Biscayne Park impact fees by project type
Biscayne Park: Single-Family Impact Fees
A new single-family home in Biscayne Park pays at least $13,718.45 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $12,250.55 and municipal or utility fees for $1,467.90.
The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Sewer Connection Charge (Miami-Dade WASD) ($1,176.00).
Parks & Recreation Impact Fee (Village of Biscayne Park) and Police Impact Fee (Village of Biscayne Park) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD)$291.90Miami-Dade Water & Sewer DeptWASD water connection charge = $1.39/avg daily gallon (eff. Oct 1, 2024). Standard SFR under 3,001 sq ft = 210 gpd → $291.90. WASD serves Biscayne Park.
- Sewer Connection Charge (Miami-Dade WASD)$1,176.00Miami-Dade Water & Sewer DeptWASD wastewater connection charge = $5.60/avg daily gallon (eff. Oct 1, 2024). Standard SFR 210 gpd → $1,176.00. WASD serves Biscayne Park.
- Parks & Recreation Impact Fee (Village of Biscayne Park)Requires confirmationVillage of Biscayne ParkPark impact fee collected by the city, not the county (county only collects Park/Police for Palmetto Bay & Miami Lakes). Biscayne Park responsible for any park impact fee; amount pending village fee schedule. Contact Biscayne Park Village Hall 305-899-8000.
- Police Impact Fee (Village of Biscayne Park)Requires confirmationVillage of Biscayne ParkPolice impact fee collected by the city, not the county. Biscayne Park has its own police dept; amount pending village fee schedule. Contact Biscayne Park Village Hall 305-899-8000.
- Road (Mobility) Impact Fee (Miami-Dade County)$9,275.00Miami-Dade CountyCounty Road/Mobility, SF Detached, Context Zone 2 (representative). Z1 $9,633 / Z2 $9,275 / Z3 $10,179 / Z4 $10,625. Paid countywide to Miami-Dade County. Sched eff. Dec 31 2023–Dec 30 2027. Verify context zone per parcel.
- Educational Facilities (School) Impact Fee (Miami-Dade County)$2,448.00Miami-Dade County Public SchoolsCounty Educational Facilities = $612/unit + $0.918/gsf (cap 3,800 gsf). Example 2,000 gsf SFR = $2,448. Countywide. Sched eff. Dec 31 2024–Dec 30 2027.
- Fire-Rescue Impact Fee (Miami-Dade County)$527.55Miami-Dade CountyCounty Fire-Rescue, SFR $527.55. Biscayne Park served by Miami-Dade Fire Rescue → county fire applies. Sched eff. Dec 31 2024–Dec 30 2027.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Biscayne Park: Multifamily Impact Fees
A new multifamily unit in Biscayne Park pays at least $6,548.20 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $5,604.55 and municipal or utility fees for $943.65.
The largest line items are Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF) ($4,465.00), Sewer Connection Charge (Miami-Dade WASD) (MF) ($756.00) and Educational Facilities (School) Impact Fee (Miami-Dade County) (MF) ($612.00).
Police Impact Fee (Village of Biscayne Park, MF) and Parks & Recreation Impact Fee (Village of Biscayne Park, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD) (MF)$187.65Miami-Dade Water & Sewer DeptWASD water connection charge = $1.39/avg daily gallon. Apartment/MF unit = 135 gpd → $187.65. WASD serves Biscayne Park.
- Sewer Connection Charge (Miami-Dade WASD) (MF)$756.00Miami-Dade Water & Sewer DeptWASD wastewater connection charge = $5.60/avg daily gallon. Apartment/MF unit = 135 gpd → $756.00. WASD serves Biscayne Park.
- Police Impact Fee (Village of Biscayne Park, MF)Requires confirmationVillage of Biscayne ParkPolice fee city-collected, not county. Biscayne Park police impact fee amount pending village fee schedule. Contact Biscayne Park Village Hall 305-899-8000.
- Parks & Recreation Impact Fee (Village of Biscayne Park, MF)Requires confirmationVillage of Biscayne ParkPark fee city-collected, not county. Biscayne Park park impact fee amount pending village fee schedule. Contact Biscayne Park Village Hall 305-899-8000.
- Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF)$4,465.00Miami-Dade CountyCounty Road/Mobility, MF Mid/High-Rise (same rate), Context Zone 2 (representative). Z1 $4,638 / Z2 $4,465 / Z3 $4,901 / Z4 $5,115. Default tier (3+ stories). Countywide.
- Educational Facilities (School) Impact Fee (Miami-Dade County) (MF)$612.00Miami-Dade County Public SchoolsCounty Educational Facilities fee = $612/unit + $0.918/gsf. Countywide. Sched eff. Dec 31 2024–Dec 30 2027.
