Hialeah impact fees by project type
Hialeah: Single-Family Impact Fees
A new single-family home in Hialeah pays at least $13,190.90 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $11,723.00 and municipal or utility fees for $1,467.90.
The largest line items are Transportation Impact Fee (SFR, Zone 2) ($9,275.00), School Impact Fee (SFR) ($2,448.00) and Sewer Connection Charge (Miami-Dade WASD) ($1,176.00).
Parks & Recreation Impact Fee (City of Hialeah), Fire-Rescue Impact Fee (City of Hialeah), and Police Impact Fee (City of Hialeah) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD)$291.90Miami-Dade Water & Sewer Dept (WASD)WASD water connection charge = $1.39/avg daily gallon (Sec. 9, eff. Oct 1, 2024). Standard SFR under 3,001 sq ft = 210 gpd → 210 × $1.39 = $291.90. WASD serves Hialeah.
- Sewer Connection Charge (Miami-Dade WASD)$1,176.00Miami-Dade Water & Sewer Dept (WASD)WASD wastewater connection charge = $5.60/avg daily gallon (Wastewater Sec. 4, eff. Oct 1, 2024). Standard SFR under 3,001 sq ft = 210 gpd → 210 × $5.60 = $1,176.00. CORRECTED: prior value used the water rate ($1.39) in error.
- Parks & Recreation Impact Fee (City of Hialeah)Requires confirmationCity of HialeahCORRECTED: Park impact fee collected by the city, not the county. Hialeah has its own parks & recreation impact fee (Municode Sec. 98-2552). Amount pending confirmation from city fee schedule. Contact Hialeah Building/P&Z 305-883-8075.
- Fire-Rescue Impact Fee (City of Hialeah)Requires confirmationCity of HialeahHialeah has its own fire dept and collects its own fire-rescue impact fee (county fire fee does NOT apply per Miami-Dade impact fee page). Amount pending city fee schedule. Contact Hialeah Building/P&Z 305-883-8075.
- Police Impact Fee (City of Hialeah)Requires confirmationCity of HialeahPolice impact fee collected by the city, not the county. Hialeah police impact fee (Municode Sec. 98-2570 et seq.). Amount pending city fee schedule. Contact Hialeah Building/P&Z 305-883-8075.
- $9,275.00
- $2,448.00
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hialeah: Multifamily Impact Fees
A new multifamily unit in Hialeah pays at least $6,020.65 per unit in impact fees (rates sourced July 14, 2026). Of that, Miami-Dade County-levied fees account for $5,077.00 and municipal or utility fees for $943.65.
The largest line items are Transportation Impact Fee - Mid-Rise (Context Zone 2) ($4,465.00), Sewer Connection Charge (Miami-Dade WASD) (MF) ($756.00) and Educational Facilities (School) Impact Fee (Miami-Dade County) (MF) ($612.00).
Parks & Recreation Impact Fee (City of Hialeah, MF), Police Impact Fee (City of Hialeah, MF), and Fire-Rescue Impact Fee (City of Hialeah, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection Charge (Miami-Dade WASD) (MF)$187.65Miami-Dade Water & Sewer Dept (WASD)WASD water connection charge = $1.39/avg daily gallon. Apartment/MF unit = 135 gpd → $187.65. CORRECTED from prior $139. WASD serves Hialeah.
- Sewer Connection Charge (Miami-Dade WASD) (MF)$756.00Miami-Dade Water & Sewer Dept (WASD)WASD wastewater connection charge = $5.60/avg daily gallon. Apartment/MF unit = 135 gpd → $756.00. CORRECTED: prior $139 used water rate & 100 gpd.
- Parks & Recreation Impact Fee (City of Hialeah, MF)Requires confirmationCity of HialeahCORRECTED: Park fee city-collected, not county. Hialeah parks & rec impact fee (Sec. 98-2552) amount pending. Contact Hialeah Building/P&Z 305-883-8075.
- Police Impact Fee (City of Hialeah, MF)Requires confirmationCity of HialeahCORRECTED: Police fee city-collected, not county. Hialeah police impact fee (Sec. 98-2570 et seq.) amount pending. Contact Hialeah Building/P&Z 305-883-8075.
