Cutler Bay impact fees by project type
Cutler Bay: Single-Family Impact Fees
A new single-family home in Cutler Bay pays at least $13,718.45 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $12,250.55 and municipal or utility fees for $1,467.90.
The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Sewer Connection Charge (Miami-Dade WASD) ($1,176.00).
Police Impact Fee (Town of Cutler Bay) and Parks & Recreation Impact Fee (Town of Cutler Bay) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD)$291.90Miami-Dade Water & Sewer DeptWASD water connection charge = $1.39/avg daily gallon (eff. Oct 1, 2024). Standard SFR under 3,001 sq ft = 210 gpd → $291.90. WASD serves Cutler Bay.
- Sewer Connection Charge (Miami-Dade WASD)$1,176.00Miami-Dade Water & Sewer DeptWASD wastewater connection charge = $5.60/avg daily gallon (eff. Oct 1, 2024). Standard SFR 210 gpd → $1,176.00. WASD serves Cutler Bay.
- Police Impact Fee (Town of Cutler Bay)Requires confirmationTown of Cutler BayPolice impact fee collected by the city, not the county. Cutler Bay contracts police via MDPD but any municipal police impact fee is town-collected; amount pending town fee schedule. Contact Cutler Bay Town Hall 305-234-4262.
- Parks & Recreation Impact Fee (Town of Cutler Bay)Requires confirmationTown of Cutler BayPark impact fee collected by the city, not the county (county only collects Park/Police for Palmetto Bay & Miami Lakes). Cutler Bay responsible for any park impact fee; amount pending town fee schedule. Contact Cutler Bay Town Hall 305-234-4262.
- Road (Mobility) Impact Fee (Miami-Dade County)$9,275.00Miami-Dade CountyCounty Road/Mobility, SF Detached, Context Zone 2 (representative). Z1 $9,633 / Z2 $9,275 / Z3 $10,179 / Z4 $10,625. Paid countywide to Miami-Dade County. Sched eff. Dec 31 2023–Dec 30 2027. Verify context zone per parcel.
- Educational Facilities (School) Impact Fee (Miami-Dade County)$2,448.00Miami-Dade County Public SchoolsCounty Educational Facilities = $612/unit + $0.918/gsf (cap 3,800 gsf). Example 2,000 gsf SFR = $2,448. Countywide. Sched eff. Dec 31 2024–Dec 30 2027.
- Fire-Rescue Impact Fee (Miami-Dade County)$527.55Miami-Dade CountyCounty Fire-Rescue, SFR $527.55. Cutler Bay served by Miami-Dade Fire Rescue → county fire applies. Sched eff. Dec 31 2024–Dec 30 2027.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cutler Bay: Multifamily Impact Fees
A new multifamily unit in Cutler Bay pays at least $6,548.20 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $5,604.55 and municipal or utility fees for $943.65.
The largest line items are Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF) ($4,465.00), Sewer Connection Charge (Miami-Dade WASD) (MF) ($756.00) and Educational Facilities (School) Impact Fee (Miami-Dade County) (MF) ($612.00).
Police Impact Fee (Town of Cutler Bay, MF) and Parks & Recreation Impact Fee (Town of Cutler Bay, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD) (MF)$187.65Miami-Dade Water & Sewer DeptWASD water connection charge = $1.39/avg daily gallon. Apartment/MF unit = 135 gpd → $187.65. WASD serves Cutler Bay.
- Sewer Connection Charge (Miami-Dade WASD) (MF)$756.00Miami-Dade Water & Sewer DeptWASD wastewater connection charge = $5.60/avg daily gallon. Apartment/MF unit = 135 gpd → $756.00. WASD serves Cutler Bay.
- Police Impact Fee (Town of Cutler Bay, MF)Requires confirmationTown of Cutler BayPolice fee city-collected, not county. Cutler Bay police impact fee amount pending town fee schedule. Contact Cutler Bay Town Hall 305-234-4262.
- Parks & Recreation Impact Fee (Town of Cutler Bay, MF)Requires confirmationTown of Cutler BayPark fee city-collected, not county. Cutler Bay park impact fee amount pending town fee schedule. Contact Cutler Bay Town Hall 305-234-4262.
- Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF)$4,465.00Miami-Dade CountyCounty Road/Mobility, MF Mid/High-Rise (same rate), Context Zone 2 (representative). Z1 $4,638 / Z2 $4,465 / Z3 $4,901 / Z4 $5,115. Default tier (3+ stories). Countywide.
- Educational Facilities (School) Impact Fee (Miami-Dade County) (MF)$612.00Miami-Dade County Public SchoolsCounty Educational Facilities fee = $612/unit + $0.918/gsf. Countywide. Sched eff. Dec 31 2024–Dec 30 2027.