- Fire-Rescue Impact Fee (Miami-Dade County) (MF)$527.55Miami-Dade CountyCounty Fire-Rescue, MF $527.55. Biscayne Park served by Miami-Dade Fire Rescue → county fire applies.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Biscayne Park: Commercial Impact Fees
Commercial development in Biscayne Park pays $13.23 per square foot in impact fees, plus $875.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $662,135.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tapping Charge (City of North Miami) — 1" meter ($875.00 one-time) and Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).
Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Charge (City of North Miami) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Tapping Charge (City of North Miami) — 1" meter$875.00 one-timeCity of North MiamiWater in Biscayne Park is supplied by the CITY OF NORTH MIAMI (the village's own Water page says so and the village code has no utilities chapter). North Miami Code Sec. 19-97 tapping charges (Ord. No. 1473, 10-26-21) — ONE shared meter ladder for all customer classes, so the nonres charge equals the residential charge at the same meter size (shared-ladder precedent, not contamination). 3-inch and greater: 'By estimate'. Sec. 19-97(b) caps domestic meters at 1 inch.
- Sewer Connection Charge (City of North Miami)Requires confirmationCity of North MiamiUNCONFIRMED — no sewer connection/capacity charge is published anywhere. North Miami Code Sec. 19-168, which set sewer connection charges, was REPEALED by Ord. No. 1311 (11-14-2010) and never replaced; Ch. 19 Art. IV now contains no dollar figure, and the city's posted Fees & Charges page (FY2025-26 rates eff. 10/1/2025) publishes only recurring consumption and base charges. Sanitary sewer in much of Biscayne Park is also on septic. Confirm the provider and any capacity charge with North Miami Utility Billing, (305) 895-9880 / Public Works (305) 895-9840.
- Municipal Impact Fee (Village of Biscayne Park, Commercial)$0.00Village of Biscayne ParkConfirmed $0. Proved from the village's COMPLETE Municode chapter list — Chs. 1, 2, 3, 5, 6, 6.5, 9, 10, 11, 13, 16, 17 plus Appendix A (Land Development Code). There is no impact-fee chapter and no utilities chapter anywhere in the code, and the LDC's Part III (Chs. 13-19, incl. Ch. 17 'Fees, Bonds and Charges') contains no occurrence of 'impact fee' — LDC Sec. 17.1.1 puts all village fees on a resolution schedule kept in the clerk's office, and Sec. 17.2 covers building permit fees only. The village levies no impact fee of any kind and runs no water or sewer utility.
- Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)$12.66/sq ftRequires confirmationMiami-Dade CountyUNCONFIRMED (context zone). Miami-Dade County Impact Fees Rate Schedule, mobility rates eff. 12/31/2023-12/30/2027; schedule row: Shopping Plaza (40-150 kgsf) w/o Supermarket. Context Zone 3 rate entered. Code Sec. 33E-7.1 defines the four context zones by metes-and-bounds, not municipal boundary, and does not name Biscayne Park; Zone 1 is a SMART-corridor overlay that can reach any parcel. Full-scale zone maps are on file with the County Zoning Dept only. Zone 1/2/4 rates for this row: $11.982 / $11.537 / $13.216. Verify the parcel's zone with Impact Fee Section, (786) 315-2670. Excludes the 2% administrative fee.
- Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial)$0.56/sq ftMiami-Dade CountyMiami-Dade County Impact Fees Rate Schedule, FIRE column (eff. 12/31/2024-12/30/2027), Retail-category rate. Biscayne Park has no municipal fire department (Code Ch. 6 Fire Prevention only) and is served by Miami-Dade Fire Rescue, so the county fire fee applies.
- Police Services Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade CountyConfirmed $0. The county police services impact fee ($0.4777/sf nonres) is collected only in the unincorporated area and in the municipalities policed by MDPD under contract (Palmetto Bay, Miami Lakes). Biscayne Park has its own police department.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Biscayne Park: Industrial Impact Fees
Industrial development in Biscayne Park pays $6.93 per square foot in impact fees, plus $875.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $347,555.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Tapping Charge (City of North Miami) — 1" meter ($875.00 one-time) and Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft).
Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Charge (City of North Miami) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Tapping Charge (City of North Miami) — 1" meter$875.00 one-timeCity of North MiamiWater in Biscayne Park is supplied by the CITY OF NORTH MIAMI (the village's own Water page says so and the village code has no utilities chapter). North Miami Code Sec. 19-97 tapping charges (Ord. No. 1473, 10-26-21) — ONE shared meter ladder for all customer classes, so the nonres charge equals the residential charge at the same meter size (shared-ladder precedent, not contamination). 3-inch and greater: 'By estimate'. Sec. 19-97(b) caps domestic meters at 1 inch.
