A new single-family home in Florida City pays at least $12,250.55 per unit in impact fees (rates sourced July 24, 2026). All of it is levied by Miami-Dade County.
The largest line items are Road (Mobility) Impact Fee (Miami-Dade County) ($9,275.00), Educational Facilities (School) Impact Fee (Miami-Dade County) ($2,448.00) and Fire-Rescue Impact Fee (Miami-Dade County) ($527.55).
Sewer Connection/Capacity Fee (City of Florida City Utilities) and Water Connection/Capacity Fee (City of Florida City Utilities) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Florida City Impact Fee Schedule
- Water Connection/Capacity Fee (City of Florida City Utilities)Requires confirmationCity of Florida City UtilitiesFlorida City charges a water plant connection charge computed per gallon of estimated maximum-day use, payable before building permit; additional tapping and meter-installation fees also apply. The per-gallon rate is set by city commission resolution and is not published, so no fixed figure is shown here.
- Sewer Connection/Capacity Fee (City of Florida City Utilities)Requires confirmationCity of Florida City UtilitiesFlorida City charges a sewer connection fee equal to 50% of the Miami-Dade WASD connection charge, based on estimated daily gallonage and payable before building permit. Because the amount depends on the current WASD rate and the project's gallonage, no fixed figure is shown here.
- Police Impact Fee (City of Florida City)$0.00City of Florida CityThe City of Florida City does not charge a municipal police impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Parks & Recreation Impact Fee (City of Florida City)$0.00City of Florida CityThe City of Florida City does not charge a municipal parks and recreation impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Road (Mobility) Impact Fee (Miami-Dade County)$9,275.00Miami-Dade CountyThis road (mobility) impact fee is paid countywide to Miami-Dade County. The rate varies by the geographic Context Zone assigned to each parcel; the amount shown is the lowest-zone (Zone 2) rate for a detached single-family home, and parcels in higher zones pay more. A separate 2% administrative charge applies on top of the base. The current schedule runs through the end of 2027.
- Educational Facilities (School) Impact Fee (Miami-Dade County)$2,448.00Miami-Dade County Public SchoolsThis educational-facilities (school) impact fee is charged countywide by Miami-Dade County, including within municipalities. It is calculated as $612 per unit plus $0.918 per gross square foot (capped at 3,800 sq ft); the amount shown is for a 2,000 sq ft single-family house. The current schedule runs through the end of 2027.
- Fire-Rescue Impact Fee (Miami-Dade County)$527.55Miami-Dade CountyThis fire-rescue impact fee is collected by Miami-Dade County in areas served by Miami-Dade Fire Rescue, which includes this jurisdiction; the amount shown is the current per-unit rate. It does not apply in the municipalities that operate their own fire departments (Miami, Miami Beach, Hialeah, Coral Gables, and Key Biscayne). The current schedule runs through the end of 2027.
Where in Miami-Dade County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florida City: Multifamily Impact Fees
A new multifamily unit in Florida City pays at least $6,522.55 per unit in impact fees (rates sourced July 24, 2026). All of it is levied by Miami-Dade County.
The largest line items are Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF) ($4,465.00), Educational Facilities (School) Impact Fee (Miami-Dade County, MF) ($1,530.00) and Fire-Rescue Impact Fee (Miami-Dade County, MF) ($527.55).
Water Connection/Capacity Fee (City of Florida City Utilities, MF) and Sewer Connection/Capacity Fee (City of Florida City Utilities, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Florida City Impact Fee Schedule
- Water Connection/Capacity Fee (City of Florida City Utilities, MF)Requires confirmationCity of Florida City UtilitiesFlorida City charges a water plant connection charge computed per gallon of estimated maximum-day use, payable before building permit; additional tapping and meter-installation fees also apply. The per-gallon rate is set by city commission resolution and is not published, so no fixed per-unit figure is shown here.
- Sewer Connection/Capacity Fee (City of Florida City Utilities, MF)Requires confirmationCity of Florida City UtilitiesFlorida City charges a sewer connection fee equal to 50% of the Miami-Dade WASD connection charge, based on estimated daily gallonage and payable before building permit. Multifamily uses the same per-gallon basis, so no fixed per-unit figure is shown here.