- Fire-Rescue Impact Fee (City of Hialeah, MF)Requires confirmationCity of HialeahCORRECTED: County Fire fee does NOT apply in Hialeah (own fire dept). City fire-rescue impact fee amount pending. Contact Hialeah Building/P&Z 305-883-8075.
- Transportation Impact Fee - Mid-Rise (Context Zone 2)$4,465.00Miami-Dade CountyCounty Road/Mobility, MF Mid/High-Rise (same rate), Context Zone 2 (representative). Z1 $4,638 / Z2 $4,465 / Z3 $4,901 / Z4 $5,115. Default tier (3+ stories). Countywide.
- Educational Facilities (School) Impact Fee (Miami-Dade County) (MF)$612.00Miami-Dade CountyCounty Educational Facilities fee = $612/unit + $0.918/gsf. Countywide.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hialeah: Commercial Impact Fees
Commercial development in Hialeah pays $13.43 per square foot in impact fees, plus $3,941.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $675,201.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $2,975/ERC ($2,975.00 one-time), Wastewater Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $966/ERC ($966.00 one-time) and Road (Mobility) Impact Fee (Miami-Dade County, Commercial) ($11.54/sq ft).
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $2,975/ERC$2,975.00 one-timeCity of Hialeah Department of Water & SewersPROVIDER CORRECTION — HIALEAH IS NOT WASD. The city runs its own Department of Water & Sewers and levies its own capital charge under Code Sec. 94-162 (the residential pass had Hialeah down as a WASD retail customer). NO METER LADDER for nonres: Sec. 94-162(d)(2)c prices nonresidential service on flow — Water Capital Charge = (average dependable daily capacity in GPD ÷ 350) × $2,975.00. 1 ERC = 350 GPD. The $2,975/ERC is the sum of two published components: water impact fee—plant $2,726.50/ERC ($7.79/gal of plant capacity) + water impact fee—transmission/distribution $248.50/ERC ($0.71/gal). Per-gallon equivalent: $8.50/gal. Amount entered = the 1.0-ERC minimum. ERCs are computed to the nearest 0.1. The applicant must submit an estimate of average dependable daily capacity for city approval before permit issuance. Sec. 94-162(c)(1): this charge is over and above any service installation fee, lateral charge, inspection fee or utility assessment. Sec. 94-158 adds a surcharge for service outside city limits.
- Wastewater Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $966/ERC$966.00 one-timeCity of Hialeah Department of Water & SewersPROVIDER CORRECTION — HIALEAH IS NOT WASD; the city runs its own Department of Water & Sewers. Code Sec. 94-162(d)(1): wastewater capital charge = $966.00 per ERC ($2.76 per gallon of capacity). NO METER LADDER for nonres: Sec. 94-162(d)(2)c prices it on flow — Wastewater Capital Charge = (average dependable daily capacity in GPD ÷ 350) × $966.00. 1 ERC = 350 GPD (wastewater). Amount entered = the 1.0-ERC minimum. ERCs computed to the nearest 0.1. Charge is over and above service installation, lateral, inspection and utility assessment charges (Sec. 94-162(c)(1)); Sec. 94-158 adds an outside-city surcharge.
- Transportation Impact Fee (City of Hialeah, Commercial)$1.32/sq ftCity of HialeahCITY'S OWN transportation impact fee — separate from and IN ADDITION TO the Miami-Dade Ch. 33E mobility fee. Code Sec. 98-2581 (Ord. 2021-059, 6-22-2021; permits issued on/after 2-1-2022). Schedule row: 'SC retail 50K+ to 200K' = roadway $1,278 + transit $47 = $1,325 per 1,000 SF. This is the canonical tier (contains 50,000 sq ft GFA). Verified against the city's posted Impact Fee Rate Schedule (hialeahfl.gov DocumentCenter/View/13794). No phase-in on this fee.
- Police Impact Fee (City of Hialeah, Commercial)$0.51/sq ftCity of HialeahCode Sec. 98-2571 (Ord. 2021-059, 6-22-2021; Ord. 2021-112, 11-9-2021), permits on/after 2-1-2022. Schedule has exactly two rows: Residential $268.87/DU and NON-RESIDENTIAL $511.16 per 1,000 SF of floor area. Single nonres rate — no category split in schedule. Paid at building-permit issuance. Basis: Police Impact Fee Study (Walter H. Keller, Inc., 5-21-2021).