- Sewer Connection Charge (City of North Miami)Requires confirmationCity of North MiamiUNCONFIRMED — no sewer connection/capacity charge is published anywhere. North Miami Code Sec. 19-168, which set sewer connection charges, was REPEALED by Ord. No. 1311 (11-14-2010) and never replaced; Ch. 19 Art. IV now contains no dollar figure, and the city's posted Fees & Charges page (FY2025-26 rates eff. 10/1/2025) publishes only recurring consumption and base charges. Sanitary sewer in much of Biscayne Park is also on septic. Confirm the provider and any capacity charge with North Miami Utility Billing, (305) 895-9880 / Public Works (305) 895-9840.
- Municipal Impact Fee (Village of Biscayne Park, Industrial)$0.00Village of Biscayne ParkConfirmed $0 — no impact-fee chapter in the village's complete Municode chapter list. Biscayne Park is an entirely residential village with no industrial zoning district.
- Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)$5.22/sq ftRequires confirmationMiami-Dade CountyUNCONFIRMED (context zone). Schedule row: General Light Industrial. Context Zone 3 rate entered; Biscayne Park is not named in any Sec. 33E-7.1 zone list. Zone 1/2/4 rates: $4.944 / $4.760 / $5.453. Verify parcel zone with the county Impact Fee Section, (786) 315-2670. Excludes the 2% administrative fee.
- Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial)$1.71/sq ftMiami-Dade CountyMiami-Dade County Impact Fees Rate Schedule, FIRE column, Industrial-category rate. MDFR serves Biscayne Park (no municipal FD).
- Police Services Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade CountyConfirmed $0 — Biscayne Park runs its own police department; county police impact fee applies only to the unincorporated area, Palmetto Bay and Miami Lakes.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Biscayne Park: Office Impact Fees
Office development in Biscayne Park pays $19.03 per square foot in impact fees, plus $875.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $476,527.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Tapping Charge (City of North Miami) — 1" meter ($875.00 one-time) and Fire and Emergency Services Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).
Multimodal Mobility Impact Fee (Miami-Dade County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Charge (City of North Miami) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water Tapping Charge (City of North Miami) — 1" meter$875.00 one-timeCity of North MiamiWater in Biscayne Park is supplied by the CITY OF NORTH MIAMI (the village's own Water page says so and the village code has no utilities chapter). North Miami Code Sec. 19-97 tapping charges (Ord. No. 1473, 10-26-21) — ONE shared meter ladder for all customer classes, so the nonres charge equals the residential charge at the same meter size (shared-ladder precedent, not contamination). 3-inch and greater: 'By estimate'. Sec. 19-97(b) caps domestic meters at 1 inch.
- Sewer Connection Charge (City of North Miami)Requires confirmationCity of North MiamiUNCONFIRMED — no sewer connection/capacity charge is published anywhere. North Miami Code Sec. 19-168, which set sewer connection charges, was REPEALED by Ord. No. 1311 (11-14-2010) and never replaced; Ch. 19 Art. IV now contains no dollar figure, and the city's posted Fees & Charges page (FY2025-26 rates eff. 10/1/2025) publishes only recurring consumption and base charges. Sanitary sewer in much of Biscayne Park is also on septic. Confirm the provider and any capacity charge with North Miami Utility Billing, (305) 895-9880 / Public Works (305) 895-9840.
- Municipal Impact Fee (Village of Biscayne Park, Office)$0.00Village of Biscayne ParkConfirmed $0 — no impact-fee chapter in the village's complete Municode chapter list; LDC Ch. 17 (Fees, Bonds and Charges) contains no impact fee.
- Multimodal Mobility Impact Fee (Miami-Dade County, Office)$18.61/sq ftRequires confirmationMiami-Dade CountyUNCONFIRMED (context zone). Schedule row: General Office, 1-50,000 gsf. Context Zone 3 rate entered; Biscayne Park is not named in any Sec. 33E-7.1 zone list. Zone 1/2/4 rates: $17.610 / $16.954 / $19.422. Verify parcel zone with the county Impact Fee Section, (786) 315-2670. Excludes the 2% administrative fee.
- Fire and Emergency Services Impact Fee (Miami-Dade County, Office)$0.42/sq ftMiami-Dade CountyMiami-Dade County Impact Fees Rate Schedule, FIRE column, Office-category rate. MDFR serves Biscayne Park (no municipal FD).
- Police Services Impact Fee (Miami-Dade County, Office)$0.00Miami-Dade CountyConfirmed $0 — Biscayne Park runs its own police department; county police impact fee applies only to the unincorporated area, Palmetto Bay and Miami Lakes.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Biscayne Park
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Biscayne Park, Florida?
A new single-family home in Biscayne Park pays at least $13,718.45 per unit in combined impact fees (rates sourced July 14, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Biscayne Park?
Commercial development in Biscayne Park pays $13.23 per square foot in impact fees, plus $875.00 in one-time water and sewer connection fees, at least $662,135.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Biscayne Park charge its own impact fees?
Yes. Biscayne Park levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Biscayne Park, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.