.50Includes unconfirmed feesNorth Miami Beach$546,424.50Includes unconfirmed feesOpa-locka$486,590.50Includes unconfirmed feesPalmetto Bay$687,177.50Includes unconfirmed feesPinecrest$475,652.50Includes unconfirmed feesSouth Miami$475,652.50Includes unconfirmed feesSunny Isles Beach$570,427.50Includes unconfirmed feesSurfside$434,327.50Includes unconfirmed feesSweetwater$565,502.50Includes unconfirmed feesVirginia Gardens$475,652.50Includes unconfirmed feesWest Miami$475,652.50Includes unconfirmed fees

Estimate your project in Miami Gardens

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Miami Gardens, Florida?

A new single-family home in Miami Gardens pays at least $13,718.45 per unit in combined impact fees (rates sourced July 14, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Miami Gardens?

Commercial development in Miami Gardens pays $16.33 per square foot in impact fees, at least $816,260.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Miami Gardens charge its own impact fees?

Yes. Miami Gardens levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Miami Gardens, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000