- Fire-Rescue Impact Fee (City of Hialeah, Commercial)$0.05/sq ftCity of HialeahHialeah runs its own fire department, so the county fire fee does not apply and this city fee does. Code Sec. 98-2562 (Ord. 2021-102, 10-12-2021), permits on/after 2-1-2022. Schedule row: 'Retail'. FOUR-STEP PHASE-IN NOW COMPLETE — the terminal column 'Effective 10/1/24 and after' is in force: $52.05 per 1,000 SF (steps were $39.04 / $43.38 / $47.72 / $52.05). No further step-ups scheduled. This fee is NOT on the city's posted Impact Fee Rate Schedule PDF (which shows only police, transportation and parks) — read it from the code.
- Park & Recreation Impact Fee (City of Hialeah, Commercial)$0.00City of HialeahCONFIRMED $0 — residential-only fee. Code Sec. 98-2551(b) finds that park facilities 'benefit all residents and residential properties within the city', and the Park and Recreation Impact Fee Rate Schedule has ONLY residential rows (single-family $2,542, MF 2-4 units $2,232, MF 5+ $1,970, mobile home $2,268 per dwelling unit). No nonresidential row exists. Contrast Sec. 98-2571 (police) and Sec. 98-2581 (transportation), which expressly reach 'businesses'.
- Road (Mobility) Impact Fee (Miami-Dade County, Commercial)$11.54/sq ftMiami-Dade CountyMultimodal Mobility Impact Fee, Code Ch. 33E (Ord. 23-68). Countywide incl. all municipalities. Schedule row: 'Shopping Plaza (40-150 kgsf) w/o Supermarket', Context Zone 2 ($11.537/sf). ZONE CONFIRMED: Code Sec. 33E-7.1(b)(2) NAMES Hialeah in Zone 2 (Inner Ring). STACKS with the City of Hialeah's own transportation impact fee (Code Sec. 98-2581) — they are separate fees, not substitutes. Excludes 2% admin fee.
- Police Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade CountyCONFIRMED $0. Code Sec. 33I-1(b) limits the county police impact fee to unincorporated Miami-Dade County. Hialeah levies its own police impact fee (Sec. 98-2571).
- Fire-Rescue Impact Fee (Miami-Dade County, Commercial)$0.00Miami-Dade County Fire Rescue DistrictCONFIRMED $0. Code Sec. 33J-1(b) applies the county fire fee only within the Fire Rescue District. Hialeah runs its OWN fire department and is not in the district; it levies its own fire-rescue impact fee (Code Sec. 98-2561/2562, entered separately).
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hialeah: Industrial Impact Fees
Industrial development in Hialeah pays $6.19 per square foot in impact fees, plus $3,941.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 50,000 sq ft building, that comes to about $313,199.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $2,975/ERC ($2,975.00 one-time), Wastewater Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $966/ERC ($966.00 one-time) and Road (Mobility) Impact Fee (Miami-Dade County, Industrial) ($4.76/sq ft).
View the full fee schedule
- Water Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $2,975/ERC$2,975.00 one-timeCity of Hialeah Department of Water & SewersPROVIDER CORRECTION — HIALEAH IS NOT WASD. The city runs its own Department of Water & Sewers and levies its own capital charge under Code Sec. 94-162 (the residential pass had Hialeah down as a WASD retail customer). NO METER LADDER for nonres: Sec. 94-162(d)(2)c prices nonresidential service on flow — Water Capital Charge = (average dependable daily capacity in GPD ÷ 350) × $2,975.00. 1 ERC = 350 GPD. The $2,975/ERC is the sum of two published components: water impact fee—plant $2,726.50/ERC ($7.79/gal of plant capacity) + water impact fee—transmission/distribution $248.50/ERC ($0.71/gal). Per-gallon equivalent: $8.50/gal. Amount entered = the 1.0-ERC minimum. ERCs are computed to the nearest 0.1. The applicant must submit an estimate of average dependable daily capacity for city approval before permit issuance. Sec. 94-162(c)(1): this charge is over and above any service installation fee, lateral charge, inspection fee or utility assessment. Sec. 94-158 adds a surcharge for service outside city limits.
