North Miami impact fees by project type
North Miami: Single-Family Impact Fees
A new single-family home in North Miami pays $23,539.55 per unit in impact fees (rates sourced August 5, 2026). Of that, Miami-Dade County-levied fees account for $2,975.55 and municipal or utility fees for $20,564.00.
The largest line items are Water Impact Fee (City of North Miami) ($6,344.00), Mobility Fee (City of North Miami) ($4,920.00) and Parks & Recreation (incl. Library) Impact Fee (City of North Miami) ($4,112.00).
View the full North Miami impact fee schedule
- Water Impact Fee (City of North Miami)$6,344.00City of North Miami
- Sewer Impact Fee (City of North Miami)$1,768.00City of North Miami
- Mobility Fee (City of North Miami)$4,920.00City of North Miami
- Parks & Recreation (incl. Library) Impact Fee (City of North Miami)$4,112.00City of North Miami
- General Government (incl. Police) Impact Fee (City of North Miami)$1,860.00City of North Miami
- Stormwater Impact Fee (City of North Miami) — $0.78/sf impervious x 2,000 sf$1,560.00City of North MiamiNorth Miami charges a one-time stormwater impact fee on new construction of $0.78 per square foot of impervious surface (roofs, driveways, and other paved areas), paid at building permit. For a typical new house with about 2,000 square feet of impervious area, that works out to roughly $1,560; the exact amount depends on your project's actual footprint.
- Educational Facilities (School) Impact Fee (Miami-Dade County)$2,448.00Miami-Dade County / School Board
- Fire-Rescue Impact Fee (Miami-Dade County)$527.55Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Miami: Multifamily Impact Fees
A new multifamily unit in North Miami pays at least $16,696.55 per unit in impact fees (rates sourced August 5, 2026). Of that, Miami-Dade County-levied fees account for $2,057.55 and municipal or utility fees for $14,639.00.
The largest line items are Parks & Recreation (incl. Library) Impact Fee (City of North Miami, MF) ($2,780.00), Mobility Fee (City of North Miami, MF) ($2,460.00) and Educational Facilities (School) Impact Fee (Miami-Dade County, MF) ($1,530.00).
Sewer Impact Fee (City of North Miami, MF) and Water Impact Fee (City of North Miami, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Stormwater Impact Fee (City of North Miami, MF) — $0.78/sf impervious (per-unit basis unresolved) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full North Miami impact fee schedule
- $6,344.00Requires confirmation
- $1,768.00Requires confirmation
- Parks & Recreation (incl. Library) Impact Fee (City of North Miami, MF)$2,780.00City of North Miami
- $2,460.00
- General Government (incl. Police) Impact Fee (City of North Miami, MF)$1,287.00City of North Miami
- Stormwater Impact Fee (City of North Miami, MF) — $0.78/sf impervious (per-unit basis unresolved)Requires confirmationCity of North Miami
- Educational Facilities (School) Impact Fee (Miami-Dade County, MF)$1,530.00Miami-Dade County / School BoardMiami-Dade County educational facilities (school) impact fee, charged countywide including all municipalities. $612 per unit plus $0.918 per sq ft; shown here for a 1,000 sq ft unit ($1,530). Current schedule effective 12/31/2024 through 12/30/2027.
- Fire-Rescue Impact Fee (Miami-Dade County, MF)$527.55Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Miami: Commercial Impact Fees
Commercial development in North Miami pays $19.76 per square foot in impact fees, plus $13,548.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to about $1,001,308.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of North Miami) — 1" disc meter ($10,595.00 one-time), Sewer Impact Fee (City of North Miami) — 1" non-turbine meter ($2,953.00 one-time) and Mobility Fee (City of North Miami, Commercial) ($3.43/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full North Miami impact fee schedule
- Water Impact Fee (City of North Miami) — 1" disc meter$10,595.00 one-timeCity of North MiamiOne-time water impact fee charged by the City of North Miami, which runs its own water utility (service area extends beyond the city limits). Set by meter size and type (disc vs. turbine); the amount shown is for a 1-inch disc meter — see the other tiers. Phase Two rates are effective April 1, 2026 through March 31, 2027.