- Parks & Recreation Impact Fee (City of Florida City, MF)$0.00City of Florida CityThe City of Florida City does not charge a municipal parks and recreation impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Police Impact Fee (City of Florida City, MF)$0.00City of Florida CityThe City of Florida City does not charge a municipal police impact fee; no impact fees appear in its published code of ordinances or fee schedule.
- Road (Mobility) Impact Fee - Mid/High-Rise (Miami-Dade County) (MF)$4,465.00Mid/High-Rise (3+ stories)Miami-Dade CountyThis road (mobility) impact fee is paid countywide to Miami-Dade County. It applies to mid- and high-rise multifamily buildings (3 or more stories), and the rate varies by the Context Zone assigned to each parcel; the amount shown is the lowest-zone (Zone 2) rate, and parcels in higher zones pay more. A separate 2% administrative charge applies on top of the base. The current schedule runs through the end of 2027.
- Educational Facilities (School) Impact Fee (Miami-Dade County, MF)$1,530.00Miami-Dade County Public SchoolsMiami-Dade County educational facilities (school) impact fee, charged countywide including all municipalities. $612 per unit plus $0.918 per sq ft; shown here for a 1,000 sq ft unit ($1,530). Current schedule effective 12/31/2024 through 12/30/2027.
- Fire-Rescue Impact Fee (Miami-Dade County, MF)$527.55Miami-Dade CountyThis fire-rescue impact fee is collected by Miami-Dade County in areas served by Miami-Dade Fire Rescue, which includes this jurisdiction; the amount shown is the current per-unit rate. It does not apply in the municipalities that operate their own fire departments (Miami, Miami Beach, Hialeah, Coral Gables, and Key Biscayne). The current schedule runs through the end of 2027.
Where in Miami-Dade County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florida City: Commercial Impact Fees
Commercial development in Florida City pays $19.07 per square foot in impact fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to at least $953,330.00. The calculator below adjusts to your exact square footage.
The largest line items are Fire-Rescue Impact Fee (Miami-Dade County, Commercial) ($0.56/sq ft).
Road Impact Fee (City of Florida City, Commercial) — 40% of Miami-Dade mobility fee and Road (Mobility) Impact Fee (Miami-Dade County, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Plant Connection Charge (City of Florida City Utilities) and Sewage System Connection Charge (City of Florida City Utilities) — 50% of WASD $5.60/gal are set by the utility and not published online. Park & Recreation and Infrastructure Impact Fees (City of Florida City, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Florida City Impact Fee Schedule
- Water Plant Connection Charge (City of Florida City Utilities)Requires confirmationCity of Florida City Utilities
- Sewage System Connection Charge (City of Florida City Utilities) — 50% of WASD $5.60/galContact jurisdiction/utility to verifyCity of Florida City UtilitiesThe City of Florida City charges a one-time sewage system connection fee equal to 50% of the Miami-Dade WASD connection charge — $2.80 per gallon of average daily flow — payable before building permit.
- Road Impact Fee (City of Florida City, Commercial) — 40% of Miami-Dade mobility fee$5.29/sq ftRequires confirmationCity of Florida CityCity road impact fee set at 40% of the applicable Miami-Dade County road (mobility) impact fee, and charged in addition to that county fee.
- Park & Recreation and Infrastructure Impact Fees (City of Florida City, Commercial)Requires confirmationCity of Florida City
- Road (Mobility) Impact Fee (Miami-Dade County, Commercial)$13.22/sq ftRequires confirmationMiami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County, Commercial)$0.56/sq ftMiami-Dade County Fire Rescue District
- Police Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade County
Where in Miami-Dade County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florida City: Industrial Impact Fees
Industrial development in Florida City pays $9.34 per square foot in impact fees (rates sourced July 24, 2026).
For a 50,000 sq ft building, that comes to at least $467,140.00. The calculator below adjusts to your exact square footage.