- Wastewater Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $966/ERC$966.00 one-timeCity of Hialeah Department of Water & SewersPROVIDER CORRECTION — HIALEAH IS NOT WASD; the city runs its own Department of Water & Sewers. Code Sec. 94-162(d)(1): wastewater capital charge = $966.00 per ERC ($2.76 per gallon of capacity). NO METER LADDER for nonres: Sec. 94-162(d)(2)c prices it on flow — Wastewater Capital Charge = (average dependable daily capacity in GPD ÷ 350) × $966.00. 1 ERC = 350 GPD (wastewater). Amount entered = the 1.0-ERC minimum. ERCs computed to the nearest 0.1. Charge is over and above service installation, lateral, inspection and utility assessment charges (Sec. 94-162(c)(1)); Sec. 94-158 adds an outside-city surcharge.
- Transportation Impact Fee (City of Hialeah, Industrial)$0.76/sq ftCity of HialeahCity's own transportation impact fee, separate from the county mobility fee. Code Sec. 98-2581 (Ord. 2021-059). Schedule row: 'Industrial park' = roadway $743 + transit $13 = $756 per 1,000 SF. NOTE: the schedule has NO 'General Light Industrial' row — Industrial park (ITE 130) is the general industrial row and was used. Separate Manufacturing ($599) and Warehousing ($265) rows exist but are alternate land uses and are not entered.
- Police Impact Fee (City of Hialeah, Industrial)$0.51/sq ftCity of HialeahCode Sec. 98-2571. Single nonres rate ($511.16 per 1,000 SF) — no category split in schedule.
- Fire-Rescue Impact Fee (City of Hialeah, Industrial)$0.16/sq ftCity of HialeahCode Sec. 98-2562 (Ord. 2021-102). Schedule row: 'Industrial/warehouse' — $158.00 per 1,000 SF, flat across all four phase-in columns (no step-up). Not on the city's posted rate-schedule PDF — code only.
- Park & Recreation Impact Fee (City of Hialeah, Industrial)$0.00City of HialeahCONFIRMED $0 — residential-only fee. Sec. 98-2551(b) limits the park fee to residents and residential properties; the rate schedule has no nonresidential row.
- Road (Mobility) Impact Fee (Miami-Dade County, Industrial)$4.76/sq ftMiami-Dade CountyCode Ch. 33E mobility fee. Schedule row: 'General Light Industrial', Context Zone 2 ($4.760/sf). Sec. 33E-7.1(b)(2) NAMES Hialeah in Zone 2. Stacks with the city's own transportation fee. Excludes 2% admin fee.
- Fire-Rescue Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade County Fire Rescue DistrictCONFIRMED $0. Hialeah runs its own fire department and is outside the MDFR district (Code Sec. 33J-1(b)); it levies its own fire-rescue impact fee.
- Police Impact Fee (Miami-Dade County, Industrial)$0.00Miami-Dade CountyCONFIRMED $0. Code Sec. 33I-1(b) limits the county police impact fee to unincorporated Miami-Dade County.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Hialeah: Office Impact Fees
Office development in Hialeah pays $19.58 per square foot in impact fees, plus $3,941.00 in one-time water and sewer connection fees (rates sourced July 14, 2026).
For a 25,000 sq ft building, that comes to about $493,483.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $2,975/ERC ($2,975.00 one-time), Wastewater Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $966/ERC ($966.00 one-time) and Road (Mobility) Impact Fee (Miami-Dade County, Office) ($16.95/sq ft).