- Fire-Rescue Impact Fee (Miami-Dade County) (MF)$527.55Miami-Dade CountyCounty Fire-Rescue, MF $527.55. Cutler Bay served by Miami-Dade Fire Rescue → county fire applies.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cutler Bay: Commercial Impact Fees
Commercial development in Cutler Bay pays $13.96 per square foot in impact fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $697,760.00. The calculator below adjusts to your exact square footage.
The largest line items are Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).
Multimodal Mobility Impact Fee (Miami-Dade County, Commercial) and Municipal Impact Fee (Town of Cutler Bay, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Connection Charge (Miami-Dade WASD) and Water Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD)Contact jurisdiction/utility to verifyMiami-Dade Water and Sewer DepartmentCutler Bay runs no utility; water and sewer are supplied by Miami-Dade WASD (its code has no utilities chapter). WASD prices NONRESIDENTIAL connection charges PER AVERAGE DAILY GALLON of estimated demand — there is no nonres meter-size ladder. $1.39 per gallon per day (water).
- Sewer Connection Charge (Miami-Dade WASD)Contact jurisdiction/utility to verifyMiami-Dade Water and Sewer DepartmentMiami-Dade WASD nonresidential sewer connection charge: $5.60 per average daily gallon of estimated demand. No meter-size ladder for nonres. WASD is Cutler Bay's water and sewer provider.
- Municipal Impact Fee (Town of Cutler Bay, Commercial)$0.73/sq ftRequires confirmationTown of Cutler BayCutler Bay Code Ch. 3 Art. XVI, Sec. 3-253 (Ord. No. 09-15, 10-21-2009): combined roads + police + public buildings + parks impact fee on all new development, per sq ft. Published Commercial TOTAL = $0.73/sf; entered here. UNCONFIRMED — the codified table does not foot: its components (Roads $0.42 + Police $0.05 + Public Buildings $0.10 + Parks $0.00) sum to $0.57, exactly $0.16/sf below the printed Total, and the SAME $0.16 gap appears on every row of the table (residential and all six nonres rows), indicating a fee column dropped in codification. The Total is used because it is what the town collects. Parks is expressly $0.00 for all nonres categories. No indexed or updated schedule is posted. Confirm the true components and current rate with the Building Division, (305) 234-4262.
- Multimodal Mobility Impact Fee (Miami-Dade County, Commercial)$12.66/sq ftRequires confirmationMiami-Dade CountyUNCONFIRMED (context zone). Rate schedule row: Shopping Plaza (40-150 kgsf) w/o Supermarket; mobility rates eff. 12/31/2023-12/30/2027. Context Zone 3 rate entered. Code Sec. 33E-7.1 defines the zones by metes-and-bounds, not municipal line, and does not name Cutler Bay; given the town's far-south location the Zone 4 rate ($13.216) is also plausible. Zone 1/2/4 for this row: $11.982 / $11.537 / $13.216. Verify parcel zone with the county Impact Fee Section, (786) 315-2670. Excludes the 2% administrative fee.
- Fire and Emergency Services Impact Fee (Miami-Dade County, Commercial)$0.56/sq ftMiami-Dade CountyMiami-Dade County Impact Fees Rate Schedule, FIRE column (eff. 12/31/2024-12/30/2027), Retail-category rate. Code Sec. 33J-1(b): the fire/EMS impact fee applies 'throughout the district including unincorporated Miami-Dade County and all municipalities served by the district.' Cutler Bay has no municipal fire department and is served by Miami-Dade Fire Rescue.
- Police Services Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade CountyConfirmed $0. Miami-Dade Code Sec. 33I-1(b) (Police Services Impact Fee Ordinance, Ord. 90-31): 'This chapter shall be applicable to all land development in UNINCORPORATED Miami-Dade County.' The county police impact fee does not reach any municipality — including towns policed by MDPD under contract. Cutler Bay levies its own police impact fee instead (Code Sec. 3-253).
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cutler Bay: Industrial Impact Fees
Industrial development in Cutler Bay pays $7.33 per square foot in impact fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to at least $366,680.00. The calculator below adjusts to your exact square footage.
The largest line items are Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft).
Municipal Impact Fee (Town of Cutler Bay, Industrial) and Multimodal Mobility Impact Fee (Miami-Dade County, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Connection Charge (Miami-Dade WASD) and Water Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD)Contact jurisdiction/utility to verifyMiami-Dade Water and Sewer DepartmentCutler Bay runs no utility; water and sewer are supplied by Miami-Dade WASD (its code has no utilities chapter). WASD prices NONRESIDENTIAL connection charges PER AVERAGE DAILY GALLON of estimated demand — there is no nonres meter-size ladder. $1.39 per gallon per day (water).
- Sewer Connection Charge (Miami-Dade WASD)Contact jurisdiction/utility to verifyMiami-Dade Water and Sewer DepartmentMiami-Dade WASD nonresidential sewer connection charge: $5.60 per average daily gallon of estimated demand. No meter-size ladder for nonres. WASD is Cutler Bay's water and sewer provider.
