Golden Beach impact fees by project type
Golden Beach: Single-Family Impact Fees
A new single-family home in Golden Beach pays at least $13,426.55 per unit in impact fees (rates sourced July 24, 2026). Of that, Miami-Dade County-levied fees account for $12,250.55 and municipal or utility fees for $1,176.00.
The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Sewer Connection Charge (Miami-Dade WASD) ($1,176.00).
Water Connection Charge (North Miami Beach Water) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Golden Beach impact fee schedule
- Water Connection Charge (North Miami Beach Water)Requires confirmationNorth Miami Beach Water (NMB Water)
- Sewer Connection Charge (Miami-Dade WASD)$1,176.00Miami-Dade Water & Sewer Department (WASD)
- Police Impact Fee (Town of Golden Beach)$0.00Town of Golden BeachThe Town of Golden Beach does not charge a municipal police impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Parks & Recreation Impact Fee (Town of Golden Beach)$0.00Town of Golden BeachThe Town of Golden Beach does not charge a municipal parks and recreation impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Road (Mobility) Impact Fee (Miami-Dade County)$9,275.00Miami-Dade County
- Educational Facilities (School) Impact Fee (Miami-Dade County)$2,448.00Miami-Dade County Public Schools
- Fire-Rescue Impact Fee (Miami-Dade County)$527.55Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Golden Beach: Multifamily Impact Fees
A new multifamily unit in Golden Beach pays at least $7,278.55 per unit in impact fees (rates sourced July 24, 2026). Of that, Miami-Dade County-levied fees account for $6,522.55 and municipal or utility fees for $756.00.
The largest line items are Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF) ($4,465.00), Educational Facilities (School) Impact Fee (Miami-Dade County, MF) ($1,530.00) and Sewer Connection Charge (Miami-Dade WASD, MF) ($756.00).
Water Connection Charge (North Miami Beach Water, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Golden Beach impact fee schedule
- Water Connection Charge (North Miami Beach Water, MF)Requires confirmationNorth Miami Beach Water (NMB Water)
- Sewer Connection Charge (Miami-Dade WASD, MF)$756.00Miami-Dade Water & Sewer Department (WASD)
- Police Impact Fee (Town of Golden Beach, MF)$0.00Town of Golden BeachThe Town of Golden Beach does not charge a municipal police impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Parks & Recreation Impact Fee (Town of Golden Beach, MF)$0.00Town of Golden BeachThe Town of Golden Beach does not charge a municipal parks and recreation impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF)$4,465.00Mid/High-Rise (3+ stories)Miami-Dade County
- Educational Facilities (School) Impact Fee (Miami-Dade County, MF)$1,530.00Miami-Dade County Public SchoolsMiami-Dade County educational facilities (school) impact fee, charged countywide including all municipalities. $612 per unit plus $0.918 per sq ft; shown here for a 1,000 sq ft unit ($1,530). Current schedule effective 12/31/2024 through 12/30/2027.
- Fire-Rescue Impact Fee (Miami-Dade County, MF)$527.55Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Golden Beach: Commercial Impact Fees
Commercial development in Golden Beach pays $13.23 per square foot in impact fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to at least $661,260.00. The calculator below adjusts to your exact square footage.
The largest line items are Fire-Rescue Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).
Road (Mobility) Impact Fee (Miami-Dade County, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Charge (Miami-Dade WASD) and Water Connection Charge (NMB Water) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Golden Beach impact fee schedule
- Water Connection Charge (NMB Water)Requires confirmationNorth Miami Beach Water (NMB Water)
- Sewer Connection Charge (Miami-Dade WASD)Contact jurisdiction/utility to verifyMiami-Dade Water and Sewer Department (WASD)Sewer service is provided by Miami-Dade WASD. The one-time nonresidential connection charge is $5.60 per average daily gallon of estimated demand ($2.80 with an approved graywater system); there is no meter-size ladder — the project's gallonage is assigned by land use. Rate effective October 1, 2025.
- Municipal Impact Fee (Town of Golden Beach, Commercial)$0.00Town of Golden Beach
- Road (Mobility) Impact Fee (Miami-Dade County, Commercial)$12.66/sq ftRequires confirmationMiami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County, Commercial)$0.56/sq ftMiami-Dade County Fire Rescue District
- Police Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Golden Beach: Industrial Impact Fees
Industrial development in Golden Beach pays $6.93 per square foot in impact fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to at least $346,680.00. The calculator below adjusts to your exact square footage.
The largest line items are Fire-Rescue Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft).
Road (Mobility) Impact Fee (Miami-Dade County, Industrial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Charge (Miami-Dade WASD) and Water Connection Charge (NMB Water) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Golden Beach impact fee schedule
- Water Connection Charge (NMB Water)Requires confirmationNorth Miami Beach Water (NMB Water)
- Sewer Connection Charge (Miami-Dade WASD)Contact jurisdiction/utility to verifyMiami-Dade Water and Sewer Department (WASD)Sewer service is provided by Miami-Dade WASD. The one-time nonresidential connection charge is $5.60 per average daily gallon of estimated demand ($2.80 with an approved graywater system); there is no meter-size ladder — the project's gallonage is assigned by land use. Rate effective October 1, 2025.
- Municipal Impact Fee (Town of Golden Beach, Industrial)$0.00Town of Golden Beach
- Road (Mobility) Impact Fee (Miami-Dade County, Industrial)$5.22/sq ftRequires confirmationMiami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County, Industrial)$1.71/sq ftMiami-Dade County Fire Rescue District
- Police Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Golden Beach: Office Impact Fees
Office development in Golden Beach pays $19.03 per square foot in impact fees (rates sourced July 24, 2026).
For a 25,000 sq ft building, that comes to at least $475,652.50. The calculator below adjusts to your exact square footage.
The largest line items are Fire-Rescue Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).
Road (Mobility) Impact Fee (Miami-Dade County, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Charge (Miami-Dade WASD) and Water Connection Charge (NMB Water) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full Golden Beach impact fee schedule
- Water Connection Charge (NMB Water)Requires confirmationNorth Miami Beach Water (NMB Water)
- Sewer Connection Charge (Miami-Dade WASD)Contact jurisdiction/utility to verifyMiami-Dade Water and Sewer Department (WASD)Sewer service is provided by Miami-Dade WASD. The one-time nonresidential connection charge is $5.60 per average daily gallon of estimated demand ($2.80 with an approved graywater system); there is no meter-size ladder — the project's gallonage is assigned by land use. Rate effective October 1, 2025.
- Municipal Impact Fee (Town of Golden Beach, Office)$0.00Town of Golden Beach
- Road (Mobility) Impact Fee (Miami-Dade County, Office)$18.61/sq ftRequires confirmationMiami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County, Office)$0.42/sq ftMiami-Dade County Fire Rescue District
- Police Impact Fee (Miami-Dade County, Office)$0.00Miami-Dade County
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Golden Beach impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Golden Beach impact fee FAQs
What are the total impact fees for a single-family home in Golden Beach, Florida?
A new single-family home in Golden Beach pays at least $13,426.55 per unit in combined impact fees (rates sourced July 24, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Golden Beach?
Commercial development in Golden Beach pays $13.23 per square foot in impact fees, at least $661,260.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Golden Beach charge its own impact fees?
Yes. Golden Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Golden Beach, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.