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $2,975/ERC$2,975.00 one-timeCity of Hialeah Department of Water & SewersPROVIDER CORRECTION — HIALEAH IS NOT WASD. The city runs its own Department of Water & Sewers and levies its own capital charge under Code Sec. 94-162 (the residential pass had Hialeah down as a WASD retail customer). NO METER LADDER for nonres: Sec. 94-162(d)(2)c prices nonresidential service on flow — Water Capital Charge = (average dependable daily capacity in GPD ÷ 350) × $2,975.00. 1 ERC = 350 GPD. The $2,975/ERC is the sum of two published components: water impact fee—plant $2,726.50/ERC ($7.79/gal of plant capacity) + water impact fee—transmission/distribution $248.50/ERC ($0.71/gal). Per-gallon equivalent: $8.50/gal. Amount entered = the 1.0-ERC minimum. ERCs are computed to the nearest 0.1. The applicant must submit an estimate of average dependable daily capacity for city approval before permit issuance. Sec. 94-162(c)(1): this charge is over and above any service installation fee, lateral charge, inspection fee or utility assessment. Sec. 94-158 adds a surcharge for service outside city limits.
- Wastewater Capital Charge (City of Hialeah Dept. of Water & Sewers) — 1.0 ERC × $966/ERC$966.00 one-timeCity of Hialeah Department of Water & SewersPROVIDER CORRECTION — HIALEAH IS NOT WASD; the city runs its own Department of Water & Sewers. Code Sec. 94-162(d)(1): wastewater capital charge = $966.00 per ERC ($2.76 per gallon of capacity). NO METER LADDER for nonres: Sec. 94-162(d)(2)c prices it on flow — Wastewater Capital Charge = (average dependable daily capacity in GPD ÷ 350) × $966.00. 1 ERC = 350 GPD (wastewater). Amount entered = the 1.0-ERC minimum. ERCs computed to the nearest 0.1. Charge is over and above service installation, lateral, inspection and utility assessment charges (Sec. 94-162(c)(1)); Sec. 94-158 adds an outside-city surcharge.
- Transportation Impact Fee (City of Hialeah, Office)$1.57/sq ftCity of HialeahCity's own transportation impact fee, separate from the county mobility fee. Code Sec. 98-2581 (Ord. 2021-059). Schedule row: 'General office building less than 50K' = roadway $1,542 + transit $27 = $1,569 per 1,000 SF. Canonical tier (contains 25,000 sq ft).
- Fire-Rescue Impact Fee (City of Hialeah, Office)$0.55/sq ftCity of HialeahCode Sec. 98-2562 (Ord. 2021-102). Schedule row: 'Office'. Terminal phase-in column 'Effective 10/1/24 and after' in force: $547.52 per 1,000 SF (steps were $450.53 / $482.86 / $515.19 / $547.52). Not on the city's posted rate-schedule PDF — code only.
- Police Impact Fee (City of Hialeah, Office)$0.51/sq ftCity of HialeahCode Sec. 98-2571. Single nonres rate ($511.16 per 1,000 SF) — no category split in schedule.
- Park & Recreation Impact Fee (City of Hialeah, Office)$0.00City of HialeahCONFIRMED $0 — residential-only fee. Sec. 98-2551(b) limits the park fee to residents and residential properties; the rate schedule has no nonresidential row.
- Road (Mobility) Impact Fee (Miami-Dade County, Office)$16.95/sq ftMiami-Dade CountyCode Ch. 33E mobility fee. Schedule row: 'General Office, 1-50,000 gsf', Context Zone 2 ($16.954/sf). Sec. 33E-7.1(b)(2) NAMES Hialeah in Zone 2. Stacks with the city's own transportation fee. Excludes 2% admin fee.
- Fire-Rescue Impact Fee (Miami-Dade County, Office)$0.00Miami-Dade County Fire Rescue DistrictCONFIRMED $0. Hialeah runs its own fire department and is outside the MDFR district (Code Sec. 33J-1(b)); it levies its own fire-rescue impact fee.
- Police Impact Fee (Miami-Dade County, Office)$0.00Miami-Dade CountyCONFIRMED $0. Code Sec. 33I-1(b) limits the county police impact fee to unincorporated Miami-Dade County.
Where in Miami-Dade County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Hialeah
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Hialeah, Florida?
A new single-family home in Hialeah pays at least $13,190.90 per unit in combined impact fees (rates sourced July 14, 2026). 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Hialeah?
Commercial development in Hialeah pays $13.43 per square foot in impact fees, plus $3,941.00 in one-time water and sewer connection fees, about $675,201.50 for a 50,000 sq ft building.
Does Hialeah charge its own impact fees?
Yes. Hialeah levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Hialeah, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Miami-Dade County impact fees page.