- Sewer Impact Fee (City of North Miami) — 1" non-turbine meter$2,953.00 one-timeCity of North MiamiOne-time sewer impact fee charged by the City of North Miami, which runs its own sewer utility (service area extends beyond the city limits). Set by water meter size and type (non-turbine vs. turbine); the amount shown is for a 1-inch non-turbine meter — see the other tiers. Phase Two rates are effective April 1, 2026 through March 31, 2027.
- Mobility Fee (City of North Miami, Commercial)$3.43/sq ftCity of North Miami
- $3.10/sq ft
- Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)$12.66/sq ftRequires confirmationMiami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County, Commercial)$0.56/sq ftMiami-Dade County
- Police Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Miami: Industrial Impact Fees
Industrial development in North Miami pays $9.50 per square foot in impact fees, plus $13,548.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to about $488,778.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of North Miami) — 1" disc meter ($10,595.00 one-time), Sewer Impact Fee (City of North Miami) — 1" non-turbine meter ($2,953.00 one-time) and Mobility Fee (City of North Miami, Industrial) ($2.29/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full North Miami impact fee schedule
- Water Impact Fee (City of North Miami) — 1" disc meter$10,595.00 one-timeCity of North MiamiOne-time water impact fee charged by the City of North Miami, which runs its own water utility (service area extends beyond the city limits). Set by meter size and type (disc vs. turbine); the amount shown is for a 1-inch disc meter — see the other tiers. Phase Two rates are effective April 1, 2026 through March 31, 2027.
- Sewer Impact Fee (City of North Miami) — 1" non-turbine meter$2,953.00 one-timeCity of North MiamiOne-time sewer impact fee charged by the City of North Miami, which runs its own sewer utility (service area extends beyond the city limits). Set by water meter size and type (non-turbine vs. turbine); the amount shown is for a 1-inch non-turbine meter — see the other tiers. Phase Two rates are effective April 1, 2026 through March 31, 2027.
- Mobility Fee (City of North Miami, Industrial)$2.29/sq ftCity of North Miami
- $0.28/sq ft
- Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)$5.22/sq ftRequires confirmationMiami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County, Industrial)$1.71/sq ftMiami-Dade County
- Police Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Miami: Office Impact Fees
Office development in North Miami pays $25.39 per square foot in impact fees, plus $13,548.00 in one-time water and sewer connection fees (rates sourced August 5, 2026).
For a 25,000 sq ft building, that comes to about $648,200.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of North Miami) — 1" disc meter ($10,595.00 one-time), Sewer Impact Fee (City of North Miami) — 1" non-turbine meter ($2,953.00 one-time) and Mobility Fee (City of North Miami, Office) ($4.57/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Multimodal Mobility Impact Fee (Miami-Dade County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the full North Miami impact fee schedule
- Water Impact Fee (City of North Miami) — 1" disc meter$10,595.00 one-timeCity of North MiamiOne-time water impact fee charged by the City of North Miami, which runs its own water utility (service area extends beyond the city limits). Set by meter size and type (disc vs. turbine); the amount shown is for a 1-inch disc meter — see the other tiers. Phase Two rates are effective April 1, 2026 through March 31, 2027.
- Sewer Impact Fee (City of North Miami) — 1" non-turbine meter$2,953.00 one-timeCity of North MiamiOne-time sewer impact fee charged by the City of North Miami, which runs its own sewer utility (service area extends beyond the city limits). Set by water meter size and type (non-turbine vs. turbine); the amount shown is for a 1-inch non-turbine meter — see the other tiers. Phase Two rates are effective April 1, 2026 through March 31, 2027.
- Mobility Fee (City of North Miami, Office)$4.57/sq ftCity of North Miami
- General Government (incl. Police) Impact Fee (City of North Miami, Office)$1.79/sq ftCity of North Miami
- Multimodal Mobility Impact Fee (Miami-Dade County, Office)$18.61/sq ftRequires confirmationMiami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County, Office)$0.42/sq ftMiami-Dade County
- Police Impact Fee (Miami-Dade County, Office)$0.00Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
North Miami impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
North Miami impact fee FAQs
What are the total impact fees for a single-family home in North Miami, Florida?
A new single-family home in North Miami pays $23,539.55 per unit in combined impact fees (rates sourced August 5, 2026).
How much are commercial impact fees in North Miami?
Commercial development in North Miami pays $19.76 per square foot in impact fees, plus $13,548.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $1,001,308.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does North Miami charge its own impact fees?
Yes. North Miami levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in North Miami, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.