The largest line items are Fire-Rescue Impact Fee (Miami-Dade County, Industrial) ($1.71/sq ft).
Road Impact Fee (City of Florida City, Industrial) — 40% of Miami-Dade mobility fee and Road (Mobility) Impact Fee (Miami-Dade County, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Plant Connection Charge (City of Florida City Utilities) and Sewage System Connection Charge (City of Florida City Utilities) — 50% of WASD $5.60/gal are set by the utility and not published online. Park & Recreation and Infrastructure Impact Fees (City of Florida City, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Florida City Impact Fee Schedule
- Water Plant Connection Charge (City of Florida City Utilities)Requires confirmationCity of Florida City Utilities
- Sewage System Connection Charge (City of Florida City Utilities) — 50% of WASD $5.60/galContact jurisdiction/utility to verifyCity of Florida City UtilitiesThe City of Florida City charges a one-time sewage system connection fee equal to 50% of the Miami-Dade WASD connection charge — $2.80 per gallon of average daily flow — payable before building permit.
- Road Impact Fee (City of Florida City, Industrial) — 40% of Miami-Dade mobility fee$2.18/sq ftRequires confirmationCity of Florida CityCity road impact fee set at 40% of the applicable Miami-Dade County road (mobility) impact fee, and charged in addition to that county fee.
- Park & Recreation and Infrastructure Impact Fees (City of Florida City, Industrial)Requires confirmationCity of Florida City
- Road (Mobility) Impact Fee (Miami-Dade County, Industrial)$5.45/sq ftRequires confirmationMiami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County, Industrial)$1.71/sq ftMiami-Dade County Fire Rescue District
- Police Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade County
Where in Miami-Dade County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florida City: Office Impact Fees
Office development in Florida City pays $27.61 per square foot in impact fees (rates sourced July 24, 2026).
For a 25,000 sq ft building, that comes to at least $690,247.50. The calculator below adjusts to your exact square footage.
The largest line items are Fire-Rescue Impact Fee (Miami-Dade County, Office) ($0.42/sq ft).
Road Impact Fee (City of Florida City, Office) — 40% of Miami-Dade mobility fee and Road (Mobility) Impact Fee (Miami-Dade County, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Plant Connection Charge (City of Florida City Utilities) and Sewage System Connection Charge (City of Florida City Utilities) — 50% of WASD $5.60/gal are set by the utility and not published online. Park & Recreation and Infrastructure Impact Fees (City of Florida City, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Florida City Impact Fee Schedule
- Water Plant Connection Charge (City of Florida City Utilities)Requires confirmationCity of Florida City Utilities
- Sewage System Connection Charge (City of Florida City Utilities) — 50% of WASD $5.60/galContact jurisdiction/utility to verifyCity of Florida City UtilitiesThe City of Florida City charges a one-time sewage system connection fee equal to 50% of the Miami-Dade WASD connection charge — $2.80 per gallon of average daily flow — payable before building permit.
- Road Impact Fee (City of Florida City, Office) — 40% of Miami-Dade mobility fee$7.77/sq ftRequires confirmationCity of Florida CityCity road impact fee set at 40% of the applicable Miami-Dade County road (mobility) impact fee, and charged in addition to that county fee.
- Park & Recreation and Infrastructure Impact Fees (City of Florida City, Office)Requires confirmationCity of Florida City
- Road (Mobility) Impact Fee (Miami-Dade County, Office)$19.42/sq ftRequires confirmationMiami-Dade County
- Fire-Rescue Impact Fee (Miami-Dade County, Office)$0.42/sq ftMiami-Dade County Fire Rescue District
- Police Impact Fee (Miami-Dade County, Office)$0.00Miami-Dade County
Where in Miami-Dade County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Florida City Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Florida City Impact Fee FAQs
What are the total impact fees for a single-family home in Florida City, Florida?
A new single-family home in Florida City pays at least $12,250.55 per unit in combined impact fees (rates sourced July 24, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Florida City?
Commercial development in Florida City pays $19.07 per square foot in impact fees, at least $953,330.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Florida City charge its own impact fees?
Yes. Florida City levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Florida City, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.