- Municipal Impact Fee (Town of Cutler Bay, Industrial)$0.40/sq ftRequires confirmationTown of Cutler BayCutler Bay Code Sec. 3-253 (Ord. No. 09-15), Industrial row: published TOTAL $0.40/sf (Roads $0.09 + Police $0.05 + Public Buildings $0.10 + Parks $0.00 = $0.24, $0.16/sf short of the printed Total — same gap on every row). UNCONFIRMED; confirm with the Building Division, (305) 234-4262.
- Multimodal Mobility Impact Fee (Miami-Dade County, Industrial)$5.22/sq ftRequires confirmationMiami-Dade CountyUNCONFIRMED (context zone). Schedule row: General Light Industrial. Context Zone 3 rate entered; Zone 4 ($5.453) plausible given Cutler Bay's southern location. Zone 1/2: $4.944 / $4.760. Verify with the county Impact Fee Section, (786) 315-2670. Excludes the 2% administrative fee.
- Fire and Emergency Services Impact Fee (Miami-Dade County, Industrial)$1.71/sq ftMiami-Dade CountyMiami-Dade County Impact Fees Rate Schedule, FIRE column, Industrial-category rate. Applies per Code Sec. 33J-1(b) — MDFR serves Cutler Bay.
- Police Services Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade CountyConfirmed $0 — Code Sec. 33I-1(b) limits the county police services impact fee to unincorporated Miami-Dade County. Cutler Bay levies its own police impact fee (Sec. 3-253).
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Cutler Bay: Office Impact Fees
Office development in Cutler Bay pays $19.51 per square foot in impact fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to at least $487,652.50. The calculator below adjusts to your exact square footage.
The largest line items are Fire and Emergency Services Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).
Multimodal Mobility Impact Fee (Miami-Dade County, Office) and Municipal Impact Fee (Town of Cutler Bay, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Connection Charge (Miami-Dade WASD) and Water Connection Charge (Miami-Dade WASD) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD)Contact jurisdiction/utility to verifyMiami-Dade Water and Sewer DepartmentCutler Bay runs no utility; water and sewer are supplied by Miami-Dade WASD (its code has no utilities chapter). WASD prices NONRESIDENTIAL connection charges PER AVERAGE DAILY GALLON of estimated demand — there is no nonres meter-size ladder. $1.39 per gallon per day (water).
- Sewer Connection Charge (Miami-Dade WASD)Contact jurisdiction/utility to verifyMiami-Dade Water and Sewer DepartmentMiami-Dade WASD nonresidential sewer connection charge: $5.60 per average daily gallon of estimated demand. No meter-size ladder for nonres. WASD is Cutler Bay's water and sewer provider.
- Municipal Impact Fee (Town of Cutler Bay, Office)$0.48/sq ftRequires confirmationTown of Cutler BayCutler Bay Code Sec. 3-253 (Ord. No. 09-15), Office row: published TOTAL $0.48/sf (Roads $0.17 + Police $0.05 + Public Buildings $0.10 + Parks $0.00 = $0.32, i.e. $0.16/sf short of the printed Total — the same gap on every row, so a fee column appears to have been dropped in codification). UNCONFIRMED; confirm with the Building Division, (305) 234-4262.
- Multimodal Mobility Impact Fee (Miami-Dade County, Office)$18.61/sq ftRequires confirmationMiami-Dade CountyUNCONFIRMED (context zone). Schedule row: General Office, 1-50,000 gsf. Context Zone 3 rate entered; Cutler Bay is not named in any Sec. 33E-7.1 zone list and its southern location makes Zone 4 ($19.422) plausible. Zone 1/2 rates: $17.610 / $16.954. Verify with the county Impact Fee Section, (786) 315-2670. Excludes the 2% administrative fee.
- Fire and Emergency Services Impact Fee (Miami-Dade County, Office)$0.42/sq ftMiami-Dade CountyMiami-Dade County Impact Fees Rate Schedule, FIRE column, Office-category rate. Applies per Code Sec. 33J-1(b) — MDFR serves Cutler Bay.
- Police Services Impact Fee (Miami-Dade County, Office)$0.00Miami-Dade CountyConfirmed $0 — Code Sec. 33I-1(b) limits the county police services impact fee to unincorporated Miami-Dade County. Cutler Bay levies its own police impact fee (Sec. 3-253).
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Cutler Bay
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Cutler Bay, Florida?
A new single-family home in Cutler Bay pays at least $13,718.45 per unit in combined impact fees (rates sourced July 14, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Cutler Bay?
Commercial development in Cutler Bay pays $13.96 per square foot in impact fees, at least $697,760.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Cutler Bay charge its own impact fees?
Yes. Cutler Bay levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cutler Bay, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.